    Is the Grosmont Co-op now the NYMR's official communications agency?

    Tom
     
    已获得Sheff, Diamond Gaz, green five另外10人的支持.
  2. 5944

    5944 Resident of Nat Pres

    注册日期:
    2006-01-14
    帖子:
    9,998
    支持:
    11,987
    性别:
    职业:
    Train Maintainer for GTR at Hornsey
    所在地:
    Letchworth
    Heritage Railway Volunteer:
    No I do not currently volunteer
    It's certainly a lot easier getting information out of them!
     
    已获得banburysaint, green five, Paul42另外6人的支持.
  3. Kirk Oswald

    Kirk Oswald New Member

    注册日期:
    2024-04-01
    帖子:
    69
    支持:
    152
    所在地:
    Kirkoswald
    Heritage Railway Volunteer:
    Yes I am an active volunteer
    I know the Grosmont Post Office team and they always try and "look after" the village in the nicest possible way. I also know from bitter experience that the NYMR Park Street Mafia deceive, distort and obfuscate at every opportunity.

    I wasn't at the meeting last night (had to be elsewhere) but know from first hand reports that it was the expected PR performance. Reassurances were offered and in theory work starts today on propping the structure, the railway having just about raised the £250,000 to pay for the first part of the project. Completion of repairs is said to be scheduled for Winter 2026/27 which is a sensible timeframe.

    However there is no assurance that an additional £500,000 or more can be raised to fund the actual work. Meanwhile the scaffolding will be a liability in terms of the rental being paid until the work has been done.
     
    已获得banburysaint, green five, oldmrheath另外3人的支持.
  4. 47406

    47406 Well-Known Member

    注册日期:
    2006-10-24
    帖子:
    1,445
    支持:
    215
    性别:
    职业:
    Operations Manager
    所在地:
    County Durham
    So now we are up to v2.6 of the timetable, so 9th edition.
     
  5. cksteam

    cksteam Member

    注册日期:
    2011-08-25
    帖子:
    313
    支持:
    403
    性别:
    职业:
    Planning
    所在地:
    Halifax, West Yorkshire
    Heritage Railway Volunteer:
    No I do not currently volunteer
    Is it too late to get a sweepstake going to guess the final number?
     
    已获得47406的支持.
  6. 5944

    5944 Resident of Nat Pres

    注册日期:
    2006-01-14
    帖子:
    9,998
    支持:
    11,987
    性别:
    职业:
    Train Maintainer for GTR at Hornsey
    所在地:
    Letchworth
    Heritage Railway Volunteer:
    No I do not currently volunteer
    15th day of normal services and they're already on the ninth timetable?! :eek:
     
    已获得47406的支持.
  7. jnc

    jnc Well-Known Member

    注册日期:
    2012-04-03
    帖子:
    1,702
    支持:
    2,939
    性别:
    所在地:
    Western Atlantic
    Heritage Railway Volunteer:
    No I do not currently volunteer
    Some element(s) of the bridge 42 repair (the initial report wasn't very detailed) - either the propping (if there is such - see below) or the repair itself.

    I say "propping (if there is such" because the 'Essential Maintenance Work' document says nothing about propping! It only talks about "temporary access scaffolding". It describes that thusly: "scaffold will comprise a series of beams spanning longitudinally across the bridge above parapet level. At each bearing point, the structure will be protected using foam and soft timber pattresses to prevent damage to the masonry. No drilling or fixings into the masonry arches will be required; the scaffold will be entirely free-standing. All scaffold loading will be carefully assessed to ensure compatibility with the bridge’s load-bearing capacity."

    I'm not quite sure what that last sentence means/implies, but the overall vibe I get from the entire quoted segment is that the scaffolding is just for worker access, and to hold up the newly-replaced brickwork (while the concrete cures); not as temporary means to support the bridge structure. In fact, the impression I get is that the scaffolding might be leaning on the bridge ("bearing point") - but at the same time it says "the scaffold will be entirely free-standing".

    I confess I don't fully understand the quoted description; if anyone can enlighten me I'd be grateful.

    PS: It's possible that the propping is not covered at all in the "Essential Maintenance Work" document (but it should be in the environment paperwork, since it'll have to be standing in the river). Since it's apparently about to start shortly, we shall soon see.

    Noel
     
    Last edited: 2026-04-14
    已获得Sheff的支持.
  8. jnc

    jnc Well-Known Member

    注册日期:
    2012-04-03
    帖子:
    1,702
    支持:
    2,939
    性别:
    所在地:
    Western Atlantic
    Heritage Railway Volunteer:
    No I do not currently volunteer
    It's possible that the repair scaffolding (see above) is a separate thing from the 'propping' (about which I see nothing anywhere in the planning application, all of which I quickly just reviewed), and that the scaffolding will only be installed shortly before the main repair work starts. If so, that would cut down on the scaffolding rental costs.

    (If anyone could point me at any documentation on the 'propping' I would be grateful.)

