    From my visit in January, that was the status of the 1st of the 2 new boilers. so not much changed, its construction was being checked and signed off at various critical stages, by an independent engineer.
    No boiler has been delivered yet, as i would expect that to be all over the local news, they follow the build really well.
    If it does arrive, will let everyone know.
     
  2. class8mikado

    class8mikado Part of the furniture

    Pridružen(a):
    1. Lipanj 2009.
    Poruka:
    3,858
    Lajkova:
    1,656
    Interesi:
    Print Estimator/ Repository of Useless Informatio.
    Grad:
    Bingley W.Yorks.
    Heritage Railway Volunteer:
    No I do not currently volunteer
    And lets be honest, unless something untoward occurs with the boiler Tornado is carrying there is no massive rush other than the need for some publicity column inches.
    Wonder if they can get a UK boiler Inspector over there to look it over before it ships this time.!?
    Am i right in thinking that the superheater fitting will be done in the UK ? don't recall a superheater header being made as yet...
     
  3. Sheff

    Sheff Resident of Nat Pres

    Pridružen(a):
    21. Travanj 2006.
    Poruka:
    8,084
    Lajkova:
    3,148
    Spol:
    Muškarac
    Interesi:
    Retired Engineer & Heritage Volunteer
    Grad:
    N Warks
    Heritage Railway Volunteer:
    Yes I am an active volunteer
    Well if they’d got the cylinder block in then a boiler could come in useful. But as the whole project is now so far off course then there aren’t any current targets AFAIK?
     
  4. guycarr360

    guycarr360 Part of the furniture

    Pridružen(a):
    4. Listopad 2005.
    Poruka:
    4,875
    Lajkova:
    3,191
    Spol:
    Muškarac
    Grad:
    Chester le Street County Durham
    First they need a new cannon box casting to get the pony truck in, as that becomes a pain, from the comment on my visit.

    Maybe they are getting forced to accept it, (boiler No 2), as the failures and possible construction errors on the very 1st boiler are now rectified.
    Just a thought.
     
    Sheff se sviđa ovo.
  5. class8mikado

    class8mikado Part of the furniture

    Pridružen(a):
    1. Lipanj 2009.
    Poruka:
    3,858
    Lajkova:
    1,656
    Interesi:
    Print Estimator/ Repository of Useless Informatio.
    Grad:
    Bingley W.Yorks.
    Heritage Railway Volunteer:
    No I do not currently volunteer
    Of course, as soon as it is complete the makers will want out of the way and paid for.
     
  6. Steve

    Steve Resident of Nat Pres Friend

    Pridružen(a):
    7. Listopad 2006.
    Poruka:
    12,821
    Lajkova:
    12,020
    Interesi:
    Gentleman of leisure, nowadays
    Grad:
    Near Leeds
    Heritage Railway Volunteer:
    Yes I am an active volunteer
    A boiler inspector is going to be concerned with its suitability as a pressure vessel, not its dimensional accuracy.
     
  7. class8mikado

    class8mikado Part of the furniture

    Pridružen(a):
    1. Lipanj 2009.
    Poruka:
    3,858
    Lajkova:
    1,656
    Interesi:
    Print Estimator/ Repository of Useless Informatio.
    Grad:
    Bingley W.Yorks.
    Heritage Railway Volunteer:
    No I do not currently volunteer
    Indeed , so lets not have a re-tube this time ?
     
  8. W.Williams

    W.Williams Well-Known Member

    Pridružen(a):
    20. Prosinac 2015.
    Poruka:
    1,658
    Lajkova:
    1,572
    Interesi:
    Mechanical Engineer
    Grad:
    Aberdeenshire
    Heritage Railway Volunteer:
    Yes I am an active volunteer
    Indeed, but the recieving clinet will have a drawing that the boiler should comply to, and of course a dimensional report will be on hand demonstrating compliance.

    I presume.
     
    Steve and Sheff like this.

Podijelite ovu stranicu