If you register, you can do a lot more. And become an active part of our growing community. You'll have access to hidden forums, and enjoy the ability of replying and starting conversations.

Tornado

Discussion in 'Steam Traction' started by Leander's Shovel, Oct 20, 2007.

  1. michaelh

    michaelh Part of the furniture

    Joined:
    Apr 29, 2006
    Messages:
    3,080
    Likes Received:
    1,291
    Gender:
    Male
    Occupation:
    Very comfortably early retired
    Location:
    1029
    Heritage Railway Volunteer:
    Yes I am an active volunteer

    Big Spread on Tornado in latest "Heritage Railway"
     
  2. stan the man

    stan the man Member

    Joined:
    Sep 30, 2005
    Messages:
    563
    Likes Received:
    11
     
  3. stan what are you trying to say i dont get it
     
  4. dace83

    dace83 Well-Known Member

    Joined:
    May 7, 2007
    Messages:
    2,095
    Likes Received:
    4
    i think it is becuase there was no reason for michaelh to use the quote made by ian f in saying there is a big spread in HR, the two arent really linked
     
  5. petej502

    petej502 New Member

    Joined:
    Oct 6, 2005
    Messages:
    61
    Likes Received:
    0
    Location:
    Cardiff
    What whistle(s) will Tornado be fitted with. Will it have just the standard LNER or will it be fitted with an additional chime whistle behind the smoke deflectors like the other preserved LNER pacifics?
     
  6. Mark_Allatt

    Mark_Allatt New Member

    Joined:
    Jan 18, 2007
    Messages:
    51
    Likes Received:
    1
    Occupation:
    Chairman, A1SLT
    Talisman

    Join Bittern to Newcastle - and support Tornado!
    The A1 Steam Locomotive Trust still has some places available on the 'Talisman' on March 1, which runs from King's Cross to Newcastle and return, and uses 'A4' No. 60019 Bittern from Grantham.
    We're hoping for a cracking day out - this is the railtour that takes Bittern back to its long-time Newcastle home - and plenty of good running in the tradition of the 'Talismans' already run.
    What's more, all profits go towards finishing new 'A1' 60163 Tornado, so you know you're cntributing to a great cause as well. Tornado passed its steam test on 11th January, so we're really on the home straight, but we do need a last push.
    Tickets can be booked through our agents Steam Dreams (Tel. 01483 209886) and cost £72.50 (Standard) and £169 (Dining). Provisional departure times are King's Cross 0818, Potters Bar 0832, Stevenage 0854 and Peterborough 0934. Arrival back in London is expected at 2151, with set-downs corresponding to the outward run.
    I really hope you can join us.
     
  7. No.7

    No.7 Well-Known Member

    Joined:
    Sep 7, 2005
    Messages:
    1,625
    Likes Received:
    101
    Already booked (have been for sometime....)

    Is the loco change at Grantham off-platform? Also will 60019 be using the double tender for an extended non-stop run?

    Thanks.
     
  8. malc

    malc Part of the furniture

    Joined:
    Jun 28, 2005
    Messages:
    2,419
    Likes Received:
    289
    60019 now comes on at Peterborough (presumably in the West Yard, rather than the station) and off at York on the return.
     
  9. green five

    green five Resident of Nat Pres

    Joined:
    Apr 30, 2006
    Messages:
    6,610
    Likes Received:
    2,264
    Gender:
    Male
    Location:
    Hampshire
    Heritage Railway Volunteer:
    No I do not currently volunteer
    Going by what it says in the latest HR the MHR shed folk are not keen on using the 2nd tender as it causes problems with the braking system thus it's absence from her first 2 runs. Don't know whether the problems have been sorted yet.
     
  10. No.7

    No.7 Well-Known Member

    Joined:
    Sep 7, 2005
    Messages:
    1,625
    Likes Received:
    101
    Yes just got home and found the tickets had arrived and confirmed this is now Peterborough - Newcastle - York.

    Also mention of a waterstop at Grantham. So I assume the steam legs are:

    Peterborugh-Grantham, Grantham - York, York-Newcastle, Newcastle-York.
     
