What, the rife speculation that metal fatigue (due to a stick valve) probably wasn’t the cause, despite the incontrovertible fact that it was the...
What, when there was a legitimate mechanical failure and some tried to blame witchcraft, bad management and the cows coming home before accepting...
I wouldn’t worry if I were you. the next overhaul will roll around, and it will inevitably be problematic (because nearly all mainline steam...
Any Aberdonian's?
Wages should absolutley not be half of turnover, more like a third at most! Cost of delivering services, true cost, including track wear and tear,...
Great answer. Very political. Would you like to explain in some more detail the current status?
Is there any news on the Grantown extension?
Indeed, but the recieving clinet will have a drawing that the boiler should comply to, and of course a dimensional report will be on hand...
This farily making progress! Well done to all involved!
Boiler due in APril according to TCC in tornado thread. Exciting! Im guessing here that they have gone with the same design as the A1 then, with...
Did they not ask for water jacket thickness changes? If so, why? Have you a reason, other than dropping or residuals, for the box being out of square?
Dropped? That is unlikely. Its more likely that the box being out of square is due to the welding / repair situation. We know a fully welded box...
Flow area?
T1 is quoted at 64,643 lbf and BB at 135,375 lbf on wiki. A4 is 35000 ish isnt it?
The Tay Bridge situation of only working there to Ferryhill is odd to me, im guessing part of that was the constraints on MPDs in and around...
用逗号分隔用户名