RSH “Moorbarrow” will also be available so the event will have up to 4 engines depending on the completion of “Haulwen’s” overhaul. the event...
6430 is due to bow out in May for the 10 yearly, Austerity “Haulwen” will be back in service.
Abergwili Junction has been shortlisted for the Infrastructure prize in the HRA awards....
extending the Gwili to Conwil would only add another 3/4 mile so keeps the operation pretty much “as is”, with similar motive power and stock. The...
A milestone as Haulwen’s boiler and cab are returned to the frames.
I’ve attached a picture of the site. The pedestrian access is on the left hand site of the photo at the south end of platform 2 (just above the...
Taff Vale 220 coming on with the guards van being painted and the body sides being sanded for painting. Meanwhile the chassis of Haulwen is now at...
there is now footpath access to the Abergwili site which can be accessed via a walk along the footpath at the south end of Glangwili Hospital (one...
1369 has been announced.
Templates on one side finished…production next
We managed to get the lights on platform one positioned and connected just in time for Halloween. Haulwen continues to progress towards...
Haulwen’s boiler being lagged and clasded.
carriages which are “serviceable” can easily have tens of thousands of pounds spent on them in repair work. Usual issues of doors, door pillars...
I think you have to account for the time delay. We are well into 2024 and most railways are only just publishing 2023 figures.
really depends on the numbers behind the loss. A HR might have engaged in a repairs and renewals programme which would benefit long term but...