If you register, you can do a lot more. And become an active part of our growing community. You'll have access to hidden forums, and enjoy the ability of replying and starting conversations.

North Yorkshire Moors Railway General Discussion

Dieses Thema im Forum 'Heritage Railways & Centres in the UK' wurde von The Black Hat gestartet, 13 Februar 2011.

  1. 60044

    60044 Well-Known Member

    Registriert seit:
    24 Februar 2016
    Beiträge:
    1.381
    Zustimmungen:
    1.912
    Geschlecht:
    männlich
    Ort:
    Salisbury
    Heritage Railway Volunteer:
    Yes I am an active volunteer
    If I did, it's unlikely she would pay any attention. Best I can do is to try to bring matters to a more widespread readership, in the hopes that it may cause some effect at the NYMR. We know that @Lineisclear visits here, for example, and he must have a hide like a rhinoceros if he doesn't pick up and pass on some of it. Probably his hide is rather thicker than that, though, so it will take a lot more barbed arrows to penetrate!
     
    Last edited: 18 Mai 2026 um 09:05
    jnc gefällt dies.
  2. Sulzerman

    Sulzerman Member

    Registriert seit:
    22 Januar 2025
    Beiträge:
    209
    Zustimmungen:
    266
    Geschlecht:
    männlich
    Ort:
    Malton
    Heritage Railway Volunteer:
    No I do not currently volunteer
    In a normal holiday week, when open to Whitby, are there as many as 107 people on the three Whitby trains at 0920, 1000 (ex Whitby), and 1200?

    I would imagine the total would normally be higher, especially the 0920, which may load 200 or more.

    Thomas week will need around 1000 seats sold per day to match the normal income of the standard service. With 11 Thomas trains per day, that's 91 on every train, daily.
    I've seen some afternoon trains with just 4 seats sold, so far, and very few with more than 70 sold. There's 5 days left to book online.
    Surely an event like this needs to be reasonably certain of doubling normal takings before being given the go ahead.
    It all seems a bit high risk.
     
    Last edited: 18 Mai 2026 um 12:27
  3. jnc

    jnc Well-Known Member

    Registriert seit:
    3 April 2012
    Beiträge:
    1.700
    Zustimmungen:
    2.938
    Geschlecht:
    männlich
    Ort:
    Western Atlantic
    Heritage Railway Volunteer:
    No I do not currently volunteer
    Ah, right, those could be used to apply upward force on the bridge structure.
    Right, but how much load can they handle? I am concerned that the truss on the bottom now doesn't have the load-carrying capacity of the girder if the original drawings (although without a lot more information on both, it's impossible to say for sure).
    The weight of the bridge's own structure (the 'dead load', in engineer-speak) is probably very considerable for a masonry bridge like this one; I would guess on the same order of magnitude as that of the train (the 'live load').

    Noel
     
    Last edited: 18 Mai 2026 um 12:14
  4. 21B

    21B Part of the furniture

    Registriert seit:
    2 September 2009
    Beiträge:
    5.133
    Zustimmungen:
    11.982
    The bridge will weigh a lot more than any train, or at least the part of the train on the bridge. The point is not to take the weight of the bridge, but to help it to bear the weight of the train. Think of it as reinforcing, not supporting.
     
    Paul42 und Sheff gefällt dies.
  5. Wonkyturntables

    Wonkyturntables New Member

    Registriert seit:
    29 Januar 2026
    Beiträge:
    7
    Zustimmungen:
    39
    Geschlecht:
    männlich
    Ort:
    York
    Heritage Railway Volunteer:
    Yes I am an active volunteer
    I think it would be better if the propping actually made contact with the bridge if it is to help it take the weight of anything but I’m no engineer.

    Hopefully we will have all of the answers soon. My email contact has been in touch this morning to say they and other colleagues have finally reported their concerns about the appointment, condemning, procurement and propping to the charity commission based on the cost of the work and risk to the charity, here’s hoping that the CC has the time and energy to look into this big horrible mess and either put an end to the chatter or confirm that those concerned were right.

    I’m not convinced that it will go anywhere but at least it sounds like some people are trying to get answers.
     
