P2 Locomotive Company and related matters

الموضوع في 'Steam Traction' بواسطة class8mikado, بتاريخ ‏13 سبتمبر 2013.

  1. jnc

    jnc Well-Known Member

    إنضم إلينا في:
    ‏3 إبريل 2012
    المشاركات:
    1,595
    عدد المعجبين:
    2,779
    الجنس:
    ذكر
    مكان الإقامة:
    Western Atlantic
    Heritage Railway Volunteer:
    No I do not currently volunteer
    Any chance you can put the slides/whatever up online for those who can't attend? [The online version can contain material you couldn't fit in the live presentation, hint, hint :-].

    Noel
     
  2. class8mikado

    class8mikado Part of the furniture

    إنضم إلينا في:
    ‏1 جوان 2009
    المشاركات:
    3,934
    عدد المعجبين:
    1,700
    الوظيفة:
    Print Estimator/ Repository of Useless Informatio.
    مكان الإقامة:
    Bingley W.Yorks.
    Heritage Railway Volunteer:
    No I do not currently volunteer
    Yes that would be very nice...
     
  3. Foxhunter

    Foxhunter Member

    إنضم إلينا في:
    ‏9 جوان 2011
    المشاركات:
    590
    عدد المعجبين:
    709
    Heritage Railway Volunteer:
    Yes I am an active volunteer
    In addition to the archive footage shown at the convention, Andy has also been busy finding other movie footage.

    Foxy
     
  4. Foxhunter

    Foxhunter Member

    إنضم إلينا في:
    ‏9 جوان 2011
    المشاركات:
    590
    عدد المعجبين:
    709
    Heritage Railway Volunteer:
    Yes I am an active volunteer
  5. class8mikado

    class8mikado Part of the furniture

    إنضم إلينا في:
    ‏1 جوان 2009
    المشاركات:
    3,934
    عدد المعجبين:
    1,700
    الوظيفة:
    Print Estimator/ Repository of Useless Informatio.
    مكان الإقامة:
    Bingley W.Yorks.
    Heritage Railway Volunteer:
    No I do not currently volunteer
    Any chance you can tell them its a 4-8-4 you;re building and send the spares onto the Clan project please...
     
  6. MellishR

    MellishR Resident of Nat Pres Friend

    إنضم إلينا في:
    ‏16 إبريل 2009
    المشاركات:
    9,246
    عدد المعجبين:
    6,098
    A new mailshot just received, appealing for funding for the boiler, says "The boiler is the beating heart of a steam locomotive …". I can just about accept likening it to a heart, but I'm very dubious about "beating". If any part of a locomotive can be said to beat like a heart, surely it's the "engine", which even includes valves like a heart. Or perhaps the air pump(s)?
     
  7. Reading General

    Reading General Part of the furniture

    إنضم إلينا في:
    ‏18 ماي 2011
    المشاركات:
    6,081
    عدد المعجبين:
    2,217
    i'd be very wary of a beating boiler I must admit
     
  8. 242A1

    242A1 Well-Known Member

    إنضم إلينا في:
    ‏3 ديسمبر 2006
    المشاركات:
    1,563
    عدد المعجبين:
    1,312
    Well it is big and expensive. But it sure is not the heart of a locomotive.

    I wonder which road the Trust is going to take on this boiler? What is essentially a copy of that fitted to Tornado or something more modern?
     
  9. class8mikado

    class8mikado Part of the furniture

    إنضم إلينا في:
    ‏1 جوان 2009
    المشاركات:
    3,934
    عدد المعجبين:
    1,700
    الوظيفة:
    Print Estimator/ Repository of Useless Informatio.
    مكان الإقامة:
    Bingley W.Yorks.
    Heritage Railway Volunteer:
    No I do not currently volunteer
    Strongly suspect the Latter, perhaps you could write to them pointing out the potential for improvement ? .... (... hello!)
     
