If you register, you can do a lot more. And become an active part of our growing community. You'll have access to hidden forums, and enjoy the ability of replying and starting conversations.

V2 4771 Green Arrow to return?

الموضوع في 'Steam Traction' بواسطة Davo, بتاريخ ‏22 مارس 2019.

  1. guycarr360

    guycarr360 Part of the furniture

    إنضم إلينا في:
    ‏4 اكتوبر 2005
    المشاركات:
    5,295
    عدد المعجبين:
    3,533
    الجنس:
    ذكر
    مكان الإقامة:
    Chester le Street County Durham
    19 is under overhaul at Crewe ATM.
     
  2. 242A1

    242A1 Well-Known Member

    إنضم إلينا في:
    ‏3 ديسمبر 2006
    المشاركات:
    1,569
    عدد المعجبين:
    1,318
    The fact that the overhaul of Flying Scotsman had to be undertaken twice is no fault of the engine. The people that are and were involved is another matter.

    Sir Nigel Gresley underwent an overhaul from 2015 and returned in April 2022. This is understood to have cost £800,000 but this work did not cover the same ground as that covered with Flying Scotsman. The A4 also benefited from having its own team of active supporters. The NRM relied on and trusted in its own staff and paid staff have to be paid for. Scotsman's (double) overhaul took a decade, that on Gresley took more than six years and if we knew the hours of labour freely given to the A4 overhaul we could adjust the costs accordingly but it is perhaps better that we do not know. Those that are interested could make their own estimate those that are not are free to continue with their "money pit" mindset.

    When it comes to the V2 there are questions. In order for it to run on the mainline it not only needs overhaul. It does not enjoy a team of capable supporters and this drives the cost up. Once the overhaul work is done you also have to add in the electrical system. Is it worth taking the work so far? You could limit the engine to preserved line use but it is not a household name, unlike the two Pacifics, and recouping the overhaul and repair costs could be a daunting prospect. Any one in favour of taking on the financial burden?

    The outcome that some might like to see may well not be realistically possible.
     
    أعجب بهذه المشاركة MellishR
  3. 35B

    35B Nat Pres stalwart

    إنضم إلينا في:
    ‏18 جوان 2011
    المشاركات:
    32,303
    عدد المعجبين:
    35,008
    الجنس:
    ذكر
    مكان الإقامة:
    Grantham
    Heritage Railway Volunteer:
    No I do not currently volunteer
    All true, but points that beg further scrutiny. Two immediately come to mind.

    The first is that if NRM are concerned about the costs of doing the job themselves, some of that will be the result of what went wrong last time with Scotsman. Complicated projects are not easy to deliver, and report by Bob Meanley demonstrated how thin the skill base was.

    The second is that the lack of "a team of capable supporters" is, at least in part, the result of conscious decisions that NRM have taken to reduce the volunteer input into their operation - steam and diesel. Such capacity is difficult to build in the best of circumstances
     
    green five, Paul42 و Steve معجبون بهذا.
  4. Sheff

    Sheff Resident of Nat Pres

    إنضم إلينا في:
    ‏21 إبريل 2006
    المشاركات:
    8,570
    عدد المعجبين:
    3,934
    الجنس:
    ذكر
    الوظيفة:
    Retired Engineer & Heritage Volunteer
    مكان الإقامة:
    Leicestershire
    Heritage Railway Volunteer:
    No I do not currently volunteer
    Who was in charge at NRM during the FS overhaul?
    Is it likely the outcome would be any different for the V2, ie would the holders of the purse strings be at all inclined to take on the risk?
     
