If you register, you can do a lot more. And become an active part of our growing community. You'll have access to hidden forums, and enjoy the ability of replying and starting conversations.

LMS 45036 Inspection Saloon

Rasprava u 'Heritage Rolling Stock' pokrenuta od nick813, 17. Studeni 2013..

  1. Reading General

    Reading General Part of the furniture

    Pridružen(a):
    18. Svibanj 2011.
    Poruka:
    6,081
    Lajkova:
    2,217
    that seems to me to be the best and easiest solution
     
  2. stuartreeder

    stuartreeder Member

    Pridružen(a):
    4. Siječanj 2012.
    Poruka:
    227
    Lajkova:
    14
    Spol:
    Muškarac
    Heritage Railway Volunteer:
    No I do not currently volunteer
    Who owns it and could you see what they want for it

    And the same with the shower block one aswell please.
     
  3. stuartreeder

    stuartreeder Member

    Pridružen(a):
    4. Siječanj 2012.
    Poruka:
    227
    Lajkova:
    14
    Spol:
    Muškarac
    Heritage Railway Volunteer:
    No I do not currently volunteer
    I'm not planning on giving up on this project anytime in the next 20 to 40 years.
     
  4. 61624

    61624 Part of the furniture

    Pridružen(a):
    27. Rujan 2006.
    Poruka:
    5,294
    Lajkova:
    3,599
    Heritage Railway Volunteer:
    Yes I am an active volunteer
    That's just as well. It took the LNERCA around 15 years to complete its first coach and it came more or less complete - although we then threw most of the interior away. If you don't even start with a body it will take that much longer - although on the other hand it will make restoration of the underframe that much easier because access will be better. I'd do that first and then make a decision on the body.
     
  5. stuartreeder

    stuartreeder Member

    Pridružen(a):
    4. Siječanj 2012.
    Poruka:
    227
    Lajkova:
    14
    Spol:
    Muškarac
    Heritage Railway Volunteer:
    No I do not currently volunteer
    That's the plan overhaul chassis to full operation condition then if the railway need a wagon to move stuff around the site it's available and then work out what to do with the body.
     
  6. ghost

    ghost Part of the furniture

    Pridružen(a):
    29. Svibanj 2006.
    Poruka:
    4,342
    Lajkova:
    5,853
    Spol:
    Muškarac
    Grad:
    N.Ireland
    Heritage Railway Volunteer:
    Yes I am an active volunteer
    Just to drag this thread out of the cobwebs. Stuart has now swapped the underframe of 45036 for LMS sleeper 617 (yes the one at the Swindon & Cricklade that's apparently full of asbestos).
    I give it 6 months.

    Keith
     
  7. weltrol

    weltrol Part of the furniture Friend

    Pridružen(a):
    29. Prosinac 2008.
    Poruka:
    2,844
    Lajkova:
    688
    I'd give it a couple of weeks and Alf Roberts will be involved....;)
     
    Matt37401, Bluenosejohn i ghost se sviđa ovo.
  8. marshall5

    marshall5 Part of the furniture

    Pridružen(a):
    26. Listopad 2010.
    Poruka:
    2,532
    Lajkova:
    4,422
    Grad:
    i.o.m
    Heritage Railway Volunteer:
    Yes I am an active volunteer
    The old saying about frying pans and fires come to mind.
    Ray.
     
    ghost se sviđa ovo.
  9. chrishallam

    chrishallam Well-Known Member

    Pridružen(a):
    25. Ožujak 2007.
    Poruka:
    1,043
    Lajkova:
    382
    Grad:
    Uk
    Heritage Railway Volunteer:
    Yes I am an active volunteer
    What are the regulations about moving vehicles with this level of asbestos? I was under the impression that it would have to be professionally removed or at the very least sealed, prior to any of the haulage companies touching it?
     
  10. ghost

    ghost Part of the furniture

    Pridružen(a):
    29. Svibanj 2006.
    Poruka:
    4,342
    Lajkova:
    5,853
    Spol:
    Muškarac
    Grad:
    N.Ireland
    Heritage Railway Volunteer:
    Yes I am an active volunteer
    I thought so too, although I couldn't say what the regs actually are.

    Sorry to say that Stuart is approaching this in the same manner as his other 'projects' ie not listening unless you say it's great. Unfortunately his naivity and unwillingness to ask for and accept advice could very well end up costing him his life when we're talking about an asbestos contaminated vehicle.