  10. Jamessquared

    Jamessquared Nat Pres stalwart

    إنضم إلينا في:
    ‏8 مارس 2008
    المشاركات:
    28,561
    عدد المعجبين:
    67,965
    مكان الإقامة:
    LBSC 215
    Heritage Railway Volunteer:
    Yes I am an active volunteer
    Methinks someone is confusing anatomy, engineering and marketing! They're not the same thing, you know ;)

    Tom
     
  11. Lplus

    Lplus Well-Known Member

    إنضم إلينا في:
    ‏24 نوفمبر 2011
    المشاركات:
    1,919
    عدد المعجبين:
    991
    مكان الإقامة:
    Waiting it out.
    Heritage Railway Volunteer:
    Yes I am an active volunteer
    Will the design and certification for Tornado's boiler be applicable to the P2 if they use the same boiler design? if so there is a saving to be made by using the same type. Not sure how much money and time would be saved though.
     
  12. class8mikado

    class8mikado Part of the furniture

    إنضم إلينا في:
    ‏1 جوان 2009
    المشاركات:
    3,934
    عدد المعجبين:
    1,700
    الوظيفة:
    Print Estimator/ Repository of Useless Informatio.
    مكان الإقامة:
    Bingley W.Yorks.
    Heritage Railway Volunteer:
    No I do not currently volunteer
    One would expect so, and i think a few lessons learnt on the staying may be put into practice on boiler no 2. If Blue Peters boiler is considered uneconomical / too lengthy a job to repair perhaps it might be worth asking Meiningen for a Bogoff !"
     
    Lplus و ragl معجبون بهذا.
  13. 5944

    5944 Resident of Nat Pres

    إنضم إلينا في:
    ‏14 يناير 2006
    المشاركات:
    9,568
    عدد المعجبين:
    10,804
    الجنس:
    ذكر
    الوظيفة:
    Train Maintainer for GTR at Hornsey
    مكان الإقامة:
    Letchworth
    Heritage Railway Volunteer:
    No I do not currently volunteer
    Is that why it's going back to Meiningen again? ;)
     
  14. 2392

    2392 Well-Known Member

    إنضم إلينا في:
    ‏7 جوان 2010
    المشاركات:
    1,902
    عدد المعجبين:
    1,148
    الجنس:
    ذكر
    مكان الإقامة:
    Felling on Tyne
    Heritage Railway Volunteer:
    Yes I am an active volunteer
    I think/believe, the idea is for the makers want to have a look at how the boiler has faired after a number of years in service.
     
  15. Hurricane

    Hurricane Member

    إنضم إلينا في:
    ‏1 نوفمبر 2013
    المشاركات:
    823
    عدد المعجبين:
    307
    الجنس:
    ذكر
    مكان الإقامة:
    71A
    Heritage Railway Volunteer:
    Yes I am an active volunteer
    Hmmm - im sure a more likely story is that if Meiningen undertake the overhaul works on the boiler then there cannot be an us and them debate if something fails or went wrong.

    Tbh with a boiler only 5 years old Meiningen have a massive responsibility for some of the issues that have been occurring on the boiler and I believe must be picking up the tab for some of the remedial works.
     
    أعجب بهذه المشاركة joe_issitt
  16. NeilL

    NeilL Well-Known Member

    إنضم إلينا في:
    ‏30 مارس 2012
    المشاركات:
    2,087
    عدد المعجبين:
    1,561
    الوظيفة:
    Retired & OAPWay & tree feller
    مكان الإقامة:
    Staffordshire
    Heritage Railway Volunteer:
    Yes I am an active volunteer
    The P2 leaflet says
    • Interchangeable with Tornado boiler
    • Tornado boiler is 17in shorter than P2 boiler - No 2007's smokebox will be extended within the cladding
    • 250psi of No 60163's boiler will be retained to improve economy and increase maximum power
     
  17. Sheff

    Sheff Resident of Nat Pres

    إنضم إلينا في:
    ‏21 إبريل 2006
    المشاركات:
    8,300
    عدد المعجبين:
    3,458
    الجنس:
    ذكر
    الوظيفة:
    Retired Engineer & Heritage Volunteer
    مكان الإقامة:
    N Warks
    Heritage Railway Volunteer:
    Yes I am an active volunteer
    What you believe, and what the actuality is, are not necessarily the same thing.
     
