Bridge that Gap: Great Central Railway News

الموضوع في 'Heritage Railways & Centres in the UK' بواسطة Gav106, بتاريخ ‏8 ماي 2010.

  1. MellishR

    MellishR Resident of Nat Pres Friend

    إنضم إلينا في:
    ‏16 إبريل 2009
    المشاركات:
    9,002
    عدد المعجبين:
    5,922
    I acknowledge the rationale for having two single tracks for some distance north of the junction with the curve to the Midland line; but might it be worth including a crossover near the junction for the sake of flexibility, for example to able to pass two GC trains there when nothing is going to or from the Midland line?
     
    أعجب بهذه المشاركة The Dainton Banker
  2. Musket The Dog

    Musket The Dog Member

    إنضم إلينا في:
    ‏5 يناير 2022
    المشاركات:
    200
    عدد المعجبين:
    465
    الجنس:
    ذكر
    الوظيفة:
    Mechanical Engineer
    مكان الإقامة:
    Leicestershire
    Heritage Railway Volunteer:
    Yes I am an active volunteer
    I had a scan through the video again, I couldn't spot (no audio) if the new plan is to have the two lines converge before or after the canal bridge now, but on face value if you write it off then becomes all the the more difficult to put back in the future when it is decided it is useful. Keeping the double line over the canal bridge might give you enough room to hold a train on the Loughborough side of the single line without it blocking the platform?
     
    أعجب بهذه المشاركة Wenlock
  3. ilvaporista

    ilvaporista Part of the furniture

    إنضم إلينا في:
    ‏16 يناير 2006
    المشاركات:
    4,356
    عدد المعجبين:
    5,456
    الجنس:
    ذكر
    الوظيفة:
    C.Eng
    مكان الإقامة:
    On the 45th!
    I understood that the convergence would be on the embankment after the canal bridge but before the concrete viaduct. Which would give a loop to hold a train. I may be mistaken, but that seems a logical solution.
     
  4. pmh_74

    pmh_74 Part of the furniture

    إنضم إلينا في:
    ‏28 يناير 2009
    المشاركات:
    2,443
    عدد المعجبين:
    1,749
    Yes, I believe that is the idea, to maximise operational flexibility (northbound train can clear the platform while still awaiting the single line; indeed if only one platform is available it might have to, to let the southbound in, otherwise the northbound could be sitting south of Loughborough for a long time if the southbound is late!)

    For what it's worth I agree with you... I think there is still a debate to be had about the precise track layout north of the MML spur. Different height off the new MML bridge compared with the old may account for some of this, though.
     
    أعجب بهذه المشاركة Musket The Dog
  5. martin1656

    martin1656 Nat Pres stalwart Friend

    إنضم إلينا في:
    ‏8 ديسمبر 2014
    المشاركات:
    19,433
    عدد المعجبين:
    12,629
    الجنس:
    ذكر
    مكان الإقامة:
    St Leonards
    Heritage Railway Volunteer:
    No I do not currently volunteer
    Having a long loop on the approach to the station makes sense, because it would enable a train to be held awaiting either a platform, or to head out over the viaduct, and enable either platform to be used. Or even to clear the road if you're running a demonstration freight , The design of viaduct looks like it could be precast in sections away from the site, and delivered to site and joined up, most of the sections, do look identical so the casting of each one could be done re using the same shuttering and formers, reducing the overall cost.
     
    pmh_74, acorb, Flying Phil و 1 شخص آخر معجبون بهذا.
  6. 49010

    49010 Well-Known Member

    إنضم إلينا في:
    ‏23 إبريل 2012
    المشاركات:
    1,243
    عدد المعجبين:
    1,039
    الجنس:
    ذكر
    الوظيفة:
    Gentleman of Leisure
    مكان الإقامة:
    Stockport
    Heritage Railway Volunteer:
    Yes I am an active volunteer
    Apologies if this has been answered elsewhere, what will happen to the engine shed at Loughborough? Will it be narrowed to allow the main line to go north past it, or be moved to another site, and if so, where will it go?
     
  7. Miff

    Miff Part of the furniture Friend

    إنضم إلينا في:
    ‏17 جوان 2008
    المشاركات:
    3,040
    عدد المعجبين:
    3,119
    It’s been announced it’ll be removed, but it’s not been announced when or where the replacement(s)‘ll be. P’haps a number of options’re under consideration. I reckon it’ll be a few years yet before it goes.
     
