Bridge that Gap: Great Central Railway News

Discuție în 'Heritage Railways & Centres in the UK' creată de Gav106, 8 Mai 2010.

  1. jnc

    jnc Well-Known Member

    Înscris:
    3 Apr 2012
    Mesaje:
    1.715
    Aprecieri primite:
    2.971
    Sex:
    Masculin
    Locație:
    Western Atlantic
    Heritage Railway Volunteer:
    No I do not currently volunteer
    Here.

    Noel
     
    CH 19, Enterprise, banburysaint și alți 3 apreciază asta.
  2. Sheff

    Sheff Resident of Nat Pres

    Înscris:
    21 Apr 2006
    Mesaje:
    8.570
    Aprecieri primite:
    3.937
    Sex:
    Masculin
    Ocupație:
    Retired Engineer & Heritage Volunteer
    Locație:
    Leicestershire
    Heritage Railway Volunteer:
    No I do not currently volunteer
    Does that mean they’ll have to pile down to that level?
     
  3. mikechant

    mikechant Member

    Înscris:
    24 Oct 2012
    Mesaje:
    267
    Aprecieri primite:
    299
    Just got a small windfall and bunged them £500 (£625 with gift aid), I hope they make the target soon so they can get stuck in.

    Always make sure you use gift aid when donating if you possibly can!
     
    hyboy, Flying Phil, Gav106 și alți 9 apreciază asta.
  4. Johann Marsbar

    Johann Marsbar Well-Known Member

    Înscris:
    21 Feb 2016
    Mesaje:
    1.729
    Aprecieri primite:
    2.356
    Sex:
    Masculin
    Locație:
    Suffolk
    Heritage Railway Volunteer:
    No I do not currently volunteer
  5. Flying Phil

    Flying Phil Part of the furniture

    Înscris:
    10 Dec 2018
    Mesaje:
    3.158
    Aprecieri primite:
    6.920
    Sex:
    Masculin
    Locație:
    Leicestershire
    Heritage Railway Volunteer:
    Yes I am an active volunteer
    For those who don't "Do" You Tube, the video confirms the ground investigation is all correct and presents no problem. The latest environmental survey has been done again with no significant issues raised. The Factory Flyover and Urban Viaduct detailed specification and drawings are complete and paid for. Over £2.9M is in the bank with fundraising obviously ongoing.
    The visit of Tornado and Flying Scotsman to the GCR(N) has gone very well and limited evening running has been approved.
    Well done to all involved for what has been lots of hard work.
     
    bristolian, acorb, Chris86 și alți 8 apreciază asta.