If you register, you can do a lot more. And become an active part of our growing community. You'll have access to hidden forums, and enjoy the ability of replying and starting conversations.

Churnet Valley Railway General Discussion

الموضوع في 'Heritage Railways & Centres in the UK' بواسطة Sheff, بتاريخ ‏6 ديسمبر 2013.

  1. lil Bear

    lil Bear Part of the furniture

    إنضم إلينا في:
    ‏11 ديسمبر 2006
    المشاركات:
    6,136
    عدد المعجبين:
    1,701
    الجنس:
    ذكر
    الوظيفة:
    Railway Technician
    مكان الإقامة:
    8C / 5D / 27C / 71B
    Heritage Railway Volunteer:
    Yes I am an active volunteer
    Some Crompton action this June, with 33s operating 3/4, 11, 25. July tbc.
    https://www.churnetvalleyrailway.co.uk/news/coal-prices-and-availability
     
  2. Martin Adalar

    Martin Adalar New Member

    إنضم إلينا في:
    ‏2 ماي 2018
    المشاركات:
    193
    عدد المعجبين:
    69
    الجنس:
    ذكر
    مكان الإقامة:
    5D
    Heritage Railway Volunteer:
    No I do not currently volunteer
    Are there any plans to restore Tamworth Castle back to working order? I would have thought that would be a quick restoration because it is all complete.
     
  3. Martin Adalar

    Martin Adalar New Member

    إنضم إلينا في:
    ‏2 ماي 2018
    المشاركات:
    193
    عدد المعجبين:
    69
    الجنس:
    ذكر
    مكان الإقامة:
    5D
    Heritage Railway Volunteer:
    No I do not currently volunteer
    Had a look at the new track they are laying on the extension and i notice they are laying the sleepers right on the edge of the embankment slope in what would once have been the cess when there is acres of space on the 6' side. I really think they should have somebody supervising the work that knows something about pway and track work, as soon as they try to build a ballast shoulder all the stone is going to fall down the bank. Do they not know what a cess is?
     

    الملفات المرفقة:

    • IMG_2647.jpeg
      IMG_2647.jpeg
      حجم الملف:
      7.2 ميغا
      المشاهدات:
      180
  4. D7076

    D7076 Well-Known Member

    إنضم إلينا في:
    ‏21 ديسمبر 2007
    المشاركات:
    1,563
    عدد المعجبين:
    722
    BRCW tin rot ..just paint over the holes and it’s complete ?
     
    أعجب بهذه المشاركة lil Bear
  5. Matt37401

    Matt37401 Nat Pres stalwart

    إنضم إلينا في:
    ‏8 جوان 2014
    المشاركات:
    15,561
    عدد المعجبين:
    11,980
    مكان الإقامة:
    Wnxx
    Heritage Railway Volunteer:
    No I do not currently volunteer
    But 25912 was built at Derby :confused:
    (Just knowing how quick you are to correct others in matters like these :))
     
    Last edited: ‏20 جوان 2022
  6. lil Bear

    lil Bear Part of the furniture

    إنضم إلينا في:
    ‏11 ديسمبر 2006
    المشاركات:
    6,136
    عدد المعجبين:
    1,701
    الجنس:
    ذكر
    الوظيفة:
    Railway Technician
    مكان الإقامة:
    8C / 5D / 27C / 71B
    Heritage Railway Volunteer:
    Yes I am an active volunteer
    Complete, apart from the much publicised visit of the copper fairies around 2012(?). It's on the list, but as D8057 is already in bits and there only being about half a dozen volunteers (most of whom have other duties around the railway, plus a home life) there is only so much they can achieve. Once the 20 is sorted then I suspect TC will come to the fore.
    Thanks for the (lack of) support (once more). Whilst there you'll have seen the permissive path that has been installed, which never was there originally. This crosses over the chord, and to improve sighting the new chord has been built wider than original to cater for the such. All work done as per the PWI designs - as mentioned previously. If you have such an issue with their standards, I'm sure they'll be receptive to your better judgement.
     
