If you register, you can do a lot more. And become an active part of our growing community. You'll have access to hidden forums, and enjoy the ability of replying and starting conversations.

Bridge that Gap: Great Central Railway News

Discussie in 'Heritage Railways & Centres in the UK' gestart door Gav106, 8 mei 2010.

  1. MellishR

    MellishR Resident of Nat Pres Friend

    Lid geworden:
    16 apr 2009
    Berichten:
    9.036
    Leuk Bevonden:
    5.946
    I'm disappointed to see one of the engineers taking a photograph with a tablet instead of a proper camera. Yes, I know it does the job, but not so well.
     
  2. Jamessquared

    Jamessquared Nat Pres stalwart

    Lid geworden:
    8 mrt 2008
    Berichten:
    28.110
    Leuk Bevonden:
    65.920
    Locatie:
    LBSC 215
    Heritage Railway Volunteer:
    Yes I am an active volunteer
    If it is in focus and suitable resolution, what's the problem?

    Thinking about the logistics of the work from the engineers point of view. Having a device from which you can take a photo and then save it directly, time- and geo-stamped, in whatever record keeping application you are using to control the work seems a lot better than taking a photo in a separate "proper camera", then having to remove the card, find a card reader, upload the photos etc, presumably back at the office and with a risk that you no longer remember precisely what each photo shows.

    Ultimately, they are taking a record of the work done, not trying to win the National Geographic travel photography award.

    Tom
     
    Last edited: 25 nov 2019
    alastair, andie.shaw1341, big.stu en 10 anderen vinden dit leuk.
  3. Enterprise

    Enterprise Part of the furniture

    Lid geworden:
    9 sep 2005
    Berichten:
    5.502
    Leuk Bevonden:
    3.332
    Modern DSLRs and compacts come with GPS, and Bluetooth and WiFi connectivity. Apps such as SnapBridge or CameraConnect allow almost instant transfer. The only possible disadvantage I can see is perhaps lugging extra kit.
     
    MellishR vindt dit leuk.
  4. Nick C

    Nick C Well-Known Member

    Lid geworden:
    5 jul 2018
    Berichten:
    1.573
    Leuk Bevonden:
    1.831
    Geslacht:
    Man
    Locatie:
    Hampshire
    Heritage Railway Volunteer:
    Yes I am an active volunteer
    The plumber who services our boiler does exactly that - the photos get saved directly into the application they use to record each job, and can be annotated there and then.

    One thing I don't understand from the video, perhaps someone can enlighten me - why are they painting the bridge, and then fixing the rust holes? I'd have thought they would have done so while it was still bare metal, and thus easier to weld?
     
  5. AndyY

    AndyY Member

    Lid geworden:
    23 feb 2013
    Berichten:
    433
    Leuk Bevonden:
    480
    I guess it is painted straight away because freshly blasted metal starts to rust immediately, especially in a damp atmosphere this time of year over water.
     
    Bluenosejohn, jnc en Nick C vinden dit leuk.
  6. ilvaporista

    ilvaporista Part of the furniture

    Lid geworden:
    16 jan 2006
    Berichten:
    4.356
    Leuk Bevonden:
    5.456
    Geslacht:
    Man
    Beroep:
    C.Eng
    Locatie:
    On the 45th!
    As someone 'at the sharp end' of on-site inspections having one device is far easier than two and you also assume that bean counters will sanction the extra cost. By the time the approval process for buying an extra bit of kit went through the camera technology/resolution on my phone was as good as the camera I was directed to buy.

    Not in this case but actually getting on site can be a pain if you have to declare and have inspected every piece of kit. Many a happy hour spent cross checking my toolbox at entry and exit against the paperwork.
     
    Bluenosejohn, jnc, weltrol en 1 andere persoon vinden dit leuk.
  7. mikechant

    mikechant Member

    Lid geworden:
    24 okt 2012
    Berichten:
    236
    Leuk Bevonden:
    254
    On a tablet you can see a *large* real-time image of a otherwise visually inaccessible area, which will help you decide what pictures to take. Seems very well suited to this kind of job.
     
    jnc vindt dit leuk.
  8. burmister

    burmister Member

    Lid geworden:
    2 aug 2008
    Berichten:
    284
    Leuk Bevonden:
    292
    I suspect I am not the only one to be adding record photos to their VMI and Unplanned Work Sheets. I started off using an I pad but my phone now produces equal quality records and can get into more restricted spaces. For someone who started off with slide rules, log and steam tables with records made with type writers with ink type ribbons and carbon copy paper (remember the mess they made) that's quite an advance in 50 years.
    Brian
     
  9. Enterprise

    Enterprise Part of the furniture

    Lid geworden:
    9 sep 2005
    Berichten:
    5.502
    Leuk Bevonden:
    3.332
    I follow the logic of the posts above. In my days as a young engineer, I drove the van with my boss smoking his pipe and reading the Times. Once on site, without any access checks of course, the boss would take off his brogues, put on his wellies and amble off. I would gather all the kit and try to catch up. At location, he would dictate notes and I might have to sketch a few things and measure up, without dropping anything in the muck. Sounds a bit easier today although I wouldn't like all the paperwork.
     
  10. gwalkeriow

    gwalkeriow Well-Known Member

    Lid geworden:
    17 aug 2009
    Berichten:
    1.717
    Leuk Bevonden:
    1.746
    Geslacht:
    Man
    Beroep:
    Retired.
    Heritage Railway Volunteer:
    No I do not currently volunteer
    The overhaul and maintenance records at Havenstreet have been backed up and enhanced by the use of photos for a good few years now, very much easier to do when the main sever gives you access to all written documents and the photos. Photos are taken with a mixture of phones and cameras. The Engineering instructions also benefit from the inclusion of photos.
     
