    The "Gap" website has now been updated to say that it is only a few days until the main bridge sections are lifted into place, and "more details are to follow.."
     
    أعجب بهذه المشاركة jnc
  2. ilvaporista

    ilvaporista Part of the furniture

    إنضم إلينا في:
    ‏16 يناير 2006
    المشاركات:
    4,356
    عدد المعجبين:
    5,456
    الجنس:
    ذكر
    الوظيفة:
    C.Eng
    مكان الإقامة:
    On the 45th!
    Have the bridge beams arrived at the site ready for the lift?
     
  3. Johann Marsbar

    Johann Marsbar Well-Known Member

    إنضم إلينا في:
    ‏21 فبراير 2016
    المشاركات:
    1,671
    عدد المعجبين:
    2,192
    الجنس:
    ذكر
    مكان الإقامة:
    Suffolk
    Heritage Railway Volunteer:
    No I do not currently volunteer
    One hopes so, as they have now posted full details on the Gap website of what is taking place, together with viewing information.
    Network Rail MML possession is 00.30-07.00 Sunday for any insomniacs interested.....
     
    أعجب بهذه المشاركة ilvaporista
  4. AndyY

    AndyY Member

    إنضم إلينا في:
    ‏23 فبراير 2013
    المشاركات:
    433
    عدد المعجبين:
    480
    On Facebook it says "I have been informed by Moores that the Bridge sections will be loaded Saturday morning are being transported by road via the A47 then round by the bypass to Loughbrough Sat morning and should be on site by midday.They also said that the Deck was not due to be with the Girders".

    My interpretation of the info so far is that the two side girders of the bridge will be lifted in this weekend, and then steel deck installed over the next couple of weeks. Will this still need the big crane?

    Andy
     
    Black Jim و jnc معجبون بهذا.
  5. David R

    David R Well-Known Member

    إنضم إلينا في:
    ‏30 جويلية 2013
    المشاركات:
    1,020
    عدد المعجبين:
    1,391
    الجنس:
    ذكر
    مكان الإقامة:
    Surrey
    Heritage Railway Volunteer:
    Yes I am an active volunteer
    Silly Question time - are they side girders? The website refers to them being box girder sections - don't these normally sit under the deck?

    David R
     
  6. AndyY

    AndyY Member

    إنضم إلينا في:
    ‏23 فبراير 2013
    المشاركات:
    433
    عدد المعجبين:
    480
    I may well be using the wrong term and making a bridge-designer wince - bridge beams, side girders, box girders?
    I seem to recollect a cross-section in the GCR magazine showing a trapezoidal-section box either side with the deck linking the bottom so the boxes effectively form 'walls' either side of the track. But of course the final design might be different!
     
    أعجب بهذه المشاركة David R
  7. mogulb

    mogulb New Member

    إنضم إلينا في:
    ‏20 ديسمبر 2010
    المشاركات:
    133
    عدد المعجبين:
    95
    AndyY. You are spot on that is what is being installed. (Not sure of the correct technical terminology though.)

    Logically the large crane will disappear fairly swiftly and considerably smaller cranes used to install the remaining components over the coming weeks.
     
  8. AndyY

    AndyY Member

    إنضم إلينا في:
    ‏23 فبراير 2013
    المشاركات:
    433
    عدد المعجبين:
    480
    I've been wondering whether the big crane will still be needed to reach far enough, but if the deck will take a fortnight to install it would be expensive to keep the big one. I'm assuming installing the deck will also have to be done during overnight possessions of the Midland line below.
     
  9. mogulb

    mogulb New Member

    إنضم إلينا في:
    ‏20 ديسمبر 2010
    المشاركات:
    133
    عدد المعجبين:
    95
    All the remaining components will be small and fairly light compared to the main beams, so can be craned in from both sides, a one ton lift at say 25m radius would not require a huge crane. If the big crane stays I would assume they would attempt to install everything else in one possession, unlikely to happen unless the contractors have a very extra special deal with Baldwins or the crane is not needed elsewhere. Mostly conjecture but We should know by Monday/ Tuesday . Hope this helps a bit.
     
