70013

الموضوع في 'Steam Traction' بواسطة BillyReopening, بتاريخ ‏30 ديسمبر 2018.

  1. martin1656

    martin1656 Guest

    Santa could at least have left you some coal,:D Sounds like it will be ready, when its ready, at least it's not been promised on several Railtours, whilst still in bits
     
  2. Ian Milne

    Ian Milne New Member

    إنضم إلينا في:
    ‏5 جوان 2011
    المشاركات:
    161
    عدد المعجبين:
    93
    Now three years on from when it was first estimated to be operational. Any update ? No mention of 70013 at all in the most recent edition of Main Line.
     
  3. LMarsh1987

    LMarsh1987 Part of the furniture Friend

    إنضم إلينا في:
    ‏19 جوان 2013
    المشاركات:
    3,123
    عدد المعجبين:
    4,339
    الجنس:
    ذكر
    الوظيفة:
    TBC
    مكان الإقامة:
    Birmingham & Arley
    Heritage Railway Volunteer:
    No I do not currently volunteer
    I'm led to believe it's currently being worked on in Tyseley.
     
  4. Kylchap

    Kylchap Member

    إنضم إلينا في:
    ‏15 ديسمبر 2015
    المشاركات:
    520
    عدد المعجبين:
    1,002
    الجنس:
    ذكر
    مكان الإقامة:
    East Anglia
    Heritage Railway Volunteer:
    No I do not currently volunteer
    The frame was still at Loughborough a couple of months ago when I visited, boiler at Tyseley as mentioned above.
     
  5. Belgarath001

    Belgarath001 New Member

    إنضم إلينا في:
    ‏2 إبريل 2012
    المشاركات:
    164
    عدد المعجبين:
    422
    Heritage Railway Volunteer:
    Yes I am an active volunteer
    The boiler cladding has been shot blasted and primered in the last week or so, believe Tyseley have just put all of the small tubes into the boiler within the last fortnight and the shed fitters have been doing some work pre-Autumn steam gala on the cylinder chest non-return valves, cylinder main steam pipe studs and a few other smaller items.

    Information from the GCR Shed Facebook page who also said back in September that they hope to have the boiler back this year, fit a new ashpan and then drop into the frames.
     
    sunstream, Ian Milne, Bluenosejohn و 5 آخرون معجبون بهذا.
  6. Flying Phil

    Flying Phil Part of the furniture

    إنضم إلينا في:
    ‏10 ديسمبر 2018
    المشاركات:
    3,148
    عدد المعجبين:
    6,861
    الجنس:
    ذكر
    مكان الإقامة:
    Leicestershire
    Heritage Railway Volunteer:
    Yes I am an active volunteer
    Here is the boiler cladding being worked on in the shed.
    DSC04765.JPG
     

    الملفات المرفقة:

    • DSC04766.JPG
      DSC04766.JPG
      حجم الملف:
      1.9 ميغا
      المشاهدات:
      48
    Bluenosejohn, silversteellady, Johnme101 و 3 آخرون معجبون بهذا.
  7. class8mikado

    class8mikado Part of the furniture

    إنضم إلينا في:
    ‏1 جوان 2009
    المشاركات:
    3,977
    عدد المعجبين:
    1,739
    الوظيفة:
    Print Estimator/ Repository of Useless Informatio.
    مكان الإقامة:
    Bingley W.Yorks.
    Heritage Railway Volunteer:
    No I do not currently volunteer
    Know that the NRM arent keen on modifications, but Im sure the Clan chaps would be happy to offer the modified rear cylinder cover/slidebar support pattern if they fancy giving that a go.
    Similarly the Lempor drawings...;)
     
    northernsteam و barnsley2857 معجبون بهذا.
  8. Flying Phil

    Flying Phil Part of the furniture

    إنضم إلينا في:
    ‏10 ديسمبر 2018
    المشاركات:
    3,148
    عدد المعجبين:
    6,861
    الجنس:
    ذكر
    مكان الإقامة:
    Leicestershire
    Heritage Railway Volunteer:
    Yes I am an active volunteer
  9. class8mikado

    class8mikado Part of the furniture

    إنضم إلينا في:
    ‏1 جوان 2009
    المشاركات:
    3,977
    عدد المعجبين:
    1,739
    الوظيفة:
    Print Estimator/ Repository of Useless Informatio.
    مكان الإقامة:
    Bingley W.Yorks.
    Heritage Railway Volunteer:
    No I do not currently volunteer
    What s used for boiler Lagging these days ? and is there anything to be gained from increasing the thickness of that ?
     