  11. guycarr360

    guycarr360 Part of the furniture

    Joined:
    Oct 4, 2005
    Messages:
    4,414
    Likes Received:
    2,730
    Gender:
    Male
    Location:
    Chester le Street County Durham
    60019 probably stabled at NRM, following run south from newcastle. Then forward to NYMR at some stage for Gala, it has no other work on UK steam for March.
     
  12. Mark_Allatt

    Mark_Allatt New Member

    Joined:
    Jan 18, 2007
    Messages:
    51
    Likes Received:
    1
    Occupation:
    Chairman, A1SLT
    Talisman update

    Join Bittern to Newcastle - and support Tornado!
    The A1 Steam Locomotive Trust still has some places available on the 'Talisman' on March 1, which runs from King's Cross to Newcastle and return, and uses 'A4' No. 60019 Bittern. PLEASE NOTE THAT WE'VE NOW HAD IT CONFIRMED THAT THE STEAM LEGS WILL BE PETERBOROUGH-NEWCASTLE AND NEWCASTLE-YORK.
    We're hoping for a cracking day out - this is the railtour that takes Bittern back to its long-time Newcastle home - and plenty of good running in the tradition of the 'Talismans' already run.
    What's more, all profits go towards finishing new 'A1' 60163 Tornado, so you know you're cntributing to a great cause as well. Tornado passed its steam test on 11th January, so we're really on the home straight, but we do need a last push.
    Tickets can be booked through our agents Steam Dreams (Tel. 01483 209886) and cost £72.50 (Standard) and £169 (Dining). Provisional departure times are King's Cross 0818, Potters Bar 0832, Stevenage 0854 and Peterborough 0934. Arrival back in London is expected at 2151, with set-downs corresponding to the outward run.
    I really hope you can join us.
     
  13. Mark_Allatt

    Mark_Allatt New Member

    Joined:
    Jan 18, 2007
    Messages:
    51
    Likes Received:
    1
    Occupation:
    Chairman, A1SLT
    Progress update - 19/01/2008

    FINANCE AND FUNDRAISING
    The funding gap needed to be bridged to complete Tornado has shrunk from £49,434 to £27,009 over the past month.

    Mark Allatt, chairman of The A1 Steam Locomotive Trust commented:

    “The lighting of the first fire and the successful completion of the boiler’s steam test are tremendous news for Tornado and the future of main line steam in Britain. There was no more appropriate person than Dorothy Mather to carry out this ceremonial task as she is the widow of Arthur Peppercorn who designed the class A1s.

    “The steam test was preceded by two days when Tornado’s boiler was slowly warmed, building up steam pressure. On Friday 11 January Tornado’s boiler reached its operating pressure of 250 lb/sq in overseen by representatives from the Trust’s Notified Body Delta Rail and boiler inspector John Glaze, before receiving its 10 year boiler certificate. The race is now on to complete the assembly of the locomotive as rapidly as possible.

    “With the success of the steam test and less than three months to go until Tornado first moves under her own steam you can feel the sense of anticipation in Darlington Locomotive Works. The Trust’s engineering team is working flat out to achieve this deadline with up to thirteen people working on the locomotive at any one time, excluding the multitude of contactors working on numerous components offsite.

    “We are delighted that our supporters’ continued generosity means that we are steadily reducing our funding gap, which is now under £30,000. With the steam test successfully concluded, it is now a matter of when, not if, Tornado will be completed. We are now looking to people throughout the country to help us complete Tornado through making a donation, sponsoring a component, taking part in our covenant scheme and/or our £500,000 bond issue. It’s time those who have not yet supported this ground breaking project to get on-board!”

    Although the funding gap to complete Tornado to the project plan now stands at £27,009, once this gap has been bridged the Trust will need to raise approximately £800,000 to service the loans taken out and bond issue taken up to ensure the locomotive’s completion.

    PROJECT PLAN
    The locomotive is now 96.5% complete and the tender 93.8% complete. Tornado is still on schedule to enter main line service in September 2008.



    ENGINERING OVERVIEW (DAVID ELLIOTT, DIRECTOR OF ENGINEERING)
    The main effort has been devoted to preparation for and conducting the boiler hydraulic and steam tests.