  18. 242A1

    242A1 Well-Known Member

    إنضم إلينا في:
    ‏3 ديسمبر 2006
    المشاركات:
    1,563
    عدد المعجبين:
    1,312
    Bearing in mind the amount of trouble with the boiler for 3801 a check to see that the boiler supplied to the A1 Trust is performing well would be encouraging.

    I do not believe that the new boiler will be of modern specification but it will be welded version of the traditional type still using flanged plates, or rather constructed to look as though they were flanged.

    If they did want a traditional construction the boiler provided for 4472 is close to being a new build and shows that it can be done. At a price.
     
  19. 242A1

    242A1 Well-Known Member

    إنضم إلينا في:
    ‏3 ديسمبر 2006
    المشاركات:
    1,563
    عدد المعجبين:
    1,312
    But they are using smaller bore cylinders so with driving wheel diameter and piston stroke being fixed as on the original the only way to maintain the T.E. figure was to increase the boiler pressure. As to power output, well, the cylinder and valve design is not settled yet and T.E. is no real guide to what might be achieved in terms of ihp.
     
  20. Foxhunter

    Foxhunter Member

    إنضم إلينا في:
    ‏9 جوان 2011
    المشاركات:
    590
    عدد المعجبين:
    709
    Heritage Railway Volunteer:
    Yes I am an active volunteer
    All the facts are on the P2 website. "Although the original class had 220lb/sq in boilers the overall size is identical to the diagram 118A 250lb/sq in boiler fitted to No. 60163, thus giving the option to inter-change this component at overhauls. Although the internal design is slightly different to No. 2001's boiler, the precedent was set by No. 2006 Wolf of Badenoch which had a boiler with a firebox combustion chamber. The P2 varied in some regards to the A1 in the area of the ashpan and grate, but these would for servicing advantages and manufacturing simplicity follow those on the A1."

    "During a recent visit to Meiningen in connection with the intermediate overhaul of Tornado's boiler, further work was done to examine improvements and minor modifications which will be applied to the boiler for Prince of Wales. More detailed 3D design work has been done on the smokebox to modify it to suit the shorter Tornado boiler. The original Gresley class P2 locomotives were fitted with Robinson type superheaters where the elements are fitted to the header using a special tube expander through cover plates on the front of the header. The elements are difficult to change individually. The post war locomotives were fitted the Melesco type superheater header where the elements are clamped onto the header using tee bolts and clamp bars which eliminates the access covers on the header. The Melesco design is also superior in that the wet (inlet) and dry (outlet) manifolds are almost completely separate with air spaces between them. This reduces to the tendency of the heat in the outlet manifold conducting through to the inlet side. A 3D model has been drawn of the Melesco header fitted to Tornado to check that it will fit in the P2 smokebox - and it does! This is useful as we can use Tornado's pattern equipment although a small modification will be needed to provide for 2 anti-vacuum valves which are on the upper sides of the smokebox on Cock o' the North. The un-streamlined LNER Pacifics and Gresley V2 class have distinctive raised covers on the smokebox over the outer ends of the superheater header. Thanks to the egg shaped cross section of the smokebox and boiler cladding on the original P2s, there is no need for the raised covers."

    During No. 60163's boiler overhaul at Meiningen they will fit a larger pattern of flexible stays and make improvements to the corners of the foundation ring. In due course, any beneficial modifications will be applied to the boiler for No. 2007. The CAD on the P2 website shows the extended smokebox

    [​IMG]
    Foxy
     