If you register, you can do a lot more. And become an active part of our growing community. You'll have access to hidden forums, and enjoy the ability of replying and starting conversations.

Bridge that Gap: Great Central Railway News

Discussion in 'Heritage Railways & Centres in the UK' started by Gav106, May 8, 2010.

  1. brmp201

    brmp201 Member

    Joined:
    May 18, 2010
    Messages:
    681
    Likes Received:
    1,091
    Gender:
    Male
    Occupation:
    IT Director
    Location:
    Surrey, UK
    Heritage Railway Volunteer:
    No I do not currently volunteer
    Now on the GCR website - Tender time for the Factory Flyover! - Great Central Railway
     
    Bluenosejohn, Johnme101 and jnc like this.
  2. Flying Phil

    Flying Phil Part of the furniture

    Joined:
    Dec 10, 2018
    Messages:
    3,197
    Likes Received:
    7,143
    Gender:
    Male
    Location:
    Leicestershire
    Heritage Railway Volunteer:
    Yes I am an active volunteer
    The "Urban Viaduct" I think is effectively going to be three parts. From the two track canal bridge, there will be approx 60m of embankment then a small single track bridge next to the Combined Sewer Outflow to allow maintenance vehicle access. Then it is the single track precast sections of the Urban Viaduct (About 250m), steadily rising to meet the Railway Terrace crossing bridge. This bridge is the highest point to allow for the large tip lorries to get to the recycling centre.
    There is also a small section of North embankment to be rebuilt, to join the MML bridge to the existing embankment and Chord line track.
    The existing Engine Shed will need to be relocated as the twin tracks to the Canal Bridge are on the original track formation - which is roads 1 and 2 in the shed. That is still three to five years away though.
     
  3. brmp201

    brmp201 Member

    Joined:
    May 18, 2010
    Messages:
    681
    Likes Received:
    1,091
    Gender:
    Male
    Occupation:
    IT Director
    Location:
    Surrey, UK
    Heritage Railway Volunteer:
    No I do not currently volunteer
  4. Flying Phil

    Flying Phil Part of the furniture

    Joined:
    Dec 10, 2018
    Messages:
    3,197
    Likes Received:
    7,143
    Gender:
    Male
    Location:
    Leicestershire
    Heritage Railway Volunteer:
    Yes I am an active volunteer
    That is a good video update and the projected build time is better than I thought it would be....complete by Christmas next year!
     
  5. jnc

    jnc Well-Known Member

    Joined:
    Apr 3, 2012
    Messages:
    1,827
    Likes Received:
    3,168
    Gender:
    Male
    Location:
    Western Atlantic
    Heritage Railway Volunteer:
    No I do not currently volunteer
    For those of us who refuse to watch videos: What is it that will be complete by Christmas next? Just the car park viaduct and the bridge over the road (which is what they are currently accumulating money for), or something else as well?

    Noel
     
  6. Mark Thompson

    Mark Thompson Well-Known Member

    Joined:
    Sep 10, 2017
    Messages:
    1,899
    Likes Received:
    4,653
    Gender:
    Male
    Location:
    E sussex
    Heritage Railway Volunteer:
    No I do not currently volunteer
    Yes. Exactly that. The most difficult bit in terms of logistics. The "Urban Viaduct", which has no direct third party involvement, would be a separate and final phase.
     
    jnc likes this.
  7. Bikermike

    Bikermike Well-Known Member

    Joined:
    Mar 11, 2020
    Messages:
    2,274
    Likes Received:
    2,586
    Gender:
    Male
    Location:
    Thameslink territory
    Heritage Railway Volunteer:
    No I do not currently volunteer
    Yes, for those of us quietly browsing at work, a video is a complete pain...
     
    jnc likes this.
  8. ghost

    ghost Part of the furniture

    Joined:
    May 29, 2006
    Messages:
    4,531
    Likes Received:
    6,251
    Gender:
    Male
    Location:
    N.Ireland
    Heritage Railway Volunteer:
    Yes I am an active volunteer
    With the northern embankment slotted in at some point as well
     
    jnc likes this.
  9. Mark Thompson

    Mark Thompson Well-Known Member

    Joined:
    Sep 10, 2017
    Messages:
    1,899
    Likes Received:
    4,653
    Gender:
    Male
    Location:
    E sussex
    Heritage Railway Volunteer:
    No I do not currently volunteer
    At the same time, it seems.
     
  10. Davo

    Davo Well-Known Member

    Joined:
    Oct 12, 2018
    Messages:
    1,619
    Likes Received:
    763
    Gender:
    Male
    Location:
    W yorkshire 56f
    Heritage Railway Volunteer:
    No I do not currently volunteer
    Possibly funding noel for the eventual transfer rebuilding of the current G.C.R. Loughborough M.P.D. is this to be done though as the 7th step after the urban viaduct between railway terrace bridge and grand Union canal bridge is completed?
    Or the 6th step before the urban viaduct is constructed I always thought the down alignment past the Loughborough M.P.D. can be used is that still possible?
     
