Lilla, Linda, Blanche, Bronllwyd, Winifred, Eigiau, Stanhope, Leary, Hugh Napier, Britomart. WHHR locos; FR and WHR service trains. Pont Croesor -...
We learn that Alan George is out of action so Sgt Murphy cannot travel north as it is needed to run service trains.
Linda, Blanche, Lilla, Britomart and Hugh Napier...
A blue Welsh Pony? [ATTACH]
And only run to Dinas, after stopping at Beddgelert for no obvious reason for a couple of hours. And take all the cushions out as well. And...
Palmerston, Dinas March 2010. [ATTACH]
It was renamed EoM in the hope that The Duke of Edinburgh would pop along to unveil it (EoM is one of his honorary titles). He never showed up...
Late 60s engine? FR Locomotives - Festipedia
When complete, the FR platform face will be 285 metres long and will be signalled allowing two trains to use it simultaneously - a full-length...
That's just the far end of the platform. We can't construct the bit at the station end before we lift all the existing track.
Phase 3 Summer 2013 - we can start the tracklaying without disrupting services, Phase 4 starts after daily services end October 2013, whole thing...
Drawings for Phases 2, 3 & 4 attached. Should look like Phase 2 by beginning of 2013. Note tracklaying of Phase 3 can proceed without disruption...
The new king point has been lying in Minffordd Yard since the beginning of the year, but there isn't sufficient clearance to install it until the...
Yep. Here.
Outline final track layout. [ATTACH]
Not without splitting the FR sets at Port or double heading everything.
I did Rhyd Ddu to Dinas in 'observation car' semiopen Bug Box #1 in March a couple of years ago in a gale and a torrential downpour and it was...
When I arrive so you can buy me a pint.
We have a life-long supporter of the railway, a lovely old bloke who has just bought a house in Port. When he dies, the house and all his money...
All I can say is that I'm proud to have been part of the cockup.
Separă nume cu o virgulă.