    Paul42 und jnc gefällt dies.
  6. 60044

    60044 Well-Known Member

    Registriert seit:
    24 Februar 2016
    Beiträge:
    1.381
    Zustimmungen:
    1.912
    Geschlecht:
    männlich
    Ort:
    Salisbury
    Heritage Railway Volunteer:
    Yes I am an active volunteer
    @Andy Moody : You may have had a point with your criticism of me if I was the only person expressing severe doubts about the management of the NYMR but the pevious post by @Wonkturntables, which seems to be from someone closer to the action than I am, ought to providing more than adequate grounds for concern - and I know of many more who feel the same. I have no confidence that the charity commission will do anything to respond, but at least when the NYMR finally goes bust they will not be able to deny that they were at least warned.
     
  7. jnc

    jnc Well-Known Member

    Registriert seit:
    3 April 2012
    Beiträge:
    1.700
    Zustimmungen:
    2.938
    Geschlecht:
    männlich
    Ort:
    Western Atlantic
    Heritage Railway Volunteer:
    No I do not currently volunteer
    The structure of the bridge doesn't differentiate in any way between dead load and live load. (When doing finite element modelling of the bridge, one would of course have to, since the vectors - both axis and location - of the loads are not the same, between the two.) The structure of the bridge has to bear both, at the same time. A railway bridge in Scotland recently collapsed from dead load alone.

    You are sort of correct that it is reinforcing, not supporting, but those aren't as discrete as one might think - as the share of the load taken by the propping increases, when it gets to 100%, it has transitioned from reinforcing to supporting.

    Noel
     
    Kirk Oswald gefällt dies.
  8. 35B

    35B Nat Pres stalwart

    Registriert seit:
    18 Juni 2011
    Beiträge:
    32.128
    Zustimmungen:
    34.658
    Geschlecht:
    männlich
    Ort:
    Grantham
    Heritage Railway Volunteer:
    No I do not currently volunteer
    The CC are a weak regulator, under resourced and with narrow terms of reference. As demonstrated elsewhere (see other threads here, or look up the Actors Benevolent Fund), they will run a mile from anything that looks like it might remotely be an internal dispute even (especially?) where that dispute is between “doing things right” and how they’re run now”.

    As it happens, I would be surprised if they intervened in any case. The charity governance is all properly constructed and being operated according to the letter of the rules - and if as I presume this work is being done by the company wholly owned by the charity, it would be out of scope for the CC anyway.

    The issues at NYMR are in a different category, relating to the strategic decisions made by trustees and their appointed managers. Regulators aren’t there to stop people making bad decisions - one of the key reasons why I’ve been so critical of the determination of @Lineisclear to frame accountability in terms of accountability to regulators.
     
    Kirk Oswald, Jamessquared, Sheff und 2 anderen gefällt dies.
  9. Sheff

    Sheff Resident of Nat Pres

    Registriert seit:
    21 April 2006
    Beiträge:
    8.542
    Zustimmungen:
    3.879
    Geschlecht:
    männlich
    Beruf:
    Retired Engineer & Heritage Volunteer
    Ort:
    Leicestershire
    Heritage Railway Volunteer:
    No I do not currently volunteer
    If there’s no contact then what would be its purpose?
     
  10. mdewell

    mdewell Well-Known Member Friend

    Registriert seit:
    23 März 2005
    Beiträge:
    2.177
    Zustimmungen:
    3.484
    Beruf:
    UK & Ireland Heritage Railways Webmaster
    Ort:
    Ruabon, Wrexham
    Heritage Railway Volunteer:
    Yes I am an active volunteer
    Perhaps it's just a working platform for those repairing the brickwork?
    (Although nearly all related info from NYMR does say 'propping'). :confused:
     
  11. Jamessquared

    Jamessquared Nat Pres stalwart

    Registriert seit:
    8 März 2008
    Beiträge:
    29.108
    Zustimmungen:
    70.514
    Ort:
    LBSC 215
    Heritage Railway Volunteer:
    Yes I am an active volunteer
    Judging from the photos, if it is a working platform for those repairing the brickwork, you’d hope they’d be pretty skinny!

    Tom
     
    Steve, Sheff, big.stu und 3 anderen gefällt dies.
  12. Sulzerman

    Sulzerman Member

    Registriert seit:
    22 Januar 2025
    Beiträge:
    209
    Zustimmungen:
    266
    Geschlecht:
    männlich
    Ort:
    Malton
    Heritage Railway Volunteer:
    No I do not currently volunteer
    It looks a pretty comprehensive job.
     
