If you register, you can do a lot more. And become an active part of our growing community. You'll have access to hidden forums, and enjoy the ability of replying and starting conversations.

GCR Black 5 No 45491

الموضوع في 'Steam Traction' بواسطة Flying Phil, بتاريخ ‏16 أوت 2021.

  1. 3855

    3855 Member

    إنضم إلينا في:
    ‏27 سبتمبر 2008
    المشاركات:
    633
    عدد المعجبين:
    483
    الجنس:
    ذكر
    مكان الإقامة:
    inside a boiler
    Heritage Railway Volunteer:
    Yes I am an active volunteer
    It's quite some feat to have completed the boiler and tested it , before fitting it in the frames for final assembly since the photo taken on the 1st March..............

    Suspect the placement of the boiler in the frames etc is more a tidying up exercise with the added bonus cladding and pipework can be finished...

    Happy to be proven wrong mind....
     
    silversteellady و Jamessquared معجبون بهذا.
  2. LMS2968

    LMS2968 Part of the furniture

    إنضم إلينا في:
    ‏1 سبتمبر 2006
    المشاركات:
    3,093
    عدد المعجبين:
    5,410
    الجنس:
    ذكر
    الوظيفة:
    Lecturer retired: Archivist of Stanier Mogul Fund
    مكان الإقامة:
    Wigan
    Heritage Railway Volunteer:
    Yes I am an active volunteer
    Not cladding until the hydraulic and steam tests are completed. although I notice in the photo that the firebox cladding has been added.
     
  3. Jamessquared

    Jamessquared Nat Pres stalwart

    إنضم إلينا في:
    ‏8 مارس 2008
    المشاركات:
    28,123
    عدد المعجبين:
    65,961
    مكان الإقامة:
    LBSC 215
    Heritage Railway Volunteer:
    Yes I am an active volunteer
    If you have done a lot of boiler work and / or mechanical work that might have caused things to move round a bit, it wouldn't seem unusual to me to reunite boiler and frames to check alignment and allow initial checking of cladding and pipework, before removing the boiler again for final assembly and testing.

    (Even something as small as if you have re-rivetted the lower firebox sides, will it still fit between the frames - not a given with a large boiler if the stay heads protrude a bit more than previously. The time to find that out isn't when the boiler ticket is ticking).

    It helps to have your own cranes, of course!

    Tom
     
  4. std tank

    std tank Part of the furniture

    إنضم إلينا في:
    ‏20 سبتمبر 2005
    المشاركات:
    3,943
    عدد المعجبين:
    1,076
    الجنس:
    ذكر
    الوظيفة:
    Retired
    مكان الإقامة:
    Liverpool
    Heritage Railway Volunteer:
    Yes I am an active volunteer
    45491 is ex-Barry and never steamed . This is new cladding being made and trial fitted.
     
  5. LMS2968

    LMS2968 Part of the furniture

    إنضم إلينا في:
    ‏1 سبتمبر 2006
    المشاركات:
    3,093
    عدد المعجبين:
    5,410
    الجنس:
    ذكر
    الوظيفة:
    Lecturer retired: Archivist of Stanier Mogul Fund
    مكان الإقامة:
    Wigan
    Heritage Railway Volunteer:
    Yes I am an active volunteer
    Yes, I know; it's how I'd do it too. The point being made was that the hydraulic test cannot be done with the cladding sheets in place. Having the tubes in helps too!
     
  6. pmh_74

    pmh_74 Part of the furniture

    إنضم إلينا في:
    ‏28 يناير 2009
    المشاركات:
    2,460
    عدد المعجبين:
    1,762
    I may be wrong, but I thought that the cladding had been largely completed a few years ago prior to the nearly-finished boiler having to have the newly-fitted tubes removed for unexpected tubeplate replacement (due to a paperwork issue with the previous tubeplate, if memory serves me correctly... must be immensely frustrating for all involved). That being so, once the tubeplate was in it could have all gone together relatively quickly, but like others above I suspect that it's untubed and will come off again. A first steam test in preservation is normally something to be shouted about, so I strongly suspect is still a while off.
     
  7. keith6233

    keith6233 Member

    إنضم إلينا في:
    ‏21 إبريل 2006
    المشاركات:
    609
    عدد المعجبين:
    187
    الوظيفة:
    Engineer
    مكان الإقامة:
    Manchester
    45491 Latest Steam railway magazine reports the owners have been given notice to remove it from the GCR.
     
  8. bristolian

    bristolian Member

    إنضم إلينا في:
    ‏25 جويلية 2005
    المشاركات:
    543
    عدد المعجبين:
    305
    الجنس:
    ذكر
    مكان الإقامة:
    Huntingdon. Formerly from Bristol.
    Heritage Railway Volunteer:
    No I do not currently volunteer
    :(
     
  9. Chris86

    Chris86 Well-Known Member

    إنضم إلينا في:
    ‏31 اكتوبر 2011
    المشاركات:
    1,633
    عدد المعجبين:
    1,877
    الوظيفة:
    Safety, technical and vehicle trainer
    مكان الإقامة:
    South Yorkshire
    Heritage Railway Volunteer:
    No I do not currently volunteer

    That's a shame, I have seen in a number of times in the shed at Loughborough over the years and was hoping to see it run there one day.