    Ash-SOT, SID125, brmp201 و 1 شخص آخر معجبون بهذا.
  7. Martin Adalar

    Martin Adalar New Member

    إنضم إلينا في:
    ‏2 ماي 2018
    المشاركات:
    193
    عدد المعجبين:
    69
    الجنس:
    ذكر
    مكان الإقامة:
    5D
    Heritage Railway Volunteer:
    No I do not currently volunteer
    I was not referring to the chord, i was talking about the double trackbed south of where the points are going to go, there is acres and acres of space and yet they have put the ends of the sleepers right up to the top of the embankment slope - this is total stupidity. Since you mention the chord itself: trains will in all probability ability be doing no more than 10 or 15mph approaching that foot crossing which will in any event have the obligatory whistle boards set well back leaving nobody in any doubt there is a train coming and yet the new line is being laid well away from the original double track formation in a very deep trench - see photo below. There IMG_2648 2.jpeg is no way the person in charge of that work has any pway knowledge.
     
  8. Sidmouth

    Sidmouth Resident of Nat Pres Staff Member Moderator

    إنضم إلينا في:
    ‏12 سبتمبر 2005
    المشاركات:
    10,204
    عدد المعجبين:
    9,894
    الجنس:
    ذكر
    مكان الإقامة:
    Alderan !
    Heritage Railway Volunteer:
    Yes I am an active volunteer
    I'm curious as to your motives @Martin Adalar as the posts smack of a rather large dose of sour grapes and also your experience and qualifications to make such judgments

    I'm also curious as to whether you are trespassing on an active construction site to secure the images and have taken the liberty of ensuring the CVR have copies of the posts so should they wish to bring any action they have evidence before you delete it
     
    ghost, staffordian, lil Bear و 4 آخرون معجبون بهذا.
  9. 49010

    49010 Well-Known Member

    إنضم إلينا في:
    ‏23 إبريل 2012
    المشاركات:
    1,243
    عدد المعجبين:
    1,039
    الجنس:
    ذكر
    الوظيفة:
    Gentleman of Leisure
    مكان الإقامة:
    Stockport
    Heritage Railway Volunteer:
    Yes I am an active volunteer
    I'd also like to know a bit more about the qualifications and experience of Mr Adalar, if that is indeed his name. I wonder if this might be the third coming of someone with the intials MA, aka Clog and Knocker.

    On the other hand, I can honestly say that if he is such an expert in PWay matters then he would be most welcome to join the PWay gang at CVR.
     
    lil Bear, marshall5, Andy Moody و 3 آخرون معجبون بهذا.
  10. Martin Adalar

    Martin Adalar New Member

    إنضم إلينا في:
    ‏2 ماي 2018
    المشاركات:
    193
    عدد المعجبين:
    69
    الجنس:
    ذكر
    مكان الإقامة:
    5D
    Heritage Railway Volunteer:
    No I do not currently volunteer
    In case you hadn’t noticed, the brand new public footpath crosses this worksite you mention. I have no sour grapes and indeed I support the short extension to Barnfields but I will call out poor work whenever I see it; this seems be a problem for you as you do not want to listen to any constructive criticism.
     
  11. 35B

    35B Nat Pres stalwart

    إنضم إلينا في:
    ‏18 جوان 2011
    المشاركات:
    29,391
    عدد المعجبين:
    29,916
    الجنس:
    ذكر
    مكان الإقامة:
    Grantham
    Heritage Railway Volunteer:
    No I do not currently volunteer
    The balance of your comments undermines the credibility of that statement.
     
    lil Bear, 49010, Poolbrook و 2 آخرون معجبون بهذا.
  12. Martin Adalar

    Martin Adalar New Member

    إنضم إلينا في:
    ‏2 ماي 2018
    المشاركات:
    193
    عدد المعجبين:
    69
    الجنس:
    ذكر
    مكان الإقامة:
    5D
    Heritage Railway Volunteer:
    No I do not currently volunteer
    If i was against the project then believe me i would say so; i do not understand this suggestion that i have sour grapes. Can you explain why you think i should have such an attitude?
     
  13. 35B

    35B Nat Pres stalwart

    إنضم إلينا في:
    ‏18 جوان 2011
    المشاركات:
    29,391
    عدد المعجبين:
    29,916
    الجنس:
    ذكر
    مكان الإقامة:
    Grantham
    Heritage Railway Volunteer:
    No I do not currently volunteer
    No. But I judge by the posts I read.


