Harold. Yes. Mike
Network Rail's work to stabilise their mainline railway embankment at Robertsbridge are nearing completion. One of a whole series of embankment...
Spot on right! Mike
Thanks Paul The BR drawings show just over 1/2 mile of the pressed steel 95lb BH sleeper were installed from east of Salehurst Halt as far as...
This bridge was built in 1941 by Italian prisoners of war, part of those captured in large number by the British during the WW11 Western Desert...
Network Rail are undertaking repairs to their embankment alongside, and north of, our RVR loco shed site. This is one of the remaining jobs...
I'm afraid its all much more boringly simpler than that. There never was, nor is there planned to be, a bridge between those numbered 15 & 17...
60ft panels. Mike
You asks about the various rails we will use, and have in stock, for the 3.4km long ‘missing link’ at RVR - all of which will be 113lb flat bottom...
Thanks Mike Hart
Paul. The 3.1/2 miles Robertsbridge to Bodiam station I quoted was simply the old general mileage description used by BR. The actual distance...
3.1/2 mile
The architectural style of the new station building at Robertsbridge is designed to follow the same style as the Colonel's station building at...
The passing loop has been planned to be immediately west of Junction Road. Timetable planning has a preference for that to be nearer...
Mark. There are no plans to build a halt platform at Salehurst. Not least as under current regulations would require that to be built one...