Peak Rail Annual Report and Action Group

الموضوع في 'Heritage Railways & Centres in the UK' بواسطة huochemi, بتاريخ ‏11 أوت 2017.

  1. Martin Perry

    Martin Perry Nat Pres stalwart Staff Member Moderator Friend

    إنضم إلينا في:
    ‏15 إبريل 2006
    المشاركات:
    16,552
    عدد المعجبين:
    7,905
    مكان الإقامة:
    1012 / 60158
    Heritage Railway Volunteer:
    Yes I am an active volunteer
    Also not a bridge engineer but it looks like it was there to spread horizontal forces on the columns; quite important given the prevailing flooding etc.
     
  2. Steve

    Steve Resident of Nat Pres Friend

    إنضم إلينا في:
    ‏7 اكتوبر 2006
    المشاركات:
    12,822
    عدد المعجبين:
    12,020
    الوظيفة:
    Gentleman of leisure, nowadays
    مكان الإقامة:
    Near Leeds
    Heritage Railway Volunteer:
    Yes I am an active volunteer
    Like John & Al, I'm no bridge engineer but, looking at the way they are attached to the columns by clamp rings, they look to be later additions and not part of the original structure. I wonder why the attachments on the right hand column (as viewed) have failed. Corrosion, perhaps?
     
  3. northernsteam

    northernsteam Member

    إنضم إلينا في:
    ‏25 ماي 2010
    المشاركات:
    609
    عدد المعجبين:
    297
    الجنس:
    ذكر
    الوظيفة:
    Used to be in civil engineering, highway bridges.
    مكان الإقامة:
    Tyne and Wear
    Heritage Railway Volunteer:
    No I do not currently volunteer
    In my past experience of floods in Northumberland, with bridges over water the important bits are hidden in the water. It costs money to bring in qualified diving surveyors to check them out and then can cost large money to do any repairs required. Then you can turn to the above water level. Bracing could have been brought down by debris bashing it on the way through, a tree at full belt can cause a lot of damage to a weakened structure.
     
  4. Martin Perry

    Martin Perry Nat Pres stalwart Staff Member Moderator Friend

    إنضم إلينا في:
    ‏15 إبريل 2006
    المشاركات:
    16,552
    عدد المعجبين:
    7,905
    مكان الإقامة:
    1012 / 60158
    Heritage Railway Volunteer:
    Yes I am an active volunteer
    We used this team;

    https://dsace.co.uk/

    To survey and manage repairs to the Dee Bridge at Pentrefelin (Llangollen Railway) back when I was still involved.

    Seemed to do a decent job, Severn Valley used them too.
     
  5. RichardBrum

    RichardBrum Member

    إنضم إلينا في:
    ‏16 إبريل 2019
    المشاركات:
    262
    عدد المعجبين:
    335
    الجنس:
    ذكر
    مكان الإقامة:
    Birmingham
    Heritage Railway Volunteer:
    No I do not currently volunteer
    Because the bridge is a slew bridge, the bracing isn't at a right-angle to the flow, & anything being carried downstream is going to hit into the bracing. The flow will also be greater in the middle, & that column is further into the river than the one to it's left.
    So that end of the bracing is more likely to get hit, & at a greater force.

    The attachments also look like they are simply clamped around the columns & not actually attached to them.
     
  6. Breva

    Breva Well-Known Member

    إنضم إلينا في:
    ‏11 اكتوبر 2010
    المشاركات:
    2,382
    عدد المعجبين:
    4,163
    مكان الإقامة:
    Gloucestershire
    Heritage Railway Volunteer:
    Yes I am an active volunteer
    If you were prudent, and knowing of the damage the flood just caused, you would examine the foundations of the piers now.
     
    northernsteam, jnc و Andy Williams معجبون بهذا.
  7. Thompson1706

    Thompson1706 Part of the furniture

    إنضم إلينا في:
    ‏19 نوفمبر 2007
    المشاركات:
    2,531
    عدد المعجبين:
    1,907
    الجنس:
    ذكر
    الوظيفة:
    Retired
    مكان الإقامة:
    Rhiwabon
    Heritage Railway Volunteer:
    Yes I am an active volunteer
    Working over rivers can be very expensive as all work done has to be approved by the rivers authority. Things such as removing possibly lead- based paint which can pollute the river are very expensive. Definitely needs a professional survey. The bracing isn't for decorative purposes.

    Bob.
     
