brmp201's Recent Activity
-
brmp201 liked green five's post in the thread Mid Hants Railway Operational Matters.
CanPac has definitely been a great asset for the railway since returning from her lengthy overhaul. She was thrown in at the deep end so to speak when 30506 developed a boiler problem and was out of action for some time. 35005 was the main motive...
Sep 1, 2026 at 8:33 AM -
brmp201 liked Johann Marsbar's post in the thread Bridge that Gap: Great Central Railway News.
Going out to tender for the next phase of work....... [MEDIA]
Sep 1, 2026 at 8:19 AM -
brmp201 liked Jamessquared's post in the thread Current and Proposed New-Builds.
Crampton Locomotive - this is a project that for a long time seemed to have gone into abeyance, but has flared into life over the last year or two, with really significant progress. https://cramptonlocomotivetrust.org/ The website has had a...
Aug 29, 2026 at 11:35 AM -
brmp201 replied to the thread Lynton and Barnstaple - Operations and Development.
Planning consultation closes today, so anyone yet to register their support, please do so: Planning: EXM/26/172/FULL - Online Register
Aug 27, 2026 at 1:50 PM -
brmp201 liked WorkingPressure225's post in the thread Bluebell Railway General Discussion.
The main one currently ongoing is the work to enable any future extension (if it ever happens). The embankment on the spur will be strengthened, and the current plan is to lay double track along the length of the embankment to “the gap”. This...
Aug 27, 2026 at 8:06 AM