Why would JB fund their overhauls? They are under contract to the SR, therefore any overhauls are the responsibility of, and would be paid for by...
Isn’t this how it has always been intended to be built? Hence the ‘factory flyover’ appeal.
When did he make a previous attempt? I would be very surprised if Bill had anything to do with copilot, since he resigned as MS chairman in 2014...
The drag box is being machined at workshop X - I think there’s still quite a bit of work to be done on it.
How would they do that? They signed a 25 year contract in 2014 -...
Was it someone who asked when it would be ready? Or commented that the livery was the wrong shade? :)
Some new exhibits: https://www.rheidolrailway.co.uk/2024/04/18/new-exhibits-in-the-museum/
Could also be to allow a bit of leeway in case 541’s overhaul takes longer than expected
That may be true, but it doesn't get away from the fact that there is a trustee on the board with specific responsibility for heritage matters....
Hmmm......
This is what I was trying to get across earlier - thanks Tom!
If you're the only group out of hundreds doing something in a particular way, then maybe you're doing it wrong! I would argue that a loco or...
If that is the case, then why is there not a trustee for locos (maybe even two - one steam and one IC), another for buildings, another for PW etc...
The H&W blocks were approx 3" in depth
They used these type of blocks in the Harland & Wolff shipyard, specifically in the engine workshops and test area. They were very good at...
Separate names with a comma.