    Last edited: ‏28 إبريل 2024
    أعجب بهذه المشاركة 49010
  8. Chris86

    Chris86 Well-Known Member

    إنضم إلينا في:
    ‏31 اكتوبر 2011
    المشاركات:
    1,613
    عدد المعجبين:
    1,847
    الوظيفة:
    Safety, technical and vehicle trainer
    مكان الإقامة:
    South Yorkshire
    Heritage Railway Volunteer:
    No I do not currently volunteer
    Was working just outside Loughborough last week, I noted that both sides of the refurbished road bridge on the way to Cotes have already been struck by vehicles- never ceases to amaze me that folk don't know their height.

    Chris
     
  9. Mark_108

    Mark_108 New Member

    إنضم إلينا في:
    ‏10 مارس 2015
    المشاركات:
    42
    عدد المعجبين:
    19
    الجنس:
    ذكر
    الوظيفة:
    Senior Engineer - Offshore Design
    Heritage Railway Volunteer:
    Yes I am an active volunteer
    It used to average a strike about every 1-2 months, generally curtain siders which damage the paint but do nothing to the structure, I doubt its changed a great deal.

    Just a pain as you then need to get it inspected followed by the rigmarole of claiming the cost back from the insurer
     
    أعجب بهذه المشاركة Chris86
  10. Mark Thompson

    Mark Thompson Well-Known Member

    إنضم إلينا في:
    ‏10 سبتمبر 2017
    المشاركات:
    1,665
    عدد المعجبين:
    4,129
    الجنس:
    ذكر
    مكان الإقامة:
    E sussex
    Heritage Railway Volunteer:
    No I do not currently volunteer
    Is there any prospect for installing bash beams, like the GWSR have had done at Broadway?
     
  11. Musket The Dog

    Musket The Dog Member

    إنضم إلينا في:
    ‏5 يناير 2022
    المشاركات:
    200
    عدد المعجبين:
    465
    الجنس:
    ذكر
    الوظيفة:
    Mechanical Engineer
    مكان الإقامة:
    Leicestershire
    Heritage Railway Volunteer:
    Yes I am an active volunteer
    That is what has been done:

    https://www.gcrn.co.uk/node/71

    I suppose even once the beams have done their job of reshaping the offending vehicle, there is probably a lot of scraping of the under deck?
     
    Sheff, Chris86, Mark Thompson و 1 شخص آخر معجبون بهذا.
  12. Hando

    Hando New Member

    إنضم إلينا في:
    ‏20 أوت 2020
    المشاركات:
    34
    عدد المعجبين:
    30
    الجنس:
    ذكر
    مكان الإقامة:
    Cornwall (was Leicestershire)
    Heritage Railway Volunteer:
    Yes I am an active volunteer
    You are right Ricky, the new plan is to double over the Canal Bridge and then single onto the viaduct (from what I understood at least).
     
  13. Flying Phil

    Flying Phil Part of the furniture

    إنضم إلينا في:
    ‏10 ديسمبر 2018
    المشاركات:
    3,048
    عدد المعجبين:
    6,458
    الجنس:
    ذكر
    مكان الإقامة:
    Leicestershire
    Heritage Railway Volunteer:
    Yes I am an active volunteer
    As Hando says, there will be a short double track embankment (80m ish) from the canal bridge. This will go down to a single track over a short steel bridge over the Severn Trent Combined Sewer Outlet. This has to allow vehicle access beneath. Then it is along the long single track Urban viaduct, about 10 x 20m spans of concrete bridge decks. This then leads onto the bridge across the Railway Terrace, access road to the council tip site (which needs a 5.3m clearance height). There is then the section across the Preci-Spark car park and onto the MML bridge. There is then a short new embankment to be rebuilt to join the existing embankment with the Chord line to the MML. There will be twin tracks along to and over the A60 bridge and for about 400m, then they will go to a single track to Rushcliffe/East Leake and GCR(N).
    In the latest re unification video there is a more detailed explanation. In essence though, a new rebuilt embankment would need to be taller and thinner on a flood plane and so would have needed about 400 piles and be very carefully constructed....very expensive! The new design of urban viaduct requires about 200 piles and modular construction with less intrusion on the flood plane/wildlife/environment. Also there will be Continuously Welded Rail on the viaduct which will be quieter and have less vibration for the (Precision!) machining operations at Preci-Spark.
    It will be slightly cheaper and better in many respects so Win Win.
    There is then plenty of space to the North of Lbro station to have a full length train awaiting entry, when coming South. This will also require much less track/signalling alteration than having to put new track around the West of the shed.
    Obviously there is much discussion about the existing loco shed but I suspect a smaller shed might remain on the East side incorporating the existing machining workshop? A two road running shed might fit onto the West side a bit further North, up to the canal?
     