    MOTION
    The motion has taken a back seat whilst the locomotive has been prepared for the boiler steam test, however Ian Howitt has machined the connecting rod small end bearings and has sent them away for spark erosion of the pockets that contain the felt pads. On return the oilways will be machined.

    PIPE WORK AND FITTINGS
    All the pipework required for the boiler test has been hydraulic tested. The steam stand and its associated valves have passed their hydraulic test.

    The hydraulic test of the lower water gauge fittings proved less satisfactory with a pin hole in the neck of each casting causing a small leak. Fortunately we were donated a set of gauge fittings from 60130 Kestrel (the first Darlington built A1 and donated by a supporter many years ago) which whilst very worn, provided us with two serviceable lower castings. These required extensive de-furring as a result of that locomotive having worked in a very hard water area in its last days. This was achieved courtesy of three hours of simmering in a stainless steel saucepan on David Elliott’s domestic cooker using kettle de-scaling chemicals.

    GN Steam assisted in preparation for the boiler test by packing all the valve stuffing boxes and lapping in valves where required. John Haydon has piped up the turbogenerator – with steam pipework complete from the rear of the locomotive to the generator and from the generator exhaust to the fitting on the side of the smokebox. He also continues to make progress with the oil pipework. The oilbox castings have been received and are now at GN Steam where two boxes are almost complete.

    South Coast Steam has returned the vacuum ejector control valve, and GN Steam is overhauling the vacuum ejector bought from John Bunch. GN Steam is also making pipe connectors to suit the ejector, and the design for its installation on the side of the smokebox behind the deflector is almost complete. Steve Wood has made adapters to enable the remaining boiler steam fittings to be hydraulic tested before the boiler hydraulic/steam test in January.

    The Trust was also donated the whistle from 60130 Kestrel at the same time as the gauge fittings. A new whistle base is being cast by William Lane at Middlesbrough due to gauging issues, and the existing whistle base has been taken to GN Steam to assess whether the valve assembly can be re-used. On examination the conclusion is that it is somewhat worn, so new components will be made. Tornado will be fitted with a standard LNER whistle and a chime whistle as fitted to the Gresley class A4s.

    BRAKE AND SAFETY EQUIPMENT
    The ex diesel and electric locomotive brake equipment is being removed from the locomotive following trial fitting to be sent to Railway Brake Services Ltd for overhaul. The small air receivers are being internally inspected and hydraulically tested.

    Graeme Bunker has negotiated the purchase of a steam loco type AWS sunflower and cancelling lever unit which Mandy Sharpe will adapt for TPWS. Mandy is also ordering long lead TPWS equipment for us.


    BOILER ANCILLARIES
    The blast pipe assembly including blower rings were fitted in the smokebox for the steam test as were the chimney and liner. A large number of gaskets and quantities of packing material have been obtained for the steam test and beyond. The smoke box was partially sealed using mastic to enable the blower to function.

    We are waiting for quotes from Atlas at Oldham and Anglering at Birmingham for the main steam pipes. David Elliott has also received a quote for individual bends from Induction Pipe Bending Ltd at Sunderland who can make individual bends for fabricating into finished steam pipes.

    BOILER TESTS
    The hydraulic and boiler tests were successfully completed on the planned days, after some late night working. The hydraulic test was successfully completed on Monday 7th January 2008 in the presence of John Glaze (Boiler Inspector) and Paul Molyneux-Berry from the Deltarail VAB.

    The boiler was lit up for the first time by Dorothy Mather on Wednesday 9th January and allowed to warm slowly. Pressure was raised initially to 100 PSI on the following day and the live steam injector tested. This was fed from the DRPS loco water tank in the NELPG end of the building with the aid of several fire hoses kindly lent by NELPG. With the water tank delivery pump running, sufficient water was delivered to the injector to enable it to start first time.

    Pressure was subsequently raised to 175 PSI to further test the injector which continued to function correctly.

    On Friday 11th January, the formal steam test was carried out under the direction of John Glaze and Paul Molyneux-Berry and was successful. Towards the end of the steam test we had low water pressure in the area and the local fire brigade helped us to replenish the supply.

