A big Thank You to all who have posted pictures on here of SB2...and to the Swanage Railway and SLL for putting on such a fantastic event.
Thanks for the update Big Stu.
Thanks DavidW. I was not able to get to the GCR this week but I believe some more work has been done on #711 and on the dismantling of the...
Wasn't this posted on July 6th Nick?
Thanks for that picture Hermod, it does seem to show that the three "throws" of the crank are not quite straight forward, as the two outer crank...
It is such a shame that you have had to totally strip the locomotive right back to the bare frames, but lessons have been learn't (the hard way!)...
More progress on #711. Floor sheets nearly finished and most small patches done. We even now have white stripes and big black boxes. [ATTACH]
Good to see the progress on 1014.
Interesting point Hermod, but possibly due to the difference in the fact that the B17 is a forging and not a built up crank? I'm sure a...
With the wooden pattern completed quotes are being sought for the actual castings....further progress!
Glad that you liked our line Ian and your detailed summary is appreciated. When you return, hopefully, it will coincide with our Boscastle Shed...
Thanks Ashley, Blue Peter is looking, and sounding, really good.
However, as Jonnie has said the biggest problem is not the in ticket locomotives, but the transport of them when the haulier has problems.
I hope the meetings go well and that the tone is positive.
More progress on #711 (560) as the two North end floor sheets have been seam welded and the two South end floor sheets part seam welded, with the...