If you register, you can do a lot more. And become an active part of our growing community. You'll have access to hidden forums, and enjoy the ability of replying and starting conversations.

East Lancs Railway

本贴由 forty2016-10-23 发布. 版块名称: Heritage Railways & Centres in the UK

  1. 3ABescot

    3ABescot Member

    注册日期:
    2019-06-14
    帖子:
    435
    支持:
    847
    所在地:
    Herefordshire
    Heritage Railway Volunteer:
    No I do not currently volunteer
    Booking now available:
    https://www.eastlancsrailway.org.uk/events-activities/ly-centenary-weekend/
    The LNWR Coal Tank is to join the 3 L&YR locos. Looks like a great event!
    Perhaps someone will add a thread to the Galas & Events list? I couldn't see it there or do it.
     
    已获得Johnme101, Bluenosejohn, YorkyLad另外1人的支持.
  2. MellishR

    MellishR Resident of Nat Pres Friend

    注册日期:
    2009-04-16
    帖子:
    9,021
    支持:
    5,938
    On the Swanage thread
    Indeed not much to do with the Swanage, but it seems to deserve discussion here.

    (Also on the Swanage thread)
    The most obvious incompatibility would be one that has been cited for the (even less realistic) notion of a public transport service on the WSR; who mans the signal boxes? It did all work in the old days with company A having running powers over company B's line, but those were both normal commercial operations. Is there any way it could work on the ELR?
     
  3. 3ABescot

    3ABescot Member

    注册日期:
    2019-06-14
    帖子:
    435
    支持:
    847
    所在地:
    Herefordshire
    Heritage Railway Volunteer:
    No I do not currently volunteer
    Thanks, very relevant - and welcome surely?
    It seems to me to be highly desirable for preserved lines to be used for public services too, in spite of all the bureaucratic and financial obstacles that have been put in the way of public transport over the years.
    It must surely be more economic to have dual use: main lines do have traditional signalling and preserved lines do have modern signalling.
    Much greater obstacles get pushed aside for vast new contraversial engineering projects for both road and rail.
     
    已获得oliversbest的支持.
  4. Wagoniester

    Wagoniester Member

    注册日期:
    2017-11-30
    帖子:
    701
    支持:
    1,510
    性别:
    所在地:
    Essex
    Heritage Railway Volunteer:
    Yes I am an active volunteer
    已获得Johnme101的支持.
  5. 3ABescot

    3ABescot Member

    注册日期:
    2019-06-14
    帖子:
    435
    支持:
    847
    所在地:
    Herefordshire
    Heritage Railway Volunteer:
    No I do not currently volunteer
    Thanks.
    Good to see buses and lorries are still there too. From the reports on RailAdvent, I get the impression the traction engines were the main losers, hope they have found suitable new homes
     
  6. Matt37401

    Matt37401 Nat Pres stalwart

    注册日期:
    2014-06-08
    帖子:
    15,555
    支持:
    11,962
    所在地:
    Wnxx
    Heritage Railway Volunteer:
    No I do not currently volunteer
    I have to disagree with you, as an example off the top of my head every now and again someone suggests a commuter service between Bewdley and Kidderminster/Stourbridge etc, how on earth would that work with things like regular SVR services and not just necessarily passenger services? Throw in lack of car parking at Bewdley compared to Kidderminster/Stourbridge Jcn/ Rowley Regis how would you make it work? You say there’s way’s round the obstacles in the way and there are but it’s at the cost of heritage operations.
    I’m using the SVR as an example because it’s a railway I’m quite familiar with.
    For example Would you want to be the person to explain to members and shareholders who have funded the restoration and building of Kidderminster and Bewdley South box why they are no longer in use because they’re now part of the panel at Saltley?
    You can have either a Heritage Railway run and staffed by a mixture of paid staff and Volunteers or a mainline Railway with very few paid staff and a basic railway, I really don’t think the two are compatible with each other.
     