    Since then the loco has been taken back inside the works, the boiler drained once cool, the smokebox, tubes, firebox and grate pressure washed and various fittings removed to enable construction to be resumed.

    BEARING SPRING GEAR
    Cartazzi and tender springs have been delivered, the bogie coil springs are expected this week. Ian Howitt is making steady progress with the locomotive spring gear.

    CAB
    William Lane is in the process of casting the cab front window frames from patterns produced by Elsfield Patterns.

    GN Steam continues with the modifications to the cab floor and under seat cubicles

    ELECTRICAL SYSTEM (ROB MORLAND)
    Paul Depledge has been making good progress with the electrical installation on the tender and is now beginning to prepare for the TPWS installation by accumulating the various junction boxes required to terminate the antenna connections. The bulk of the LS0H wire has been delivered to Darlington. This will allow the pulling-through of the main wiring into the conduit runs as these are completed on locomotive and tender.

    David Elliott and Rob Morland have been working through the design of the in-cab system, which has taken some time as there is very restricted space available under the two crew seats for all the electrical equipment that is required. After looking at a variety of standard enclosures we have finally concluded that the best solution will be to construct our own to fit precisely in the spaces. These will be fabricated from 3mm steel plate and we will have them laser cut with all the holes needed for switches, connectors etc. Rob Morland will build and test the complete I/O Panels before delivering them to Darlington for fitting.

    David Elliott has completed the AutoCAD drawing for the Essential Services I/O Panel (under the driver’s seat) and Rob is currently preparing a sketch of the cut-outs required in the front and rear panels. Once completed DE will put these onto AutoCAD and they can then be loaded directly into the laser cutter to complete the panels. The metalwork will be painted for protection. DE is currently working on the drawing for the Auxiliary Services I/O Panel (under the fireman’s seat).

    For the Control Panels (which are located on the inside cab roof) we have been able to use standard diecast aluminium boxes, which are at Darlington for fitting. In this case the electrical installation will be attached to the front panel of each box – once again Rob will complete this work at home and the panels will be delivered to Darlington for fitting.

    One pair of the 65AH batteries is now in Darlington to assist in the design of the interiors of the battery boxes. As with the under-seat cubicles, space is at a premium here too, so getting the shelves in the right place is going to be important if everything is to fit and remain accessible.

    The first of the DC-DC converters has been delivered to C. P. Power in the UK and we will receive this shortly. This will enable work to proceed on the next stage of electrical circuit design, build and test. Most of the MIL-C-5015 connectors and all the specialist tooling have now been delivered to Rob and are awaiting completion of the under-seat cabinets to allow the wiring to commence.

    Roger Burgess has completed an excellent initial AutoCAD drawing of the main circuit schematic. This looks very good and we now await completion of the remainder of the design, at which point we will be able to provide Roger with a full information pack to allow completion of the drawings.

    Rob Morland has modified the Stones cast bronze marker lamps to incorporate red and white LEDs. However, the Trust needs two more (of eight in total) for Tornado. In addition to the A1s, they were fitted to some early diesel shunter classes including 03 and 04 plus various 0-4-0 designs by North British, Hunslet and Barclay. Please contact the Trust below if you can help.

    TENDER (SPONSORED BY WILLIAM COOK CAST PRODUCTS LTD)
    The tender wheelsets have been subject to ultrasonic and magnetic particle NDT to comply with the group standard requirements and Timken has pressed on the bearings.

    On the 6th of December the tender frame was delivered to DLW and united with the wheelsets. The air receivers have been re-fitted and Tom Snowball and Paul Depledge have completed the bulk of the plumbing and electrical conduit respectively

    The tender springs were delivered on Tuesday 15th January. Most of the spring gear details are now at DLW. Ian Howitt is expected to deliver the spring hooks in mid February.

    Ian Howitt has made further progress with the brake gear, the bulk of it is now at DLW; he is currently working on the remaining items – mainly the cross stay which is currently in manufacture, some pins and various details of the hand brake mechanism.

    North View Engineering carried out a hydraulic test of the tank on 1st December which showed a number of small leaks. These have been ground out and re-welded and it was re-tested on 9th January. As soon as the roadway outside the works has been made sound for large road vehicles, the frames and tank will be united.

