I made my first visit to the line yesterday and I was very impressed. It really had the feel of a main line railway and I loved that the freight...
Very moist and quite muddy by the fence, not sure about the rest of the field. I had to give one chap a push when he got stuck.
With the overcrowding problems that are often experienced, I'm not sure one can call the modern policy entirely successful.
The fact is that without one scrapyard in Wales and a hell of a lot of effort from the preservation movement there would be very little left of...
It's a sad time to be a deltic fan that's for sure.
I spent all of Friday and some of Saturday on the trains and thankfully avoided most of the operational problems. I liked the timetable and the...
My WTT hasnt't arrived yet. How long do you think I should leave it before contacting the SVR?
You have a point there Matt, I'm sure that has some impact, but I do think that the management of the NRM must shoulder some of the blame for...
Thank you. I don't post often but with encouragement like that I shall be more inclined to do so..
The NRM really needs to pull it's head out of it's backside.
Shaping up to be a proper branch line gala.
Twit.
Must be my Scottish blood.
Rather expensive though.
What was the signalling problem last year?
Its been 47 years, a few more weeks to make it perfect wont hurt.
You may be right about repeat business but I find myself thinking back to when my family were staying in a b&b near Kidderminster about 20 years...
The general public go to heritage lines to ride behind a steam train, very often they don't plan ahead and just turn up expecting steam so they...
Re: New builds - how many will ever really work? I recall a similar plan surfacing after the film was released in 1997 but nothing ever came of it.
No, once the full set is complete build the 8F 2-8-2.
Separă nume cu o virgulă.