Does it really need even five weeks of someone's time?
I know what was the usual mode of operation of the Weymouth services when the electrification stopped at Bournemouth, but when/where/why were an...
And wouldn't that be the right sort of size for some of our preserved railways?
I'm still not sure what you're getting at. The differences between those South African locos and a Fairlie are the single boiler (with two power...
Does it count as squabbling? It seems to me we're mostly seeing one or two individuals accusing the management of incompetence and deafness. Can...
That is all perfectly reasonable, but why does it cost £50k? Even with a good salary and overheads that would pay for a few months of someone...
Can someone please explain the last few posts to the uninitiated? Blue tray? Connection between Eastleigh and a shipyard? And for the even more...
Can you clarify the highlighted bit, please? I'm not clear as to what difference exists between Fairlie bogies and diesel bogies in how they fit...
As steam heating was being phased out, how difficult would it have been to fit a diesel-hydraulic loco with a small electric generator for train...
A patent will specify various features that are characteristic of the thing being patented. The specification must include details of at least one...
This has been often cited as one of several reasons why a commuter service on the WSR is impractical. How would the East Lancs be any different in...
Does that mean that sliding doors are less safe than hinged ones?
There's a big difference between one railway company building locos to sell to another one, which was regarded as unfair competition with the...
Thank you. It is very helpful to have an explanation not only of what you're doing but of why you're doing it. Even if some of us might have...
If the boiler inspector's examination is yet to happen, is the figure for the amount of cash needed any better than "wet finger in the air"?
The exact siting of a signal and what sort of post it's mounted on certainly deserve consideration, but some other matters seem considerably more...
In the short term, when they're developing the trains, it hardly matters where the hydrogen comes from, though obviously the whole project makes...
Are the tracks there normally bi-directional or was parallel running by special arrangement?
Is this the same share offer which has been open for several years or a new one? I registered my interest two years ago but in the end did not...
The latter circumstance hasn't killed the St Ives branch.
Separă nume cu o virgulă.