Political answers.
What would be the benefit if this country, on its own, was net zero?
but you'll still have five coal fired locos, so you are no better off are you?
The first thing that the SVR did was to reduce the wage bill.
Yet, to get paid staff that are capable of doing the job is getting harder and harder, especially in engineering disciplines.
It was very much true. I remember the Carnforth colour show in 1968. Also, the KWVR and 5596 Bahamas being painted in LMS red after overhaul at...
That is the old address. The new premises are somewhere in Bury.
Blaming cows for global warming sums it up!
In 1958 Doncaster Works drawings office produced a set of drawings for a double chimney Standard 5. Unfortunately, nothing came of it.
Where is elsewhere?
Safely remove the ballast, as well.
Just checked my old Shed Directory. The shed title is Aberdeen (Ferryhill). So Aberdeen is correct.
Time between Heavy General overhauls varied between types of locos and, indeed, the Region they worked on.
82045's reverser is a totally different design, but you are correct.
47XX No 7 boiler 5'-6" min diameter, 6'-0" max diameter. Castle No 8 boiler 5'-2" min diameter, 5'-9" max diameter. There is quite a difference.
Separate names with a comma.