Apopros nothing, this appeared in my FB today …. Not dead yet it appears …. https://www.facebook.com/bramleylinetrust?
Happy Christmas to all the team. Link is broken Ian?
Naughty boy ;)
That’s interesting thanks. Regarding stay length don’t forget that the two new boilers were said to have increased water space gap, to improve...
Exactly. That was my interpretation of the pictures that I’ve seen. To be honest I’ve not seen the assembly process, but those covers have to be...
AFAIK the fkexibles are welded inside but the outside is a radiused head able to swing slightly with lateral movement of the plate. This is sealed...
Other than seeing an inverted shot showing the bottom of the foundation ring I doubt you can tell?
Look up thread to my earlier post….. #4153
Probably the most plausible explanation so far ….
The fire hole door is central. Look at the flap catch and then upwards. Remember that the actual fire hole ring is rectangular on Meinigen boilers...
It ‘brand new’ though how many iterations there’ve been during its construction is open to question. See the Sept 23 article vs what’s landed in...
Sure, nothing wrong with a trial fit, though if iirc there’s no overhead crane in DLW2, so need to hire in a mobile one?
用逗号分隔用户名