    Keith
     
  11. howard

    howard Member

    Pridružen(a):
    28. Srpanj 2006.
    Poruka:
    306
    Lajkova:
    270
    Spol:
    Muškarac
    Interesi:
    Retired Ship's Engineer
    Grad:
    Sandwich Kent
    Heritage Railway Volunteer:
    No I do not currently volunteer
    Possibly the lives of those round him too. Not a few people have died having inhaled the odd asbestos fibre. My friend’s mother had asbestosis, probably caused when washing his father’s boilersuits.
     
  12. Sidmouth

    Sidmouth Resident of Nat Pres Staff Member Moderator

    Pridružen(a):
    12. Rujan 2005.
    Poruka:
    10,182
    Lajkova:
    9,847
    Spol:
    Muškarac
    Grad:
    Alderan !
    Heritage Railway Volunteer:
    Yes I am an active volunteer
  13. Pete Thornhill

    Pete Thornhill Resident of Nat Pres Staff Member Administrator Moderator Friend

    Pridružen(a):
    24. Srpanj 2008.
    Poruka:
    7,838
    Lajkova:
    6,082
    Starting with asbestos removal if he intends to restore it.
     
  14. GWR Man.

    GWR Man. Well-Known Member

    Pridružen(a):
    8. Listopad 2014.
    Poruka:
    2,269
    Lajkova:
    2,758
    Spol:
    Muškarac
    Grad:
    Taunton
    Heritage Railway Volunteer:
    Yes I am an active volunteer
  15. stuartreeder

    stuartreeder Member

    Pridružen(a):
    4. Siječanj 2012.
    Poruka:
    227
    Lajkova:
    14
    Spol:
    Muškarac
    Heritage Railway Volunteer:
    No I do not currently volunteer
    Going to replace all missing windows first so it's watertight then move onto asbestos

     
  16. Hurricane

    Hurricane Member

    Pridružen(a):
    1. Studeni 2013.
    Poruka:
    823
    Lajkova:
    307
    Spol:
    Muškarac
    Grad:
    71A
    Heritage Railway Volunteer:
    Yes I am an active volunteer
    In the construction industry (probably the place that deals with Asbestos the most) the sequence is to remove the asbestos before you do any other works. So in this case the correct work flow is to do the asbestos removal first, or else you risk exposing those installing the windows! If you have a need to make it water tight then that should be done from the outside with plastic sheeting etc.
     
    Last edited: 28. Rujan 2018.
    35B and Bluenosejohn like this.
  17. 5944

    5944 Resident of Nat Pres

    Pridružen(a):
    14. Siječanj 2006.
    Poruka:
    9,000
    Lajkova:
    9,531
    Spol:
    Muškarac
    Interesi:
    Train Maintainer for GTR at Hornsey
    Grad:
    Letchworth
    Heritage Railway Volunteer:
    No I do not currently volunteer
    Had two downpipes replaced a couple of weeks ago, both made from asbestos cement. A mere £600 for removal and disposal! I dread to think what a coach would cost to gut.
     
  18. Fireline

    Fireline Well-Known Member

    Pridružen(a):
    11. Veljača 2008.
    Poruka:
    1,327
    Lajkova:
    1,420
    Spol:
    Muškarac
    Heritage Railway Volunteer:
    Yes I am an active volunteer
    I think something got missed off the list there. First, make watertight. Second, start JustGiving appeal....
     
  19. Pete Thornhill

    Pete Thornhill Resident of Nat Pres Staff Member Administrator Moderator Friend

    Pridružen(a):
    24. Srpanj 2008.
    Poruka:
    7,838
    Lajkova:
    6,082
    Yes agreed already his first failure. I think that Stuart really needs to think about what he is doing rather than making rash comments which show he doesn't appreciate the significance of the presence of the asbestos.
     
  20. Hurricane

    Hurricane Member

    Pridružen(a):
    1. Studeni 2013.
    Poruka:
    823
    Lajkova:
    307
    Spol:
    Muškarac
    Grad:
    71A
    Heritage Railway Volunteer:
    Yes I am an active volunteer
    Agree! Asbestos really is a silent threat that we all need to take much more seriously; just look that the following link as a reminder of how easy it is to get exposed and end up paying the ultimate price.

    https://www.thetimes.co.uk/article/woman-killed-by-asbestos-years-after-gap-year-project-0stl25qvr
     
    Christopher125, oddsocks i paulhitch se sviđa ovo.

Podijelite ovu stranicu