If you register, you can do a lot more. And become an active part of our growing community. You'll have access to hidden forums, and enjoy the ability of replying and starting conversations.

Industrial Railway Crews

Discuție în 'Steam Traction' creată de johnofwessex, 27 Mai 2015.

  1. johnofwessex

    johnofwessex Resident of Nat Pres

    Înscris:
    6 Apr 2015
    Mesaje:
    9.794
    Aprecieri primite:
    7.941
    Sex:
    Masculin
    Ocupație:
    Thorn in my managers side
    Locație:
    72
    Heritage Railway Volunteer:
    No I do not currently volunteer
    Now, I know that the 'progression' for 'mainline' railway steam crews is fairly well documented - cleaner to fireman then driver but what happened on Industrial lines?

    Clearly some of for example the Colliery systems were very large so I assume would mimic this system. However what happened on smaller systems - some factories would only have had one locomotive.

    How did they get drivers and maintain their locomotives? Did they recruit 'main line' staff?
     
  2. Devonbelle

    Devonbelle New Member

    Înscris:
    1 Sep 2007
    Mesaje:
    128
    Aprecieri primite:
    163
    Sex:
    Masculin
    Ocupație:
    Railwayman
    Locație:
    Buggleskelly!
    Heritage Railway Volunteer:
    Yes I am an active volunteer
    My knowledge is limited but it was first hand.

    My great Grandad was recruited from the loco department in the LNWR to become loco foreman of the Cadbury Bournville railway system, and I was told other staff on the Cadbury railway system would generally be recruited internally, so a deckhand (loading wagons) could move onto the locos with training from an experienced hand.

    Also when I visited Littleton Colliery on its last day (in Dec 1993), Driver Ray Rushton who took me on a loco cab ride of the whole system said they had a period in the 196os when they would redeploy men from the pit coal face to fire the Littleton locomotives - he said all they knew initially was shovelling coal and would have to learn the art of firing and injectors!

    With regard to the previous para, Ray said one day a miner firing Littleton number 5 as it left penkridge sidings with empty wagons - never stopped shovelling until he'd got to Littleton, with the bunker emptied - no.5 had to be left to coal down, with the fire bars melted. Said individual returned to the coal face according to Ray!

    Paul
     
    Smokestack Lightning apreciază asta.
  3. Avonside1563

    Avonside1563 Well-Known Member

    Înscris:
    13 Iul 2007
    Mesaje:
    1.141
    Aprecieri primite:
    244
    Sex:
    Masculin
    Locație:
    Bolton's Sidings, just behind the running shed!
    Heritage Railway Volunteer:
    Yes I am an active volunteer
    Quite often the men would start as a shunter which could involve some firing as industrial locos were often single manned. From this they would progress to driving but as it was usually 'dead men's shoes' this could take some time. Some systems had two shunters allocated, one who would stay with the loco and do the firing and one on the ground.
     
  4. 22A

    22A Well-Known Member

    Înscris:
    8 Sep 2005
    Mesaje:
    1.106
    Aprecieri primite:
    99
    Ocupație:
    Administrator
    Locație:
    Between 31F & 34E
    That was how I saw things at NCB Mountain Ash between 1974 and 1980. Back at the shed they actually had a small team of dedicated fitters.
     

Distribuie pagina asta