    Last edited: Sep 17, 2026 at 8:26 PM
  11. 73108

    73108 New Member

    Joined:
    Apr 2, 2025
    Messages:
    53
    Likes Received:
    148
    Gender:
    Male
    Location:
    A long, long, long way north
    Heritage Railway Volunteer:
    No I do not currently volunteer
    Is it so urgent to know what's happening now that you can't wait just a few hours? Trust me, you won't miss the reunited railway reopening ;)
     
    Spamcan81 and The Dainton Banker like this.
  12. Bikermike

    Bikermike Well-Known Member

    Joined:
    Mar 11, 2020
    Messages:
    2,274
    Likes Received:
    2,586
    Gender:
    Male
    Location:
    Thameslink territory
    Heritage Railway Volunteer:
    No I do not currently volunteer
    I don't read np as much out of work. If I'm with family, I'm not going to be watching a video which takes my focus away from them.
     
  13. jnc

    jnc Well-Known Member

    Joined:
    Apr 3, 2012
    Messages:
    1,827
    Likes Received:
    3,168
    Gender:
    Male
    Location:
    Western Atlantic
    Heritage Railway Volunteer:
    No I do not currently volunteer
    One can't speed-read a video; one has to sit there while it plods along. That's why I will almost never watch a video, but restrict myself to text.

    Noel
     
  14. Spamcan81

    Spamcan81 Nat Pres stalwart

    Joined:
    Aug 25, 2007
    Messages:
    36,975
    Likes Received:
    24,471
    Occupation:
    Training moles
    Location:
    The back of beyond
    Heritage Railway Volunteer:
    Yes I am an active volunteer
    It's lerss that eleven minutes long and very informative. Is your life so busy that you can't spare that short period of time to watch it?
     
    ghost likes this.
  15. 35B

    35B Nat Pres stalwart

    Joined:
    Jun 18, 2011
    Messages:
    33,019
    Likes Received:
    36,335
    Gender:
    Male
    Location:
    Grantham
    Heritage Railway Volunteer:
    No I do not currently volunteer
    We all have different means that we prefer to take on information - I'm in the camp that much prefers a simple headline, rather than having to be taken deeper to get anything.
     
  16. damianrhysmoore

    damianrhysmoore Part of the furniture

    Joined:
    May 31, 2008
    Messages:
    3,011
    Likes Received:
    3,891
    Occupation:
    Osteopath
    Location:
    London SW8
    Heritage Railway Volunteer:
    No I do not currently volunteer
    I largely agree re videos...Some of the interminatble how to videos that could be a one-liner....
    but it is an informative video without tons of padding
     
  17. jnc

    jnc Well-Known Member

    Joined:
    Apr 3, 2012
    Messages:
    1,827
    Likes Received:
    3,168
    Gender:
    Male
    Location:
    Western Atlantic
    Heritage Railway Volunteer:
    No I do not currently volunteer
    Yes.

    Noel
     
    Miff likes this.
  18. pmh_74

    pmh_74 Part of the furniture

    Joined:
    Jan 28, 2009
    Messages:
    2,665
    Likes Received:
    2,106
    The down alignment is road 1 of the present shed. There was a loop or siding alongside, however to go round the shed you'd have to slew a bit further still. If you think about what the shed would lose in that scenario (i.e. road access for volunteers, heavy machinery and coal deliveries, public access, the myriad of storage containers, etc.), it was always a non-starter. Well, assuming you want to do the job properly and not hobble the operation of the unified railway for the next 30+ years.

    Where the shed goes... I don't think anybody knows yet. Certainly, lots of ideas have been thrown around. Time will tell.
     
    jnc likes this.
  19. Roger_C

    Roger_C New Member

    Joined:
    Feb 5, 2007
    Messages:
    141
    Likes Received:
    198
    Quite often, especially when the video is leisurely, I set the playback speed to 1.7x.
     
  20. 5944

    5944 Resident of Nat Pres

    Joined:
    Jan 14, 2006
    Messages:
    10,365
    Likes Received:
    12,803
    Gender:
    Male
    Occupation:
    Train Maintainer for GTR at Hornsey
    Location:
    Letchworth
    Heritage Railway Volunteer:
    No I do not currently volunteer
    With YouTube you can often open up the transcript at the bottom and skim through that. Though it's done with voice recognition software and has a habit of getting words wrong and picking up every umm and err that gets muttered.
     

Share This Page