If you register, you can do a lot more. And become an active part of our growing community. You'll have access to hidden forums, and enjoy the ability of replying and starting conversations.

P2 Locomotive Company and related matters

Dieses Thema im Forum 'Steam Traction' wurde von class8mikado gestartet, 13 September 2013.

  1. guycarr360

    guycarr360 Part of the furniture

    Registriert seit:
    4 Oktober 2005
    Beiträge:
    5.195
    Zustimmungen:
    3.426
    Geschlecht:
    männlich
    Ort:
    Chester le Street County Durham
    Image taken from FB this morning.

    587529002_18434079259111889_3610591071429039059_n.jpg
     
  2. Bikermike

    Bikermike Well-Known Member

    Registriert seit:
    11 März 2020
    Beiträge:
    2.089
    Zustimmungen:
    2.356
    Geschlecht:
    männlich
    Ort:
    Thameslink territory
    Heritage Railway Volunteer:
    No I do not currently volunteer
    According to a comment on FB, so it must be true, the Trust intend to steam test it in "Q1 next year"
    This seems at odds with my understanding of boiler management in the UK, in that the 10[1] years of "ticket" starts on the steam test.
    Unless they are a lot further forwards with other stuff than is currently advertised, is this not a little premature?

    FTAOD, I would assume this is a lost in translation matter, or is my understanding of boilers off?
    [1] or 12, or whatever, depending on what the boiler inspector allows on inspections year on year
     
  3. class8mikado

    class8mikado Part of the furniture

    Registriert seit:
    1 Juni 2009
    Beiträge:
    3.958
    Zustimmungen:
    1.722
    Beruf:
    Print Estimator/ Repository of Useless Informatio.
    Ort:
    Bingley W.Yorks.
    Heritage Railway Volunteer:
    No I do not currently volunteer
    You can test a boiler any number of times in a variety of ways, they may for instance want to double check its dimensions when 'warm'
    When it is tested to specific criteria in the presence of an inspector qualified to issue said 'ticket' the clock starts.
     
    green five, Kinghambranch, osprey und 2 anderen gefällt dies.
  4. Bikermike

    Bikermike Well-Known Member

    Registriert seit:
    11 März 2020
    Beiträge:
    2.089
    Zustimmungen:
    2.356
    Geschlecht:
    männlich
    Ort:
    Thameslink territory
    Heritage Railway Volunteer:
    No I do not currently volunteer
    Ta! There's a lot I don't know about boilers
     
    osprey gefällt dies.
  5. Steve

    Steve Nat Pres stalwart Friend

    Registriert seit:
    7 Oktober 2006
    Beiträge:
    13.309
    Zustimmungen:
    13.425
    Beruf:
    Gentleman of leisure, nowadays
    Ort:
    Near Leeds
    Heritage Railway Volunteer:
    Yes I am an active volunteer
    There is no written rule on this. It will usually depend on what the written scheme says and even that might not be stated. Written schemes I’ve usually been associated with have stated a hydraulic test at a maximum of 10 yearly intervals and nothing about steaming dates. A lot will depend on what the Inspector thinks. HRA guidance suggests boiler overhauls at 7-10 year intervals but doesn't say when the clock starts ticking. It is not cast in tablets of stone. The inspector will usually say something on his report along the lines of. “At the next examination the boiler shall be removed from the frames ……” when he thinks that the boiler is becoming due for overhaul.
    As far as the Pressure Systems Regulations go, it is all down to what’s in the written scheme.
     
    Last edited: 9 Dezember 2025
    keith6233, Kinghambranch und Jamessquared gefällt dies.
  6. Bikermike

    Bikermike Well-Known Member

    Registriert seit:
    11 März 2020
    Beiträge:
    2.089
    Zustimmungen:
    2.356
    Geschlecht:
    männlich
    Ort:
    Thameslink territory
    Heritage Railway Volunteer:
    No I do not currently volunteer
    Interesting, again, the post in FB states it's been hydraulically-tested, so if correct, presumably the 10 years will not start from hydraulic test, or that won't be the "hydraulic test" for the purposes of the written scheme.

    Given the history of Menningem boiler-making generally and specifically the A1SLT boilers, I would imagine both parties will be very keen to prove fitness of the boiler much more than is usually the case.
     
  7. Kylchap

    Kylchap Member

    Registriert seit:
    15 Dezember 2015
    Beiträge:
    518
    Zustimmungen:
    999
    Geschlecht:
    männlich
    Ort:
    East Anglia
    Heritage Railway Volunteer:
    No I do not currently volunteer
    I'm surprised nobody saw this coming up the motorway.
     
  8. Chuffington

    Chuffington New Member

    Registriert seit:
    25 April 2018
    Beiträge:
    105
    Zustimmungen:
    65
    Geschlecht:
    männlich
    Ort:
    Cheltenham
    Heritage Railway Volunteer:
    Yes I am an active volunteer
    I have known different boiler inspectors to interpret things differently depending on the situation, for instance I have known a boiler to be tested at the repair company, but not put onto the frames for two years (stored under a strict regime) only for the final out of frames test to be done two years from the repair test.
    Then others have taken it to the letter and only issued the ticket from the final out of frames test.
    And others have issued the ticket from the final in frames test, although that situation is becoming rearer.
     
  9. Sheff

    Sheff Resident of Nat Pres

    Registriert seit:
    21 April 2006
    Beiträge:
    8.429
    Zustimmungen:
    3.719
    Geschlecht:
    männlich
    Beruf:
    Retired Engineer & Heritage Volunteer
    Ort:
    N Warks
    Heritage Railway Volunteer:
    Yes I am an active volunteer
    View of firebox from FB post.