  13. 60044

    60044 Well-Known Member

    Registriert seit:
    24 Februar 2016
    Beiträge:
    1.381
    Zustimmungen:
    1.912
    Geschlecht:
    männlich
    Ort:
    Salisbury
    Heritage Railway Volunteer:
    Yes I am an active volunteer
    How can it be comprehensive when there doesn't seem to be anything in contact with the arch, at least at the upper, thinnest part of the masonry? Shouldn't there be some timber in there as well?
     
  14. Sheff

    Sheff Resident of Nat Pres

    Registriert seit:
    21 April 2006
    Beiträge:
    8.542
    Zustimmungen:
    3.879
    Geschlecht:
    männlich
    Beruf:
    Retired Engineer & Heritage Volunteer
    Ort:
    Leicestershire
    Heritage Railway Volunteer:
    No I do not currently volunteer
    I’m not sure what your source is for that comment? If it’s the photo above, then there is an arch of steel seen below the masonry, and I’d be surprised if there weren’t packers in there as well?
    IMG_0288.jpeg
     
    banburysaint, std tank, YorkyLad und 4 anderen gefällt dies.
  15. brennan

    brennan Member

    Registriert seit:
    11 September 2016
    Beiträge:
    560
    Zustimmungen:
    663
    Ort:
    Gloucester
    Heritage Railway Volunteer:
    No I do not currently volunteer
    What a wealth of structural engineering knowledge we have on this website!
     
  16. Bikermike

    Bikermike Well-Known Member

    Registriert seit:
    11 März 2020
    Beiträge:
    2.130
    Zustimmungen:
    2.438
    Geschlecht:
    männlich
    Ort:
    Thameslink territory
    Heritage Railway Volunteer:
    No I do not currently volunteer
    Also, why should it be most in need of support at that point?
    An arch thrusts outwards. It's thinnest there becuase it can be. Where the support will be needed depends very much on the mode of failure.

    It's interesting to note that that the pic shows historical tie rods going accross the structure, which imply there has been a problem with sideways spread in the past, which is an unusual mode of failure in a bridge.
     
    Sheff gefällt dies.
  17. Breva

    Breva Part of the furniture

    Registriert seit:
    11 Oktober 2010
    Beiträge:
    2.562
    Zustimmungen:
    4.399
    Ort:
    Gloucestershire
    Heritage Railway Volunteer:
    Yes I am an active volunteer
    It doesn't look so bad from this angle. Did we find out exactly what is wrong with it?
     
  18. Bikermike

    Bikermike Well-Known Member

    Registriert seit:
    11 März 2020
    Beiträge:
    2.130
    Zustimmungen:
    2.438
    Geschlecht:
    männlich
    Ort:
    Thameslink territory
    Heritage Railway Volunteer:
    No I do not currently volunteer
    I would expect themto have more support underneath if providing any lifting force - following the line of the screw portion to the ground. Is the river navigable btw?
    Also, I'd not fancy liftting that bridge by hand, (for effort and H&S reasons), if there was any positive upward force, I'd expect it to have been powered, probably by hydraulics.

    I suspect they are adjusters to bring packing into place.

    What is interesting is that the screws we can see are at the shoulders rather than the crown.

    If you think about the size and mass of a set of bridge girders on a railway bridge, the propping looks less sizeable than that (noting it is a multi girder system and the possible strengthening factor of the arch form). I'd assume it's therefore doing less work than the full weight.

    I wonder if excessive deformation is the issue?
    Or movement of the abutments

    It doesn't look a terribly convenient set-up to work at the underside of the arch from.
     
    Paul42, 35B und Chris86 gefällt dies.
  19. Springs Branch

    Springs Branch Member

    Registriert seit:
    6 März 2016
    Beiträge:
    207
    Zustimmungen:
    271
    Geschlecht:
    männlich
    Beruf:
    Retired
    Ort:
    8F
    Heritage Railway Volunteer:
    No I do not currently volunteer
    Taking your previous comments into account, I find it strange that you haven't expected the CEO to personally inspect and agree the work done.
     
    goldfish gefällt dies.
  20. mdewell

    mdewell Well-Known Member Friend

    Registriert seit:
    23 März 2005
    Beiträge:
    2.177
    Zustimmungen:
    3.484
    Beruf:
    UK & Ireland Heritage Railways Webmaster
    Ort:
    Ruabon, Wrexham
    Heritage Railway Volunteer:
    Yes I am an active volunteer
    There were some photos (several pages ago) showing cracks and missing bricks from the bottom layer of the arch.
     