    أعجب بهذه المشاركة jnc
  8. Dunfanaghy Road

    Dunfanaghy Road Well-Known Member

    إنضم إلينا في:
    ‏9 اكتوبر 2019
    المشاركات:
    1,421
    عدد المعجبين:
    1,818
    الجنس:
    ذكر
    الوظيفة:
    Retired
    مكان الإقامة:
    Alton, Hants
    Heritage Railway Volunteer:
    Yes I am an active volunteer
    Is this the bridge whose piers rise from concrete columns cased in old loco tyres? Last time I was up that way (when PR were at Buxton!) on of the then PR people told me it was worth a look.
    Pat
     
  9. northernsteam

    northernsteam Member

    إنضم إلينا في:
    ‏25 ماي 2010
    المشاركات:
    609
    عدد المعجبين:
    297
    الجنس:
    ذكر
    الوظيفة:
    Used to be in civil engineering, highway bridges.
    مكان الإقامة:
    Tyne and Wear
    Heritage Railway Volunteer:
    No I do not currently volunteer
    Hope that is done before the next floods come down!
     
  10. jnc

    jnc Well-Known Member

    إنضم إلينا في:
    ‏3 إبريل 2012
    المشاركات:
    1,511
    عدد المعجبين:
    2,709
    الجنس:
    ذكر
    مكان الإقامة:
    Western Atlantic
    Heritage Railway Volunteer:
    No I do not currently volunteer
    Somewhat off-topic, but this was the thread that alerted me to Mr Briddon's site, and I'm not sure there is a thread here dedicated to his site...

    Thought I'd point out a notable recent post there: Tenth Anniversary Edition. Congratulations!

    Noel
     
    mdewell, Bluenosejohn, Miff و 3 آخرون معجبون بهذا.
  11. crantock

    crantock Member

    إنضم إلينا في:
    ‏22 نوفمبر 2008
    المشاركات:
    528
    عدد المعجبين:
    276
    الجنس:
    ذكر
    الوظيفة:
    Beancounter
    مكان الإقامة:
    Birmingham
    Heritage Railway Volunteer:
    No I do not currently volunteer
    The Waterman Debenture is an interesting development. It presumably ranks behind the co-op.

    I could almost see it as a good thing if PW took control. However, given the number of £1 shares he would only ever be a minority with de facto control. Still, control is probably there to be taken for £50k given the dispersed sharehholdings.

    PW is still neither a Director nor person with significant control......at least officially.


    Sent from my iPhone using Tapatalk
     
  12. flying scotsman123

    flying scotsman123 Resident of Nat Pres

    إنضم إلينا في:
    ‏9 سبتمبر 2013
    المشاركات:
    10,708
    عدد المعجبين:
    18,815
    الجنس:
    ذكر
    مكان الإقامة:
    Cheltenham
    Heritage Railway Volunteer:
    Yes I am an active volunteer
    He was (is?) president of the GWSR. His approach was, shall we say, very much hands-off! :) So I wouldn't hold out much hope of him getting involved one way or another.
     
    أعجب بهذه المشاركة Dunfanaghy Road
  13. Vulcan Works

    Vulcan Works Member

    إنضم إلينا في:
    ‏12 إبريل 2018
    المشاركات:
    266
    عدد المعجبين:
    746
    الجنس:
    ذكر
    مكان الإقامة:
    England
    Heritage Railway Volunteer:
    No I do not currently volunteer
    PW has been a very hands off President at Peak Rail too although curiously his presence and financial contribution(s) have probably deflected attention away from the Board’s antics. His role has never actually been explained but having a big name involved undoubtedly appeals to some shareholders, I think some were naively thinking he was the key to revitalising PR. PR isn’t a natural home for him or his locos but the majority of passengers are not going to be too bothered about what steam loco is pulling their train!
     
  14. daveb

    daveb Member

    إنضم إلينا في:
    ‏5 سبتمبر 2005
    المشاركات:
    945
    عدد المعجبين:
    484
    الجنس:
    ذكر
    مكان الإقامة:
    Wimborne, Dorset
    Heritage Railway Volunteer:
    No I do not currently volunteer
    According to the website, he still is.
     