    Anyone care to compare the flexible stay provision vs previous iterations of Tornado’s boiler before I find the time?
    IMG_9803.jpeg
     
    Bluenosejohn und W.Williams gefällt dies.
  10. W.Williams

    W.Williams Well-Known Member

    Registriert seit:
    20 Dezember 2015
    Beiträge:
    1.695
    Zustimmungen:
    1.605
    Beruf:
    Mechanical Engineer
    Ort:
    Aberdeenshire
    Heritage Railway Volunteer:
    Yes I am an active volunteer
    Well, it looks good, and it has arrived, so thats also highly positive. This does mark a fundamental milestone in the project, but the machine itself must still be at least 2 years away from running, given the work outstanding. With that in mind, it seems prudent to this observer not to do anything that starts the boiler ticket rolling cycle.
     
    Bluenosejohn und Sheff gefällt dies.
  11. Sheff

    Sheff Resident of Nat Pres

    Registriert seit:
    21 April 2006
    Beiträge:
    8.429
    Zustimmungen:
    3.719
    Geschlecht:
    männlich
    Beruf:
    Retired Engineer & Heritage Volunteer
    Ort:
    N Warks
    Heritage Railway Volunteer:
    Yes I am an active volunteer
    I’ve just taken a first proper look at the firebox back head ….. unless my eyes are deceiving me, the stay pattern is asymmetrical?!
    From the firehole downwards there’s 5 flexible stays per row on the driver’s side and only 4 on the fireman’s side?
    Thoughts?
     
  12. Bikermike

    Bikermike Well-Known Member

    Registriert seit:
    11 März 2020
    Beiträge:
    2.089
    Zustimmungen:
    2.356
    Geschlecht:
    männlich
    Ort:
    Thameslink territory
    Heritage Railway Volunteer:
    No I do not currently volunteer
    [Edit]Ignore me, I can't count.
    (Anyone who has seen my models will know I can't count rivets...)
     
    Bluenosejohn und Sheff gefällt dies.
  13. ilvaporista

    ilvaporista Part of the furniture

    Registriert seit:
    16 Januar 2006
    Beiträge:
    4.418
    Zustimmungen:
    5.538
    Geschlecht:
    männlich
    Beruf:
    C.Eng
    Ort:
    On the 45th!
    Is this part of the changes needed for left handed firing, with the firehole door shifted to the right for extra space??
    I suspect the real reason, if drawn and approved that way, will be far less exciting and related to space constraints.
     
  14. guycarr360

    guycarr360 Part of the furniture

    Registriert seit:
    4 Oktober 2005
    Beiträge:
    5.195
    Zustimmungen:
    3.426
    Geschlecht:
    männlich
    Ort:
    Chester le Street County Durham
    Optimistic with 2 years, treble it, and you may be nearer the mark, the whole inside valve gear needs sorting, testing, then manufactured.
    IF, they fit the monobloc before completing its design, measuring, in a confined space become harder, i hope the download from David Elliott is concise in this area.
     
    Sheff gefällt dies.
  15. Jamessquared

    Jamessquared Nat Pres stalwart

    Registriert seit:
    8 März 2008
    Beiträge:
    28.877
    Zustimmungen:
    69.355
    Ort:
    LBSC 215
    Heritage Railway Volunteer:
    Yes I am an active volunteer
    I don't think the firehole door is off-centre. I've certainly never seen a loco like that, except a few examples that had two (side by side) firehole doors.

    Looking at the staying pattern, it looks to me that the door is central and there is the same pattern of stays (i.e. the same centre lines of each stay) on each side - it is just that the materials differ in one column. It would be interesting to know why, particularly if this is a new boiler rather than a refurbished old one.

    Tom
     
    Sheff gefällt dies.
  16. Bikermike

    Bikermike Well-Known Member

    Registriert seit:
    11 März 2020
    Beiträge:
    2.089
    Zustimmungen:
    2.356
    Geschlecht:
    männlich
    Ort:
    Thameslink territory
    Heritage Railway Volunteer:
    No I do not currently volunteer
    I think the fitting is asymmetric (it's wider on the side with a hinge), but the door is central. To my eye that conceals one vertical row (column) of stay heads, especially from this angle.
     
  17. ilvaporista

    ilvaporista Part of the furniture

    Registriert seit:
    16 Januar 2006
    Beiträge:
    4.418
    Zustimmungen:
    5.538
    Geschlecht:
    männlich
    Beruf:
    C.Eng
    Ort:
    On the 45th!
    The smiley didn't come up on the first paragraph. It was not meant seriously!
     
    Jamessquared gefällt dies.
  18. RAB3L

    RAB3L Member

    Registriert seit:
    4 Januar 2013
    Beiträge:
    582
    Zustimmungen:
    318
    Same number of stays on each side but one more flexible on the LHS?
     
  19. pmh_74

    pmh_74 Part of the furniture

    Registriert seit:
    28 Januar 2009
    Beiträge:
    2.587
    Zustimmungen:
    2.010
    There are five stays different on LHS vs RHS, around the lower half of the firehole door. Which are flexible is beyond my pay grade as a signalling engineer...
    Well, we knew there was some remedial work going on before it was delivered, so it's not entirely surprising.
     
  20. Sheff

    Sheff Resident of Nat Pres

    Registriert seit:
    21 April 2006
    Beiträge:
    8.429
    Zustimmungen:
    3.719
    Geschlecht:
    männlich
    Beruf:
    Retired Engineer & Heritage Volunteer
    Ort:
    N Warks
    Heritage Railway Volunteer:
    Yes I am an active volunteer
     

Die Seite empfehlen