If you register, you can do a lot more. And become an active part of our growing community. You'll have access to hidden forums, and enjoy the ability of replying and starting conversations.

GWSR General Discussion and Operations

Dieses Thema im Forum 'Heritage Railways & Centres in the UK' wurde von michaelh gestartet, 25 August 2013.

  1. Bikermike

    Bikermike Well-Known Member

    Registriert seit:
    11 März 2020
    Beiträge:
    2.108
    Zustimmungen:
    2.395
    Geschlecht:
    männlich
    Ort:
    Thameslink territory
    Heritage Railway Volunteer:
    No I do not currently volunteer
    Wiki says built in 1906, so I'm afraid you have missed contractual limitation by a mere 120 years. Unless the contract was executed as a deed, it's only 114 years late.

    That's before you get to the problem of privity of contract.

    I hate to break it to you, but your chances of recovery are... limited...:p

    (We are happy to run the claim of course (at very reasonable rates), but we are regrettably unable to offer a "no win no fee" arrangement on this matter...)
     
    Hirn, jnc, banburysaint und 5 anderen gefällt dies.
  2. flying scotsman123

    flying scotsman123 Resident of Nat Pres

    Registriert seit:
    9 September 2013
    Beiträge:
    10.866
    Zustimmungen:
    19.472
    Geschlecht:
    männlich
    Ort:
    Cheltenham
    Heritage Railway Volunteer:
    Yes I am an active volunteer
    acorb, The Dainton Banker und jnc gefällt dies.
  3. jnc

    jnc Well-Known Member

    Registriert seit:
    3 April 2012
    Beiträge:
    1.669
    Zustimmungen:
    2.904
    Geschlecht:
    männlich
    Ort:
    Western Atlantic
    Heritage Railway Volunteer:
    No I do not currently volunteer
    Luckily the state of the embankment is seemingly such that the poor-quality material can simply be removed, without the remaining material of the embankment (including the active track-bed) collapsing (as seen in bottom image, there).

    Equally happily, there's apparently no rain at the moment, so the temporary vertical face around the removed material should hopefully be stable for the few days needed to backfill the resulting hole with the new granular material. (And I hope I haven't jinxed the weather by saying that!)

    I get the impression that the repair will only involve the replacement of embankment material with new granular material; apparently no piling will be needed? This could all be finished pretty quickly, then!

    Noel
     
  4. Andy B

    Andy B Member

    Registriert seit:
    31 Juli 2007
    Beiträge:
    539
    Zustimmungen:
    886
    Ort:
    Bristol

Die Seite empfehlen