  15. gwilialan

    gwilialan Well-Known Member

    إنضم إلينا في:
    ‏8 ديسمبر 2012
    المشاركات:
    1,716
    عدد المعجبين:
    4,012
    الجنس:
    ذكر
    مكان الإقامة:
    Out there somewhere
    Heritage Railway Volunteer:
    Yes I am an active volunteer
    nine elms fan, The Dainton Banker و Sunnieboy معجبون بهذا.
  16. MellishR

    MellishR Resident of Nat Pres Friend

    إنضم إلينا في:
    ‏16 إبريل 2009
    المشاركات:
    9,002
    عدد المعجبين:
    5,922
    I am surprised by the statement that "the Trust is a small charity, not eligible for gift aid". I am a trustee of a charity which regularly claims gift aid and has income of a similar order to that quoted for Peak Rail (and expenditure roughly equal to income).
     
  17. Miff

    Miff Part of the furniture Friend

    إنضم إلينا في:
    ‏17 جوان 2008
    المشاركات:
    3,040
    عدد المعجبين:
    3,119
    Is the PRAG defunct?
     
    أعجب بهذه المشاركة jnc
  18. PRAG

    PRAG New Member

    إنضم إلينا في:
    ‏16 إبريل 2018
    المشاركات:
    11
    عدد المعجبين:
    73
    مكان الإقامة:
    Peak Rail Action Group HQ
    Heritage Railway Volunteer:
    Yes I am an active volunteer
    PRAG is by no means defunct: we have been biding our time knowing that sooner or later the truth would come out. However, having been the target of considerable unfounded and defammatory criticism from the Peak Rail Board, Pete Briddon has taken a back seat but we have learned much from that confrontation. PRAG was already preparing a fresh statement to go out supporters, but put it on hold and the events of the last few days proved right to do so. It is likely we will revise that statement in the near future.

    At a Peak Rail AGM a year or two ago Director Paul Tomlinson spoke at considerable length explaining all their failed attempts to get the railway extended and if recalled correctly described the "Quarry Consortium" as the 'last roll of the dice'. Yet there is no mention of the Quarry Consortium in the latest PR Directors reports: on the contrary, it only describes 'Peak Rail's plans' to complete the line and be a 'diversionary route' for quarry traffic. Astute readers will deduce that no quarry company is going to contribute millions of pounds for what will just be an emergency back door. PRAG's view is that the Quarry Consortium is dead, perhaps another victim of Covid, and the 'last roll of the dice' has been and gone, but the Board will no doubt conveniently forget what it said.

    Accompanying the accounts was an appeal letter: our slogan was "Let's get Peak Rail back on track" - we see the PR appeal is headed "Getting Peak Rail back on Track" - which about sums up the limit of Board's ability to produce anything new.

    As regards MellishR's remark in the preceeding post, I believe he is refering to the observations made on Pete Briddon's blog: those were drawn directly from the Charities Commission website and relate to Pete Waterman's Trust. Peak Rail - the operating company - is a public limited company and as such is 'profit making'. The supporters group - the Peak Railway Association Ltd - is a company limited by guarantee and originally drawn up with the intention to become a charity at a later date, but this has never happened. Therefore neither of these Peak Rail bodies can claim Gift Aid: why the Waterman Trust cannot I am not qualified to say.

    RF
     
    Fish Plate و Miff معجبون بهذا.
  19. ghost

    ghost Part of the furniture

    إنضم إلينا في:
    ‏29 ماي 2006
    المشاركات:
    4,341
    عدد المعجبين:
    5,850
    الجنس:
    ذكر
    مكان الإقامة:
    N.Ireland
    Heritage Railway Volunteer:
    Yes I am an active volunteer
    If PR was to be reformed, what would the PRAG see as the future of the line? Modest extension - to where? Full blown reinstatement to Buxton? What would the priorities be of a reformed railway?
    If you feel that you'd rather not answer at this stage that's no problem, just curious.

    Keith
     
  20. PRAG

    PRAG New Member

    إنضم إلينا في:
    ‏16 إبريل 2018
    المشاركات:
    11
    عدد المعجبين:
    73
    مكان الإقامة:
    Peak Rail Action Group HQ
    Heritage Railway Volunteer:
    Yes I am an active volunteer
    If it is one thing the present Peak Rail Board is guilty of, it is of gazing in the direction of some nirvana while failing to get the railway it has got on a sound financial footing; where both public and volunteers return in growing numbers. Until that is achieved, pronouncements about going north are as good as "Let them eat cake".

    There was a plan, entitled "Vision", which was released on Pete Briddon's blog some time ago, but even that would require re-thinking in the light of the situation the railway is in now.

    (I haven't cleared this with other members of PRAG but I am sure they would agree.)

    RF
     
    Sunnieboy, Fish Plate, ghost و 1 شخص آخر معجبون بهذا.