44871 moving Bury-Carnforth on Monday 20th. 5Z48, 12:45 from Hopwood GF.
It's now April and I believe the boiler is still at Tyseley.
Full timings now on Railcam, gone live in the last hour or so. Nothing on RTT yet.
I imagine the same layout as 5236, 5237, 5249 (other than being air braked rather than vacuum braked), which were used on the Cathedrals Express...
5229 and 5239 are "Second Opens" with 2+1 seating in 8 bays, and are used as Firsts.
GB ECS as set out from Carnforth - 5239, 5229, 1961, 3395, 1212, 3431, 3392, 9539 First two vehicles are pressure-ventilated. Unless it's had a...
Surely the only people who really need decent advance notice of the schedule are the people involved in the train's operation, or those travelling...
I don't think this conflicts with what WCR has said. WCR has conceded the need for CDL across the whole Mk. 1 fleet. WCR has formally approached...
Wasn't counting the GB 2025 as I'd class that as failing "on shed" rather than on the road. Failing in such a way as to incur delay minutes. I...
Since she emerged from overhaul in October 2021, by my count she has racked up 74 main line tours, not far off 20,000 miles including ECS, and the...
Load 8 and only seems to be 4 passenger coaches (3x FO, 1x TSO) in total. Plus loco support, genny van, staff support, and kitchen.
Two tours a month, the vast majority based out of Southall, is what SLL has been operating on, so that works out. Don't know if she'll return to...
Bransty tunnel closure aside, not much chance of setting Cumbrian vegetation ablaze this year given how wet it has been in recent weeks.
Hellifield - I presume it's going to be on standby there over the weekend for the Avanti diversions.
Trenne Benutzernamen durch Kommata.