East-West Rail Link clearance work gets underway

Discussie in 'On Track.' gestart door dace83, 21 jan 2009.

  1. dace83

    dace83 Well-Known Member

    Lid geworden:
    7 mei 2007
    Berichten:
    2.095
    Leuk Bevonden:
    4
    http://www.transportbriefing.co.uk/story.php?id=5472


    Around 20 kilometres of disused railway line between Bletchley and Claydon Junction stations in Buckinghamshire will be cleared of scrub, brambles and overgrown vegetation so that survey and investigation work can be carried out for the design development phase of the East-West Rail project.

    Starting on 26 January, the clearance will take two to three weeks and some will be done with manual equipment, although the more densely overgrown areas will need to be cleared with chainsaws and tractor mounted flails. All of the waste materials will be left chipped and spread on the site.
     
  2. Pewsey Beaste

    Pewsey Beaste Part of the furniture

    Lid geworden:
    8 sep 2005
    Berichten:
    4.247
    Leuk Bevonden:
    0
    Beroep:
    Computery stuff
    Locatie:
    Pewsey - in the pub...

Deel Deze Pagina