    Sent from my iPhone using Tapatalk
     
    أعجب بهذه المشاركة 49010
  14. MellishR

    MellishR Resident of Nat Pres Friend

    إنضم إلينا في:
    ‏16 إبريل 2009
    المشاركات:
    9,038
    عدد المعجبين:
    5,946
    Can we please stop arguing about Mr A's motives and instead can someone from the CVR please respond to the substance of his assertion that the track is poorly positioned? Is it closer to the edge of the embankment than might be expected, and if so why is that OK?
     
    3ABescot, MattA و 35B معجبون بهذا.
  15. Steve B

    Steve B Well-Known Member

    إنضم إلينا في:
    ‏20 جوان 2008
    المشاركات:
    2,170
    عدد المعجبين:
    1,580
    مكان الإقامة:
    Shropshire
    And possibly as well, are those sleepers actually in their final position? It's easy to jump to the wrong conclusions if something is still a work in progress...
    For myself, I generally work on the basis that the people working on a line such as the CVR actually have a plan and know what they're doing, and look forward to the finished article.

    Steve B
     
    3ABescot, ghost, staffordian و 14 آخرون معجبون بهذا.
  16. lil Bear

    lil Bear Part of the furniture

    إنضم إلينا في:
    ‏11 ديسمبر 2006
    المشاركات:
    6,136
    عدد المعجبين:
    1,701
    الجنس:
    ذكر
    الوظيفة:
    Railway Technician
    مكان الإقامة:
    8C / 5D / 27C / 71B
    Heritage Railway Volunteer:
    Yes I am an active volunteer
    There is no public footpath being created - a permissive path has been made and will be available to use once it is formally completed (prior to the completion of the track, as per the planning authority). I’d say it’s wise to read up on the difference.

    Sleepers are being positioned in accordance to the pipeline that runs underneath the former trackbed, though as yet they have not formally been installed in their final position (that I’m aware of). This will be done once the rails are onsite, of which atm I haven’t seen a date for.

    Keep on wibbling, it entertains during lunch break.
     
    Ash-SOT, 3ABescot, Sheff و 8 آخرون معجبون بهذا.
  17. NeilL

    NeilL Well-Known Member

    إنضم إلينا في:
    ‏30 مارس 2012
    المشاركات:
    2,062
    عدد المعجبين:
    1,558
    الوظيفة:
    Retired & OAPWay & tree feller
    مكان الإقامة:
    Staffordshire
    Heritage Railway Volunteer:
    Yes I am an active volunteer
    Avoiding the sewer pipe under the former track makes perfect sense. It would be handy to have a point where the toilet tanks could be emptied direct
     
    Sheff و 49010 معجبون بهذا.
  18. Sheff

    Sheff Resident of Nat Pres

    إنضم إلينا في:
    ‏21 إبريل 2006
    المشاركات:
    8,112
    عدد المعجبين:
    3,192
    الجنس:
    ذكر
    الوظيفة:
    Retired Engineer & Heritage Volunteer
    مكان الإقامة:
    N Warks
    Heritage Railway Volunteer:
    Yes I am an active volunteer
    …… sort of the opposite to a tender scoop …..


    Sent from my iPad using Tapatalk
     
    أعجب بهذه المشاركة 49010
  19. NeilL

    NeilL Well-Known Member

    إنضم إلينا في:
    ‏30 مارس 2012
    المشاركات:
    2,062
    عدد المعجبين:
    1,558
    الوظيفة:
    Retired & OAPWay & tree feller
    مكان الإقامة:
    Staffordshire
    Heritage Railway Volunteer:
    Yes I am an active volunteer
    Exactly but without the problems of getting an overflow if the scoop was left down too long.
     
    أعجب بهذه المشاركة 49010
  20. Vulcan Works

    Vulcan Works Member

    إنضم إلينا في:
    ‏12 إبريل 2018
    المشاركات:
    266
    عدد المعجبين:
    746
    الجنس:
    ذكر
    مكان الإقامة:
    England
    Heritage Railway Volunteer:
    No I do not currently volunteer
    The Severn Trent sewer will have an easement under the Water Industry Act of a minimum of 3m either side of the centre line of the pipe (the exact width depends on the sewer diameter). Any works on or near the sewer will be subject to agreement with the water company. Diverting the sewer would have probably cost a six figure sum, so moving the track over is sensible!
     

مشاركة هذه الصفحة