    Noel
     
  9. Sulzerman

    Sulzerman Member

    注册日期:
    2025-01-22
    帖子:
    209
    支持:
    266
    性别:
    所在地:
    Malton
    Heritage Railway Volunteer:
    No I do not currently volunteer
    已获得Sheffjnc的支持.
  10. Steve

    Steve Nat Pres stalwart Friend

    注册日期:
    2006-10-07
    帖子:
    13,438
    支持:
    13,739
    职业:
    Gentleman of leisure, nowadays
    所在地:
    Near Leeds
    Heritage Railway Volunteer:
    Yes I am an active volunteer
    The propping and repairs are two separate things. The repairs require planning permission as it is a listed structure and will be invasive. The propping is not and is not referred to in the planning application. The scaffolding referred to in the planning is for access and is free standing in that it is not physically attached to the bridge. However, it will rest on the bridge, as I understand it.
     
    已获得jnc的支持.
  11. std tank

    std tank Part of the furniture

    注册日期:
    2005-09-20
    帖子:
    4,008
    支持:
    1,141
    性别:
    职业:
    Retired
    所在地:
    Liverpool
    Heritage Railway Volunteer:
    Yes I am an active volunteer
    Surely, the scaffolding will be required, from the riverbed upwards, to enable the propping to be built.
     
  12. Andy Williams

    Andy Williams Well-Known Member

    注册日期:
    2010-04-23
    帖子:
    1,112
    支持:
    1,124
    职业:
    Design Engineer
    所在地:
    Shropshire
    Heritage Railway Volunteer:
    Yes I am an active volunteer
    I believe that the components used to form the propping are on hire from a supplier, and will need to remain in place until early 2027.

    If the crane is due to arrive on Monday 20th April, that constitutes a slippage of two weeks on the original four week programme. The proposed re-opening date of 2nd May may now be in doubt.
     
    Last edited: 2026-04-14
    已获得jnc35B47406的支持.
  13. jnc

    jnc Well-Known Member

    注册日期:
    2012-04-03
    帖子:
    1,702
    支持:
    2,939
    性别:
    所在地:
    Western Atlantic
    Heritage Railway Volunteer:
    No I do not currently volunteer
    Actually, not. As @Steve points out, since the propping is temporary, and will not involve any changes to the permanent structure, there is nothing about it in the application (and thus in the plans therein).

    Still, there's enough detail shown in the images on the page you found to give a good idea what's involved - thanks.

    Noel
     
    Last edited: 2026-04-14
    已获得northernsteam的支持.
  14. Enterprise

    Enterprise Part of the furniture

    注册日期:
    2005-09-09
    帖子:
    5,787
    支持:
    3,763
  15. flying scotsman123

    flying scotsman123 Resident of Nat Pres

    注册日期:
    2013-09-09
    帖子:
    10,901
    支持:
    19,603
    性别:
    所在地:
    Cheltenham
    Heritage Railway Volunteer:
    Yes I am an active volunteer
    To be fair to NYMR, I'm not sure I'd necessarily expect calcs to be released to the public. Even with confidence as low as we all have with the railway atm, I think it's still reasonable to expect someone competent has designed the propping scheme and put their name to it without having to be explicitly told so.

    Sent from my PGT-N19 using Tapatalk
     
    已获得northernsteam, Musket The Dog, jnc另外2人的支持.
  16. Enterprise

    Enterprise Part of the furniture

    注册日期:
    2005-09-09
    帖子:
    5,787
    支持:
    3,763
    I don't mean released to the general public, but an external agency with a purview of the matter. I agree it is reasonable to expect that the analysis has been done, but I have my doubts. Clearly Mr Sash lacks the necessary qualifications.
     
  17. paul1609

    paul1609 New Member

    注册日期:
    2006-06-09
    帖子:
    156
    支持:
    277
    性别:
    所在地:
    Wittersham, Isle of Oxney
    Heritage Railway Volunteer:
    Yes I am an active volunteer
    Id imagine its a pretty specialist operation especially where the bridge is of mixed construction like this. Id guess that its the same contractor doing the calculations and installing/ hiring the props.
     
  18. iancawthorne

    iancawthorne Well-Known Member

    注册日期:
    2010-08-23
    帖子:
    1,805
    支持:
    6,327
    性别:
    所在地:
    Brampton, Cumbria
    Scaffolding started to be erected round bridge 42 today.
     
    已获得banburysaint47406的支持.
  19. jnc

    jnc Well-Known Member

    注册日期:
    2012-04-03
    帖子:
    1,702
    支持:
    2,939
    性别:
    所在地:
    Western Atlantic
    Heritage Railway Volunteer:
    No I do not currently volunteer
    Any chance we could get some images?

    The drawings in We're Proactively Propping Bridge 42 show 4 (two pairs) temporary (presumably) piers, erected in the river bottom, which will have to go in before the propping can be installed.

    Noel
     
  20. 5944

    5944 Resident of Nat Pres

    注册日期:
    2006-01-14
    帖子:
    9,998
    支持:
    11,987
    性别:
    职业:
    Train Maintainer for GTR at Hornsey
    所在地:
    Letchworth
    Heritage Railway Volunteer:
    No I do not currently volunteer
    已获得banburysaintjncKirk Oswald的支持.

分享此页面