    The Dainton Banker, Hando, Johnme101 و 1 شخص آخر معجبون بهذا.
  14. pmh_74

    pmh_74 Part of the furniture

    إنضم إلينا في:
    ‏28 يناير 2009
    المشاركات:
    2,443
    عدد المعجبين:
    1,749
    Got to disagree with you there Phil. When Loughborough was remodelled in the late 90s leading up to the double track commissioning, the 'box was re-locked and a lot of the locking was 'designed in' for what then looked like a single track scheme northwards. Changing it to double track up to just north of the canal, although clearly a much better idea, will mean rather more work for the S&T. I'll also be surprised if any of the pointwork north of Loughborough ends up in the same place - the crossover north of the platforms might, but it has been a constant source of trouble for many years so I suspect the temptation to relay will be too strong. The hand-worked points are going to be in the middle of the main line, so that's no good. There are also two loco shed pits to fill in when the shed moves (and new ones to dig out, wherever). Quite a lot to think about, really.
    I'd suggest that any shed which ends up on the east side will be storage only, since it will be the wrong side of the running lines for any meaningful road access. It would be a nice place for a DMU shed. :)
     
    أعجب بهذه المشاركة Hando
  15. Flying Phil

    Flying Phil Part of the furniture

    إنضم إلينا في:
    ‏10 ديسمبر 2018
    المشاركات:
    3,048
    عدد المعجبين:
    6,458
    الجنس:
    ذكر
    مكان الإقامة:
    Leicestershire
    Heritage Railway Volunteer:
    Yes I am an active volunteer
    As ever I am grateful for a more detailed and reasoned reply, whatever happens, we are in for an even greater Great Central!
    I'm sure many people are spending many many hours looking at alternatives and implications. Many more people are making contributions, large and small, to make sure it happens.
     
    أعجب بهذه المشاركة The Dainton Banker
  16. J Rob't Harrison

    J Rob't Harrison Member

    إنضم إلينا في:
    ‏6 نوفمبر 2016
    المشاركات:
    242
    عدد المعجبين:
    371
    الجنس:
    ذكر
    مكان الإقامة:
    Stafford
    Heritage Railway Volunteer:
    No I do not currently volunteer
    Another rather nicely-produced glossy pamphlet arrived in the mail today. I'm seriously considering re-starting my standing order now that the project management has undergone a transformation and the emphasis has shifted firmly back to the 18-mile heritage railway outcome.
     
    Flying Phil, 35B, brmp201 و 2 آخرون معجبون بهذا.
  17. brmp201

    brmp201 Member

    إنضم إلينا في:
    ‏18 ماي 2010
    المشاركات:
    619
    عدد المعجبين:
    969
    الجنس:
    ذكر
    الوظيفة:
    IT Director
    مكان الإقامة:
    Surrey, UK
    Heritage Railway Volunteer:
    No I do not currently volunteer
    Hot off the press - planning application submitted:

     
    DavidW, Flying Phil, Johnme101 و 4 آخرون معجبون بهذا.
  18. J Rob't Harrison

    J Rob't Harrison Member

    إنضم إلينا في:
    ‏6 نوفمبر 2016
    المشاركات:
    242
    عدد المعجبين:
    371
    الجنس:
    ذكر
    مكان الإقامة:
    Stafford
    Heritage Railway Volunteer:
    No I do not currently volunteer
    I'm enjoying seeing the planning and management processes that go into Reunification getting some publicity of late. All of the background 'stuff' that needs to be sorted out before the orange army and their tonka toys come out to play, is where the project is made or broken.
     
    Flying Phil و pmh_74 معجبون بهذا.
  19. Flying Phil

    Flying Phil Part of the furniture

    إنضم إلينا في:
    ‏10 ديسمبر 2018
    المشاركات:
    3,048
    عدد المعجبين:
    6,458
    الجنس:
    ذكر
    مكان الإقامة:
    Leicestershire
    Heritage Railway Volunteer:
    Yes I am an active volunteer
    I am really impressed that the GCR is sticking closely to the timescale that was outlined some time ago. Obviously, it is based upon fundraising rate, so a huge "Thank You" to those who are supporting this project - world wide!
     
    أعجب بهذه المشاركة J Rob't Harrison
  20. Johann Marsbar

    Johann Marsbar Well-Known Member

    إنضم إلينا في:
    ‏21 فبراير 2016
    المشاركات:
    1,671
    عدد المعجبين:
    2,192
    الجنس:
    ذكر
    مكان الإقامة:
    Suffolk
    Heritage Railway Volunteer:
    No I do not currently volunteer
    Will be interesting to see what is said about Reunification at tomorrows GCR AGM.
     
    Hando, Gav106 و J Rob't Harrison معجبون بهذا.