Yes, the smart turnout and the absence of hi-vis, except when absolutely necessary, was very noticeable .
Thank goodness!
It is scheduled to be officially launched into traffic at 12.30pm on Wednesday, 18 Dec, the 119th anniversary of the opening of the railway.
A Special Train Notice has been issued for the mainline testing of 3801, in the early hours of Tuesday, 9 December (Oz time), between East Hills...
But what would be the pattern when Leekbrook - Stoke opens?
Thanks Dom, for clarifying this. As Steve has pointed out, propelling was done at Whitby before the track layout alterations, so obviously the...
Sorry Dominic, but is there any technical reason why the train set could not be propelled back to Riverside, run round and propelled back to...
It has always bemused me that Peak Rail adopted the top and tail method when they extended into Matlock. Usually it is with a diesel at one end...
The solution would to be to arrange running rights over the existing Network Rail track to Blackwell Mill and then to reinstall the track to...
Quite possible, allowing for rounding. e.g. 39.6%%, 42.7%, 17.7%
I had forgotten about the issue of the "missing link" in the Monsal Trail between Buxton Junction on Buxton and, as I understand it, Network...
Another possibility would be to re-establish a base at Buxton and start working towards Matlock from there, as originally was the case. A bridge...
People still need to get to and from London at the beginning and end of the tour, just like any other tour. Hence the need to get cheaper APEX...
Yes, a few fools like myself did. Talk about twice bitten! And still they hold thousands of pounds of our money and string people on, just like...
Hi Dan, This was the sort of thing we were told last year and it ended in disaster. GB9 is such a complex operation that there is no way...
Separate names with a comma.