    Nick C vindt dit leuk.
  11. ilvaporista

    ilvaporista Part of the furniture

    Lid geworden:
    16 jan 2006
    Berichten:
    4.356
    Leuk Bevonden:
    5.456
    Geslacht:
    Man
    Beroep:
    C.Eng
    Locatie:
    On the 45th!
    The days of cost cutting have hit hard... The boss can't afford to have an assistant, has to use his safety shoes as day wear and travels to far off sites stuffed in to seats designed for transporting sparrows. Of course you have to give instant feedback, resolve the problem and calm the customer down whilst dreaming of the luxury MacDonalds you will eat on the way back home as nothing else is open that time of night... I love an easy life...
     
    Enterprise, jnc en echap vinden dit leuk.
  12. MellishR

    MellishR Resident of Nat Pres Friend

    Lid geworden:
    16 apr 2009
    Berichten:
    9.036
    Leuk Bevonden:
    5.946
    Adding to the comments above: I'm not saying that a tablet is unsuitable, but a proper camera is much easier to hold and point in the right direction, and zooming to frame exactly what is of interest is surely easier with ring on the lens than with a touch screen. But this is an instance of two tests of a good engineer: a) knowing the right tool for the job, and b) still being able to get the job done if the right tool isn't available.

    Anyway that's more than enough thread drift prompted by my rant. Let's agree to differ.

    Meanwhile I am of course pleased to see the rapid progress on the canal bridge.
     
    gwalkeriow vindt dit leuk.
  13. Chris86

    Chris86 Well-Known Member

    Lid geworden:
    31 okt 2011
    Berichten:
    1.632
    Leuk Bevonden:
    1.877
    Beroep:
    Safety, technical and vehicle trainer
    Locatie:
    South Yorkshire
    Heritage Railway Volunteer:
    No I do not currently volunteer
    I had the misfortune of spending somentime working as a Hydrometric Engineer.

    The move over to either toughbooks or Tablets with cameras for field work was definitely a welcome step for us- saved considerable time in the field and in the office being able to take and immediately highlight/annotate photographs whilst on site.

    Chris
     
    mogulb vindt dit leuk.
  14. Flying Phil

    Flying Phil Part of the furniture

    Lid geworden:
    10 dec 2018
    Berichten:
    3.054
    Leuk Bevonden:
    6.491
    Geslacht:
    Man
    Locatie:
    Leicestershire
    Heritage Railway Volunteer:
    Yes I am an active volunteer
    Work is still on going on the Canal Bridge, there was no sign of the "Lattice" sections yet though.
    Picture taken with a camera though..... DSCF7343.JPG
     
    Johnme101, J Rob't Harrison en jnc vinden dit leuk.
  15. Davo

    Davo Well-Known Member

    Lid geworden:
    12 okt 2018
    Berichten:
    1.557
    Leuk Bevonden:
    675
    Geslacht:
    Man
    Locatie:
    W yorkshire 56f
    Heritage Railway Volunteer:
    No I do not currently volunteer
    Are the lattice sections the metal ornate criss cross barriers that are riveted on the sides of the up and down bridge decks phil?
     
  16. desperado

    desperado Member

    Lid geworden:
    12 dec 2006
    Berichten:
    217
    Leuk Bevonden:
    91
    Locatie:
    Brussels
    Goldie, Johnme101, Davo en 1 andere persoon vinden dit leuk.
  17. Flying Phil

    Flying Phil Part of the furniture

    Lid geworden:
    10 dec 2018
    Berichten:
    3.054
    Leuk Bevonden:
    6.491
    Geslacht:
    Man
    Locatie:
    Leicestershire
    Heritage Railway Volunteer:
    Yes I am an active volunteer
    Thanks for that picture Desperado, it shows those "Lattice" sections very well. They had been removed and sent to a firm in South Wales to be refurbished.
     
    jnc en desperado vinden dit leuk.
  18. Flying Phil

    Flying Phil Part of the furniture

    Lid geworden:
    10 dec 2018
    Berichten:
    3.054
    Leuk Bevonden:
    6.491
    Geslacht:
    Man
    Locatie:
    Leicestershire
    Heritage Railway Volunteer:
    Yes I am an active volunteer
    The Canal Bridge has been uncovered completely now and is in its new coat of paint. I expect the "lattice" sections will be put back in place in the New Year. DSCF7452.JPG
     
  19. mikechant

    mikechant Member

    Lid geworden:
    24 okt 2012
    Berichten:
    236
    Leuk Bevonden:
    254
    Excellent it's great to see the results of a donation. I'll take a look when I visit for the post-Xmas running days.
     
  20. Flying Phil

    Flying Phil Part of the furniture

    Lid geworden:
    10 dec 2018
    Berichten:
    3.054
    Leuk Bevonden:
    6.491
    Geslacht:
    Man
    Locatie:
    Leicestershire
    Heritage Railway Volunteer:
    Yes I am an active volunteer
    Well done on donating Mike. I've suggested that, when the lattice girders are back and the bridge is finished, they lay 50m of temporary track, do a shed shunt and get a steam locomotive through the engine shed and posed over the canal to kickstart the next section fundraiser.......:D
     

Deel Deze Pagina