    I expect it will find a new home pretty quick, there's a few lines who I'm sure would love a freshly restored Black 5 which is near completion to add to their fleet.

    Chris
     
    Last edited: ‏16 جوان 2025
    GOEdwards و silversteellady معجبون بهذا.
  10. 60044

    60044 Member

    إنضم إلينا في:
    ‏24 فبراير 2016
    المشاركات:
    884
    عدد المعجبين:
    1,277
    الجنس:
    ذكر
    مكان الإقامة:
    Salisbury
    Heritage Railway Volunteer:
    Yes I am an active volunteer
    It'll be interesting to see where it ends up. I heard a rumour years ago that someone at the NYMR wanted a Black 5 but in the end he went another route. More recently there was another rumour that someone associated with the NYMR was considering buying 76079; whoever it was might be better thinking of this one (if it is for sale) as it mostly seems to need reassembly to get a working engine - might be a better buy, and Grosmont showed with 80136 and 92134 that they are very good at reassembling nearly finished engines.
     
  11. bristolian

    bristolian Member

    إنضم إلينا في:
    ‏25 جويلية 2005
    المشاركات:
    543
    عدد المعجبين:
    305
    الجنس:
    ذكر
    مكان الإقامة:
    Huntingdon. Formerly from Bristol.
    Heritage Railway Volunteer:
    No I do not currently volunteer
    Without any of us knowing the circumstances, it's a great shame. Black 5s are an intrinsic part of the latter days of the erstwhile GC main line. 45231 has left, and now 45491 has to leave. :(
     
    NBDR Lock و 3ABescot معجبون بهذا.
  12. chrishallam

    chrishallam Well-Known Member

    إنضم إلينا في:
    ‏25 مارس 2007
    المشاركات:
    1,045
    عدد المعجبين:
    385
    مكان الإقامة:
    Uk
    Heritage Railway Volunteer:
    Yes I am an active volunteer
    When the loco arrived at the GCR back in 2011, I recall the loco was 'close to returning to steam'... For the last 15 years it always seems to have been reported as around 18 months from steaming.

    I can understand, after all this time, it has been given it's marching orders to be honest...
     
  13. pmh_74

    pmh_74 Part of the furniture

    إنضم إلينا في:
    ‏28 يناير 2009
    المشاركات:
    2,460
    عدد المعجبين:
    1,762
    And yet we've been waiting far longer than that for 'Boscastle' which has been pending or under overhaul for 25 years now.
    On the face of it, 45491 is ideal for the GCR so it does seem strange, if what is reported is true.
     
    3ABescot, Johnme101 و silversteellady معجبون بهذا.
  14. 60044

    60044 Member

    إنضم إلينا في:
    ‏24 فبراير 2016
    المشاركات:
    884
    عدد المعجبين:
    1,277
    الجنس:
    ذكر
    مكان الإقامة:
    Salisbury
    Heritage Railway Volunteer:
    Yes I am an active volunteer
    Maybe it's a Trump-like negotiating position being adopted b the GCR management!
     
  15. Hicks19862

    Hicks19862 Member

    إنضم إلينا في:
    ‏6 اكتوبر 2015
    المشاركات:
    850
    عدد المعجبين:
    795
    الجنس:
    ذكر
    مكان الإقامة:
    Manchester
    Certainly seems one of those engines that has been close to steaming for over a decade. Can it really be that close to steaming if the GCR is evicting it?
     
  16. Bikermike

    Bikermike Well-Known Member

    إنضم إلينا في:
    ‏11 مارس 2020
    المشاركات:
    1,891
    عدد المعجبين:
    2,113
    الجنس:
    ذكر
    مكان الإقامة:
    Thameslink territory
    Heritage Railway Volunteer:
    No I do not currently volunteer
    On that basis, has someone been over-optimistically reporting for some time and the other party has got fed up/has something they want to do with that space?

    Given how useful a black 5 is, and how much facility[1] the GC has allowed them, that's quite the write-off.

    I wonder how definite that report is?

    [1] ie the intangible benefits of other teams being around for security, ad-hoc help, loan of tea/[whatever the railway equivalent of a 10mm spanner is], advice, stream of visitors past the collection tin etc.
     
    أعجب بهذه المشاركة Hicks19862
  17. Sidmouth

    Sidmouth Resident of Nat Pres Staff Member Moderator

    إنضم إلينا في:
    ‏12 سبتمبر 2005
    المشاركات:
    10,211
    عدد المعجبين:
    9,907
    الجنس:
    ذكر
    مكان الإقامة:
    Alderan !
    Heritage Railway Volunteer:
    Yes I am an active volunteer
    there maybe many reasons , if the SR report is correct and 45491 has been asked to leave much of which without facts becomes speculation
     
    أعجب بهذه المشاركة William Fletcher
  18. Flying Phil

    Flying Phil Part of the furniture

    إنضم إلينا في:
    ‏10 ديسمبر 2018
    المشاركات:
    3,054
    عدد المعجبين:
    6,492
    الجنس:
    ذكر
    مكان الإقامة:
    Leicestershire
    Heritage Railway Volunteer:
    Yes I am an active volunteer
    It was still in the shed at Loughborough today.
     
    Hicks19862, Johnme101 و silversteellady معجبون بهذا.

مشاركة هذه الصفحة