  10. Flying Phil

    Flying Phil Part of the furniture

    إنضم إلينا في:
    ‏10 ديسمبر 2018
    المشاركات:
    3,148
    عدد المعجبين:
    6,861
    الجنس:
    ذكر
    مكان الإقامة:
    Leicestershire
    Heritage Railway Volunteer:
    Yes I am an active volunteer
    I believe the boiler lagging is fibreglass these days. I suspect there is so much heat lost up the chimney, any extra fibreglass thickness is just extra cost for minimal gain.....plus the appearance would be altered....and eyebrows raised!
     
  11. Chuffington

    Chuffington New Member

    إنضم إلينا في:
    ‏25 إبريل 2018
    المشاركات:
    105
    عدد المعجبين:
    65
    الجنس:
    ذكر
    مكان الإقامة:
    Cheltenham
    Heritage Railway Volunteer:
    Yes I am an active volunteer
    I think it is mainly trying to keep the boiler temp stable ie when not in steam cooling slowly, there was a time some owners insisted on a chimney cap, and not cleaning the grate and ash pan, not seen it for a while as it can cause other problems.
     
  12. RalphW

    RalphW Nat Pres stalwart Staff Member Administrator Friend

    إنضم إلينا في:
    ‏11 سبتمبر 2005
    المشاركات:
    37,359
    عدد المعجبين:
    10,562
    الجنس:
    ذكر
    الوظيفة:
    Retired-ish, Part time rail tour steward.
    مكان الإقامة:
    Northwich
    Heritage Railway Volunteer:
    No I do not currently volunteer
    Also topping up the boiler gradually.
     
  13. Flying Phil

    Flying Phil Part of the furniture

    إنضم إلينا في:
    ‏10 ديسمبر 2018
    المشاركات:
    3,148
    عدد المعجبين:
    6,861
    الجنس:
    ذكر
    مكان الإقامة:
    Leicestershire
    Heritage Railway Volunteer:
    Yes I am an active volunteer
    There has been more work done on the various cladding parts and fixing bands, but still no word on the boilers return, other than "soon"...so when it arrives we will know.
     
    أعجب بهذه المشاركة silversteellady
  14. Raimondo

    Raimondo New Member

    إنضم إلينا في:
    ‏24 اكتوبر 2005
    المشاركات:
    141
    عدد المعجبين:
    137
    The boiler's been due back 'soon' or 'any day now' or 'imminently' for about two years now. Hopefully it will indeed be back, errm, 'soon' :)
     
    green five و silversteellady معجبون بهذا.
  15. polmadie

    polmadie Well-Known Member

    إنضم إلينا في:
    ‏27 سبتمبر 2007
    المشاركات:
    1,274
    عدد المعجبين:
    552
  16. Raimondo

    Raimondo New Member

    إنضم إلينا في:
    ‏24 اكتوبر 2005
    المشاركات:
    141
    عدد المعجبين:
    137
    Just following up on this, and the shed team at Loughborough provide excellent weekly updates on all the work going on via their Facebook page 'GCR Shed Works' - def worth a follow for those on FB. The updates are really interesting - and appreciated.

    Re 70013, Friday's update says: "Now the running boards are done the list of stuff to paint ready is much smaller, so the final bits are being done as well as a start on the cylinders and reminding running boards that are attached to the loco being the front end of the loco. The boiler is due back some time in March".

    So if the boiler's back in March then I assume they will be cracking on with the final assembly. The only thing is, they didn't specify which year was 'sometime in March' :)
     
    Last edited: ‏16 فبراير 2026
    Swan Age, green five, Haighie و 2 آخرون معجبون بهذا.
  17. Rander

    Rander Member

    إنضم إلينا في:
    ‏24 فبراير 2007
    المشاركات:
    372
    عدد المعجبين:
    141
    It's now April and I believe the boiler is still at Tyseley.
     
    أعجب بهذه المشاركة silversteellady
  18. 26D_M

    26D_M Part of the furniture

    إنضم إلينا في:
    ‏22 اكتوبر 2009
    المشاركات:
    4,747
    عدد المعجبين:
    2,091
    Hopefully it will be ready by August 2028 to take its place with 45110 and 44871 marking 60 years since 1T57.
     
    3ABescot, Mick45305, silversteellady و 1 شخص آخر معجبون بهذا.
  19. MikeParkin65

    MikeParkin65 Member Friend

    إنضم إلينا في:
    ‏1 جويلية 2007
    المشاركات:
    655
    عدد المعجبين:
    755
    الجنس:
    ذكر
    Heritage Railway Volunteer:
    No I do not currently volunteer
    Unless something changes regarding airbraking and/or WCRC MK1's before 2028 any such celebration is going to have to be heritage line only.
     
  20. 26D_M

    26D_M Part of the furniture

    إنضم إلينا في:
    ‏22 اكتوبر 2009
    المشاركات:
    4,747
    عدد المعجبين:
    2,091
    Is the GCR likely to be reconnected to the network by August 2028?
     