  10. AndyY

    AndyY Member

    إنضم إلينا في:
    ‏23 فبراير 2013
    المشاركات:
    433
    عدد المعجبين:
    480
    The GCR website says "The new bridge is a "box girder" construction, with the two main sections being installed this weekend and followed in the coming weeks by the installation of 20 tonne steel plates which will form the main deck."
    So some 20 tonne plates to lift into place. It doesn't say how many.
    It's fascinating to see it all coming together.
    Andy
     
  11. mogulb

    mogulb New Member

    إنضم إلينا في:
    ‏20 ديسمبر 2010
    المشاركات:
    133
    عدد المعجبين:
    95
    AndyY. I think the 20 t is all the remaining steelwork as the bridge weighs in total 100t. There are approx 60 cross beams to install and then steel plate on top of them to take the ballast and track. There are a couple of drawings viewable on the Charnwood Borough council planning portal. Bit fiddly to find , but can be found if you search under Great Central Railway.
     
    Black Jim و jnc معجبون بهذا.
  12. mogulb

    mogulb New Member

    إنضم إلينا في:
    ‏20 ديسمبر 2010
    المشاركات:
    133
    عدد المعجبين:
    95
    robpalmer, Bean-counter, jnc و 4 آخرون معجبون بهذا.
  13. Ploughman

    Ploughman Part of the furniture

    إنضم إلينا في:
    ‏1 إبريل 2008
    المشاركات:
    5,987
    عدد المعجبين:
    2,767
    الوظيفة:
    Ex a lot of things.
    مكان الإقامة:
    Near where the 3 Ridings meet
    Heritage Railway Volunteer:
    Yes I am an active volunteer
    I take it all went to plan and no delays.

    Congratulations to all involved.
     
  14. AndyY

    AndyY Member

    إنضم إلينا في:
    ‏23 فبراير 2013
    المشاركات:
    433
    عدد المعجبين:
    480
    Splendid news! The 'end of the beginning'.

    There's no longer any excuse for the sceptics to doubt that this project will be completed, the timescale will just be determined by the rate that funding can be raised.
     
  15. Kinghambranch

    Kinghambranch Well-Known Member

    إنضم إلينا في:
    ‏20 ديسمبر 2006
    المشاركات:
    1,881
    عدد المعجبين:
    1,619
    الجنس:
    ذكر
    الوظيفة:
    Retired
    مكان الإقامة:
    White Rose County
    Heritage Railway Volunteer:
    No I do not currently volunteer
    I'm not too proud to admit that I was always very sceptical about this project ever happening in reality. Just goes to show, what do I know eh? Definitely the end of the beginning now and congratulations to all involved and for having more faith than I had.:Joyful:
     
  16. J Rob't Harrison

    J Rob't Harrison Member

    إنضم إلينا في:
    ‏6 نوفمبر 2016
    المشاركات:
    242
    عدد المعجبين:
    371
    الجنس:
    ذكر
    مكان الإقامة:
    Stafford
    Heritage Railway Volunteer:
    No I do not currently volunteer
    Having supported the project since it was first formally announced four (five?) years ago, it is very satisfying to see the first part of it nearing completion.

    "With the bridge complete, attention will move to the next phase of the gap project...."

    So, what's the next phase? Let's keep the momentum up!
     
  17. crantock

    crantock Member

    إنضم إلينا في:
    ‏22 نوفمبر 2008
    المشاركات:
    528
    عدد المعجبين:
    276
    الجنس:
    ذكر
    الوظيفة:
    Beancounter
    مكان الإقامة:
    Birmingham
    Heritage Railway Volunteer:
    No I do not currently volunteer
    Congratulations. But It's 10.40 and it's 2017. I can not find a daylight photo on the net.

    Anyone want to be a keyboard hero?


    Sent from my iPhone using Tapatalk
     
  18. J Rob't Harrison

    J Rob't Harrison Member

    إنضم إلينا في:
    ‏6 نوفمبر 2016
    المشاركات:
    242
    عدد المعجبين:
    371
    الجنس:
    ذكر
    مكان الإقامة:
    Stafford
    Heritage Railway Volunteer:
    No I do not currently volunteer
    ilvaporista, Kinghambranch, jnc و 1 شخص آخر معجبون بهذا.
  19. Black Jim

    Black Jim Member

    إنضم إلينا في:
    ‏21 اكتوبر 2009
    المشاركات:
    468
    عدد المعجبين:
    166
    At last! Bleddy marvellous thing to happen! I was on the railway in the early 90s , but since moving away have kept an eye on things , a lot through this website.
     
  20. Reading General

    Reading General Part of the furniture

    إنضم إلينا في:
    ‏18 ماي 2011
    المشاركات:
    6,081
    عدد المعجبين:
    2,217
    I had no idea this project was so advanced. Well done everyone concerned
     

مشاركة هذه الصفحة