If you register, you can do a lot more. And become an active part of our growing community. You'll have access to hidden forums, and enjoy the ability of replying and starting conversations.

Bridge that Gap: Great Central Railway News

Discussion in 'Heritage Railways & Centres in the UK' started by Gav106, May 8, 2010.

  1. brmp201

    brmp201 Member

    Joined:
    May 18, 2010
    Messages:
    679
    Likes Received:
    1,077
    Gender:
    Male
    Occupation:
    IT Director
    Location:
    Surrey, UK
    Heritage Railway Volunteer:
    No I do not currently volunteer
    Now on the GCR website - Tender time for the Factory Flyover! - Great Central Railway
     
    Johnme101 and jnc like this.
  2. Flying Phil

    Flying Phil Part of the furniture

    Joined:
    Dec 10, 2018
    Messages:
    3,190
    Likes Received:
    7,098
    Gender:
    Male
    Location:
    Leicestershire
    Heritage Railway Volunteer:
    Yes I am an active volunteer
    The "Urban Viaduct" I think is effectively going to be three parts. From the two track canal bridge, there will be approx 60m of embankment then a small single track bridge next to the Combined Sewer Outflow to allow maintenance vehicle access. Then it is the single track precast sections of the Urban Viaduct (About 250m), steadily rising to meet the Railway Terrace crossing bridge. This bridge is the highest point to allow for the large tip lorries to get to the recycling centre.
    There is also a small section of North embankment to be rebuilt, to join the MML bridge to the existing embankment and Chord line track.
    The existing Engine Shed will need to be relocated as the twin tracks to the Canal Bridge are on the original track formation - which is roads 1 and 2 in the shed. That is still three to five years away though.
     
    J Rob't Harrison, Sheff and jnc like this.

Share This Page