    已获得pmh_74, Copper-capped, YorkyLad另外7人的支持.
  7. 3ABescot

    3ABescot Member

    注册日期:
    2019-06-14
    帖子:
    435
    支持:
    847
    所在地:
    Herefordshire
    Heritage Railway Volunteer:
    No I do not currently volunteer
    I'm familiar with the SVR and Bewdley in particular too and I agree there would be problems there but that's not relevant here! But other lines often have a very minor midweek service and there would be gaps both in car parks and in the service pattern.
    You also assumed the heritage railway would have to find the staff which seems implausible.
    This initiative to use existing lines for more than petiodic heritage trains seems to me to be sensible in principle but clearly needs careful examination on a case by case (ie location by location) basis.
    I don't think this positive government initiative should be dismissed by on a rail forum by sweeping generalizations.
     
    已获得oliversbest的支持.
  8. DismalChips

    DismalChips Member

    注册日期:
    2016-04-11
    帖子:
    689
    支持:
    720
    所在地:
    9A
    Heritage Railway Volunteer:
    No I do not currently volunteer
    Possibly the difference as far as the ELR is concerned is that the services aren't actually running onto the mainline - the proposal is that they run to a new Metrolink stop at Buckley Wells and passengers then transfer to the tram, which runs them into Manchester.
     
  9. 5944

    5944 Resident of Nat Pres

    注册日期:
    2006-01-14
    帖子:
    9,007
    支持:
    9,535
    性别:
    职业:
    Train Maintainer for GTR at Hornsey
    所在地:
    Letchworth
    Heritage Railway Volunteer:
    No I do not currently volunteer
    ELR has four signal boxes that would need to be manned. You can't be relying on volunteers for a daily service like that.

    https://www.elrps.co.uk/signalling-department

    They would have to be two-shift to allow a decent service to run, so that would be another 10 or so signallers just for weekday services (allowing for shift patterns, sickness, training, etc.). Plus there's Baron Street crossing at Buckley Wells to be factored in. Close it, rebuild it or upgrade it? Bridge perhaps?

    Reduction in car journeys between one and three million? That's roughly 3-9000 journeys a day, every day. Assuming that most of those journeys are returns, they're talking of hundreds, if not thousands of people using public transport. There's no way a few tram trains are going to entice those sort of numbers, especially when they've then got to change on to a tram at Buckley Wells.
     
    已获得BluenosejohnJamessquaredMatt37401的支持.
  10. black5

    black5 Well-Known Member

    注册日期:
    2006-04-01
    帖子:
    2,076
    支持:
    2,995
    职业:
    Theatre
    所在地:
    Merseyside>Bury
    Heritage Railway Volunteer:
    Yes I am an active volunteer

    GWR 5643 at the Lancs/Greater Manchester border this afternoon
     
  11. Matt37401

    Matt37401 Nat Pres stalwart

    注册日期:
    2014-06-08
    帖子:
    15,555
    支持:
    11,962
    所在地:
    Wnxx
    Heritage Railway Volunteer:
    No I do not currently volunteer
    There’s a reason the big railway got rid of its manual signal boxes! :)
     
  12. D7076

    D7076 Well-Known Member

    注册日期:
    2007-12-21
    帖子:
    1,560
    支持:
    720
    Statfold
     
    已获得Bluenosejohn3ABescot的支持.
  13. 3855

    3855 Member

    注册日期:
    2008-09-27
    帖子:
    633
    支持:
    483
    性别:
    所在地:
    inside a boiler
    Heritage Railway Volunteer:
    Yes I am an active volunteer
    52322 out tomorrow instead of 5643
     
    已获得Joanne Crompton的支持.
  14. Bikermike

    Bikermike Well-Known Member

    注册日期:
    2020-03-11
    帖子:
    1,863
    支持:
    2,090
    性别:
    所在地:
    Thameslink territory
    Heritage Railway Volunteer:
    No I do not currently volunteer
    The big problems as I see it are based around the fact you can't switch one out for the other
    You can't have 2 sets of signalling, so it's either Mackenzie and holland or the current colour light/Ertms/whatever. For the former you need a huge number of staff (not just signallers, but maintenance as well), the latter just isn't heritage.
    Then there's stations, can you imagine leaving a heritage station unlocked unsupervised for the late evening trains? And there being any heritage left the next day?
    You can run modern trains on a heritage railway and (to an extent vice versa), but you can't overlay a public service railway on a heritage line.