    Ian Howitt is also working on the loco/tender draw bar and safety links plus all four buffers.

    Ian Matthews has continued to paint components and the frames. The axlebox covers were fitted prior to the locomotive steam test as the tender frame had to be run outside to allow the loco out. The tender alternator has been fitted and the belt tensioning apparatus is in course of fitting.

    Overall the tender is progressing in parallel with the rest of the locomotive.


    The A1 Trust is building Peppercorn class A1 Pacific No. 60163 Tornado at its Darlington Locomotive Works and when complete and certified for main line use in summer 2008 it will be used on special excursion trains operating on Network Rail. Tornado is now nearing completion having successfully completed her steam test and well over £2m has raised to-date through deeds of covenant, commercial sponsorship (principal sponsor William Cook Cast Products Limited) and through a bond issue. Although the funding gap to complete Tornado to the project plan now stands at only £27,009, once this gap has been bridged the Trust will need to raise approximately £800,000 to service the loans taken out and bond issue taken up to ensure the locomotive’s long term operations.

    – ENDS –

    The A1 Class of Pacific locomotives was designed by Arthur H Peppercorn for the London and North Eastern Railway and built in 1948/49. They were the last of the East Coast Main Line's series of thoroughbred express passenger steam locomotives. Examples of many other Darlington and Doncaster built locomotives have been saved for preservation, but not the Peppercorn A1s which were scrapped, following dieselisation of the railways, with the last going in 1966. The A1 Steam Locomotive Trust is building a new locomotive, 60163 Tornado, at the new Darlington Locomotive Works (DLW) with the money being raised by public subscription through Deeds of Covenant, at a cost of only the price of a pint of beer per week, a £500,000, 4% unsecured bearer bonds issue and sponsorship agreements. The total cost of the locomotive will be almost £3 million, of which well over £2m has already been raised or pledged. Our principle sponsor is William Cook Cast Products Limited and other great British organisations that have supported the project include GNER, Corus, I.D. Howitt, Total, M. H. Spencer Limited and Darlington Borough Council. DLW is open to the general public from 11am to 4pm on the 2nd Saturday of every month.

    For details of how to help telephone 01325 4 60163, visit http://www.a1steam.com or email enquiries@a1steam.com
     
  14. dace83

    dace83 Well-Known Member

    Joined:
    May 7, 2007
    Messages:
    2,095
    Likes Received:
    4
    would be nice it tornado could visit doncaster works before it goes under housing
     
  15. stepney60

    stepney60 Nat Pres stalwart

    Joined:
    Dec 3, 2005
    Messages:
    14,400
    Likes Received:
    0
    But Tornado doesn't have any connections with Doncaster works, does it?
     
  16. Sir Nigel Gresley

    Sir Nigel Gresley Member

    Joined:
    Nov 24, 2006
    Messages:
    880
    Likes Received:
    148
    Occupation:
    Retired Soldier of Fortune
    Location:
    Dorset
    I have probably overlooked the answer to this, but will the tender and cabside rivets be countersunk, as it is a Darlington loco, or snap-head, as produced by Doncaster?
     
  17. Tracklayer

    Tracklayer Resident of Nat Pres

    Joined:
    Sep 27, 2006
    Messages:
    7,484
    Likes Received:
    2
    Occupation:
    Employed
  18. twr12

    twr12 Well-Known Member

    Joined:
    Sep 2, 2007
    Messages:
    1,559
    Likes Received:
    731
    Cor! A question about rivets!
    I wonder how many rivets there are?
     
  19. James

    James Part of the furniture

    Joined:
    Sep 6, 2005
    Messages:
    4,178
    Likes Received:
    0
    Location:
    7036
    It's gone way beyond how many there are...now they want to know what type? #-o
     
  20. Tracklayer

    Tracklayer Resident of Nat Pres

    Joined:
    Sep 27, 2006
    Messages:
    7,484
    Likes Received:
    2
    Occupation:
    Employed
    I was only pullin ya regulator...

    Though i woulda thaught the A1 is mostly welded construction...
     

Share This Page