  5. std tank

    std tank Part of the furniture

    إنضم إلينا في:
    ‏20 سبتمبر 2005
    المشاركات:
    4,023
    عدد المعجبين:
    1,160
    الجنس:
    ذكر
    الوظيفة:
    Retired
    مكان الإقامة:
    Liverpool
    Heritage Railway Volunteer:
    Yes I am an active volunteer
    Everything would have to be done by contractors. The NRM no longer has a workshop.
     
    green five, Sheff و ghost معجبون بهذا.
  6. Steve

    Steve Nat Pres stalwart Friend

    إنضم إلينا في:
    ‏7 اكتوبر 2006
    المشاركات:
    13,488
    عدد المعجبين:
    13,868
    الوظيفة:
    Gentleman of leisure, nowadays
    مكان الإقامة:
    Near Leeds
    Heritage Railway Volunteer:
    Yes I am an active volunteer
    It would be interesting to see the income and expenditure cost of operating Scotsman. However, if the hire figures I’ve seen are correct then it should be cash positive at the end of its current ticket. Whether that money is put back into Scotsman or used to fund a different loco overhaul is debatable.
    On the assumption that it is a different loco then that is something that will tax the minds of the museum world. From a strictly engineering point, Mallard, the Duchess and Green Arrow are all possible. I believe that, when the Duchess was streamlined it was done so in a gauge friendly way but I’m happy to be told that’s wrong. A streamlined Duchess is getting beyond living memory and I do think it looks spectacular and would be a big draw, as would Mallard because it is as well-known as Scotsman. Green Arrow is much less well-known outside railway circles and would not be the same draw with Joe Public.
    It’s a shame Anthony Coulls no longer posts on here; it would be interesting to hear his thoughts in the debate
     
    MellishR, green five, ghost و 1 شخص آخر معجبون بهذا.
  7. 26D_M

    26D_M Part of the furniture

    إنضم إلينا في:
    ‏22 اكتوبر 2009
    المشاركات:
    4,894
    عدد المعجبين:
    2,175
    There was an interview with the NRM in one of the magazines maybe 5 or 6 years back which said the museum didn't make any money from the A3, it all went into a pot from which the custodian had to ensure it was maintained and operated as stipulated in the contract.
    Obviously the contract was let to a new custodian more recently than that so whether the terms are the same we don't know but the loco has perhaps earned less over the current term than previously as its workload seems to have been reduced.
     
  8. Miff

    Miff Part of the furniture Friend

    إنضم إلينا في:
    ‏17 جوان 2008
    المشاركات:
    3,243
    عدد المعجبين:
    3,476
    What about 70013 - how is the overhaul being funded?
     
  9. ghost

    ghost Part of the furniture

    إنضم إلينا في:
    ‏29 ماي 2006
    المشاركات:
    4,482
    عدد المعجبين:
    6,127
    الجنس:
    ذكر
    مكان الإقامة:
    N.Ireland
    Heritage Railway Volunteer:
    Yes I am an active volunteer
    Isn’t that covered by the 5305LA?
     
  10. 26D_M

    26D_M Part of the furniture

    إنضم إلينا في:
    ‏22 اكتوبر 2009
    المشاركات:
    4,894
    عدد المعجبين:
    2,175
    GCR I think, as the railway is now custodian rather than 5305LA.
     
    Last edited: ‏5 جوان 2026
  11. ghost

    ghost Part of the furniture

    إنضم إلينا في:
    ‏29 ماي 2006
    المشاركات:
    4,482
    عدد المعجبين:
    6,127
    الجنس:
    ذكر
    مكان الإقامة:
    N.Ireland
    Heritage Railway Volunteer:
    Yes I am an active volunteer
    You’re right, I forgot about that change. Thanks
     
    أعجب بهذه المشاركة 26D_M
  12. William Fletcher

    William Fletcher Member

    إنضم إلينا في:
    ‏25 نوفمبر 2016
    المشاركات:
    326
    عدد المعجبين:
    395
    الجنس:
    ذكر
    مكان الإقامة:
    Lincoln
    Heritage Railway Volunteer:
    Yes I am an active volunteer
    The cost of FS, much vaunted and derided as the "Flying Moneypit" has now in my view been eclipsed by others, including Blue Peter, which Jeremy Hosking had quoted very publically last year as having cost him £5m. We are now in the era of the multi-million pound paid for overhaul, like it or not.
     
    Spinner, keith6233, green five و 1 شخص آخر معجبون بهذا.
  13. W.Williams

    W.Williams Well-Known Member

    إنضم إلينا في:
    ‏20 ديسمبر 2015
    المشاركات:
    1,704
    عدد المعجبين:
    1,619
    الوظيفة:
    Mechanical Engineer
    مكان الإقامة:
    Aberdeenshire
    Heritage Railway Volunteer:
    Yes I am an active volunteer
    100 year world speed record 2038 has a ring to it.
     