    You could manage an arrangement where the tracks were shared, but only outside stations, and even then, the signalling would be odd (and any modern systems would limit the pool of engines that could come in).
     
    已获得Matt37401的支持.
  15. 3ABescot

    3ABescot Member

    注册日期:
    2019-06-14
    帖子:
    435
    支持:
    847
    所在地:
    Herefordshire
    Heritage Railway Volunteer:
    No I do not currently volunteer
     
  16. 3ABescot

    3ABescot Member

    注册日期:
    2019-06-14
    帖子:
    435
    支持:
    847
    所在地:
    Herefordshire
    Heritage Railway Volunteer:
    No I do not currently volunteer
    This subject really needs its own thread. There's much more to say on the ELR about events, the goods shed and current ops.l
    But just to reply to the previous message, you can leave the station buldings locked and signal sections cleared out of use and run the line as a basic railway when only service trains are running. When both run, the infrastructure is open anyway.
    If these initiatives are dismissed lightly and in principle, government and local authorities will just think "preservationists just want to play trains, leave them to it" and an opportunity to get a regular public support will be lost.
    The real problems I think concern the bureaucratic, unbusinesslike way national railways are run. I suggest Modern Railways magazine, esp. the columns by Alan Williams and Roger Ford or Adrian Shooter's recent book on Chiltern Railways.
     
    已获得oliversbest的支持.
  17. black5

    black5 Well-Known Member

    注册日期:
    2006-04-01
    帖子:
    2,076
    支持:
    2,995
    职业:
    Theatre
    所在地:
    Merseyside>Bury
    Heritage Railway Volunteer:
    Yes I am an active volunteer
    That would only work with a complete redesign (and in my personal opinion a downgrading) of the signalling systems and interlocking. Bury to Ramsbottom has no physical token, it works under the Direction Lever Track Curcuit method, while Ramsbottom to Rawtenstall works under One Train Working system with a physical token (the plan is to eventually work Ramsbottom to Rawtenstall also under DLTC). There are also three level crossings operated by signalmen, which would require staffing or 'upgrading' to automatic barriers/loss of heritage, which particularly at Ramsbottom which is more historically significant with its gate operated by wheel and town centre location.
     
    Last edited: 2022-05-14
  18. Matt37401

    Matt37401 Nat Pres stalwart

    注册日期:
    2014-06-08
    帖子:
    15,555
    支持:
    11,962
    所在地:
    Wnxx
    Heritage Railway Volunteer:
    No I do not currently volunteer
    If you want a heritage railway to become part of the national network it’s going to be very labour intensive, as you say it’s not insurmountable, but where’s the money coming from to pay those wages?
    Staff costs are not cheap.
     
  19. alexl102

    alexl102 Member Friend

    注册日期:
    2019-03-01
    帖子:
    661
    支持:
    520
    性别:
    所在地:
    Leeds
    Heritage Railway Volunteer:
    No I do not currently volunteer
    The ELR Gala website says that Coal Tank 1054 will be involved. Anyone know if that's still happening?
     
  20. 3ABescot

    3ABescot Member

    注册日期:
    2019-06-14
    帖子:
    435
    支持:
    847
    所在地:
    Herefordshire
    Heritage Railway Volunteer:
    No I do not currently volunteer
    The initiative is from Government and local government.
     
    已获得oliversbest的支持.

分享此页面