If you register, you can do a lot more. And become an active part of our growing community. You'll have access to hidden forums, and enjoy the ability of replying and starting conversations.

1466

Discussion in 'Steam Traction' started by arthur maunsell, Feb 11, 2019.

  1. arthur maunsell

    arthur maunsell Active Member

    Joined:
    Sep 6, 2008
    Messages:
    1,006
    Likes Received:
    103
    Location:
    by the fire
    Heritage Railway Volunteer:
    No I do not currently volunteer
  2. Matt37401

    Matt37401 Resident of Nat Pres

    Joined:
    Jun 8, 2014
    Messages:
    7,322
    Likes Received:
    3,171
    Gender:
    Male
    Location:
    31A
    Heritage Railway Volunteer:
    No I do not currently volunteer
    Looks like a closed page.
     
  3. The Saggin' Dragon

    The Saggin' Dragon Nat Pres stalwart Staff Member Moderator

    Joined:
    Apr 15, 2006
    Messages:
    14,562
    Likes Received:
    4,799
    Location:
    1012 / 60158
    Heritage Railway Volunteer:
    No I do not currently volunteer
    Works OK for me.
     
  4. 45076

    45076 Member

    Joined:
    Sep 15, 2011
    Messages:
    415
    Likes Received:
    231
    Gender:
    Male
    Occupation:
    Retired
    Location:
    34004
    Heritage Railway Volunteer:
    No I do not currently volunteer
    [​IMG]


    Great Western Society's 1466 Restoration
    16 hrs ·
    The 14's boiler has been removed, work can now start on with removing the tubes and prepping it for a NDT, this is where known suspect areas of the steel outer plate work is cleaned with a grinder so that the NDT engineer can use an ultrasonic probe to determine the thickness or detect fracturing on the waterside.
    For example, just above the foundation ring, to check for grooving and around plug holes in high stress areas, to check for any fractures. Also, a dye penetrant inspection will be carried out on the copper firebox tubeplate ligaments, to check for any fractures. Work can start on removing the concrete that is applied to the top of the cylinder block, to assess the condition and extent of corrosion. After the NDT has been carried out an overhaul plan will be prepared and then agreed with the boiler inspector and insurance company.

    Thanks to all those involved with the boiler removal.
     
  5. Robin

    Robin Member

    Joined:
    May 7, 2012
    Messages:
    550
    Likes Received:
    418
    Location:
    Stourbridge
  6. flying scotsman123

    flying scotsman123 Part of the furniture

    Joined:
    Sep 9, 2013
    Messages:
    5,910
    Likes Received:
    5,998
    Gender:
    Male
    Location:
    Cheltenham, or Sheffield
    Heritage Railway Volunteer:
    Yes I am an active volunteer
    Jamessquared likes this.
  7. paullad1984

    paullad1984 Active Member

    Joined:
    Oct 16, 2007
    Messages:
    739
    Likes Received:
    270
    But those of us who know the difference will spot the difference. Top feed etc
     

Share This Page