  14. Gladiator 5076

    Gladiator 5076 Resident of Nat Pres

    إنضم إلينا في:
    ‏2 اكتوبر 2015
    المشاركات:
    9,727
    عدد المعجبين:
    8,294
    الجنس:
    ذكر
    مكان الإقامة:
    Swanage
    Heritage Railway Volunteer:
    No I do not currently volunteer
    But that was paid for by a wealthy collector, NRM locos are basically public money.
    If I wanted to spend £5M restoring something, if I had the money, nothing to do with anybody but me.
     
  15. Flying Phil

    Flying Phil Part of the furniture

    إنضم إلينا في:
    ‏10 ديسمبر 2018
    المشاركات:
    3,156
    عدد المعجبين:
    6,895
    الجنس:
    ذكر
    مكان الإقامة:
    Leicestershire
    Heritage Railway Volunteer:
    Yes I am an active volunteer
    The GCR is also overhauling Sir Lamiel 30777 and the 04/8K 63601, which are NRM locomotives. I "suspect" along the lines of costs of parts and labour by the DCRT/GCR "as and when", in return, they will run on the GCR for up to ten years after completion - when not required by the NRM. Needless to say this is supposition, as the precise details are commercial and confidential.
     
  16. Miff

    Miff Part of the furniture Friend

    إنضم إلينا في:
    ‏17 جوان 2008
    المشاركات:
    3,243
    عدد المعجبين:
    3,476
    @Flying Phil I suspect you're right. GCR were announced as new custodians to overhaul and run 70013 (including main line certification) after the last ticket expired, but no financial arrangements were mentioned and, as far as I know, there has not been a high profile appeal for funding.

    As for Green Arrow I suspect there is (or was) a view within NRM that they would love to run it again, and no firm conclusions on what cylinder repair/replace monobloc with monobloc/replace monobloc with fabrication options might be acceptable. But they've never found a funding/overhaul partner and no longer have the engineering capability to do it themselves.
     
    Last edited: ‏5 جوان 2026
  17. 26D_M

    26D_M Part of the furniture

    إنضم إلينا في:
    ‏22 اكتوبر 2009
    المشاركات:
    4,894
    عدد المعجبين:
    2,175
    The strange part of GC funding 70013 overhaul to include mainline use is what benefit the extra costs bring for a Railway which doesn't currently have a connection to the network.
    I "assume" 5305LA is still heavily involved with the loco and would again form any support crew but they also have 45305 of course which one would presume to be the priority.
     
  18. acorb

    acorb Part of the furniture

    إنضم إلينا في:
    ‏17 جويلية 2007
    المشاركات:
    3,618
    عدد المعجبين:
    6,315
    مكان الإقامة:
    Powys
    Green Arrow was only overhauled last time due to private sponsorship by Dr Michael Peagram - a mere £100k then. I suspect it would need similar sponsorship now for any hope of change of fortune and at least 10 times that amount..
     
    William Fletcher و silversteellady معجبون بهذا.
  19. The Green Howards

    The Green Howards Nat Pres stalwart

    إنضم إلينا في:
    ‏20 فبراير 2016
    المشاركات:
    15,477
    عدد المعجبين:
    9,050
    الوظيفة:
    Layabout
    مكان الإقامة:
    My settee, mostly.
    Heritage Railway Volunteer:
    No I do not currently volunteer
    Thanks for the correction @guycarr360 .
     
  20. The Green Howards

    The Green Howards Nat Pres stalwart

    إنضم إلينا في:
    ‏20 فبراير 2016
    المشاركات:
    15,477
    عدد المعجبين:
    9,050
    الوظيفة:
    Layabout
    مكان الإقامة:
    My settee, mostly.
    Heritage Railway Volunteer:
    No I do not currently volunteer
    Not. A. Chance.

    Mallard is simply too valuable to try that again - besides which, the Yanks might have built, steamed and lifted the record with that T1 thing of theirs by then!
     
    DismalChips و MellishR معجبون بهذا.

مشاركة هذه الصفحة