If you register, you can do a lot more. And become an active part of our growing community. You'll have access to hidden forums, and enjoy the ability of replying and starting conversations.

Текущая активность Breva

  1. Breva добавил(а) вложение в тему Rother Valley Railway.

    Here is a picture of the last connecting piece of rail being dropped in. [ATTACH] This is also the site of the future passing loop. We took pictures of the team, I'm not sure if I may post this, so check out the RVR blog, who had a...

    IMG_20260918_162122266~2.jpg 18 сен 2026 в 21:10
  2. Breva ответил(а) в теме Rother Valley Railway.

    An excellent fifth track laying day today. Thanks to a boost in volunteers today, and the availability of a second 360, we were able to lay 5 1/2 track panels, and actually connect with the through road of the loop. The word is that this week we...

    18 сен 2026 в 21:06
  3. Breva добавил(а) вложение в тему Rother Valley Railway.

    The mystery of the moving chairs has finally been resolved... [ATTACH]

    IMG_20260917_123431663~2.jpg 17 сен 2026 в 20:08
  4. Breva добавил(а) вложение в тему Rother Valley Railway.

    [ATTACH] The target is the rail head in the distance, the through road of the future passing loop.

    IMG_20260917_162906083~2.jpg 17 сен 2026 в 20:06
  5. Breva добавил(а) вложение в тему Rother Valley Railway.

    At lunch time the weather brightened, and we did quite well. [ATTACH] We began the week two fields away, and have now laid 16 panels in total. It looks like the week's target is actually 21 or 22 panels, so pressure will be on during the last day.

    IMG_20260917_164419171_HDR~3.jpg 17 сен 2026 в 20:04
  6. Breva добавил(а) вложение в тему Rother Valley Railway.

    Example of this morning's weather conditions. [ATTACH] Water running off the trees ran straight down your neck

    IMG_20260917_115023736~3.jpg 17 сен 2026 в 20:00
  7. Breva добавил(а) вложение в тему Rother Valley Railway.

    This is where we started : [ATTACH] i.e most of the way round the curve.

    IMG_20260917_085354773~2.jpg 17 сен 2026 в 19:58
  8. Breva ответил(а) в теме Rother Valley Railway.

    Heavy rain throughout this morning :( Also, only 4 of us on site, to try and achieve the daily average of 4 panels. We managed 3 1/2 panels at the end of the day. Still, we're that much nearer to joining up with the through road of the passing loop.

    17 сен 2026 в 19:55
  9. Breva ответил(а) в теме Rother Valley Railway.

    d).

    17 сен 2026 в 19:52
  10. Breva добавил(а) вложение в тему Rother Valley Railway.

    [ATTACH] There's an appeal for the engine shed at Robertsbridge. If you enjoy these pictures, maybe you'd like to help?

    IMG_20260916_163041667~2.jpg 16 сен 2026 в 19:38
  11. Breva добавил(а) вложение в тему Rother Valley Railway.

    This is where we are going to, you should able to see the other rail head. It's to the right of the white car.[ATTACH] It's about 200 paces, and we have two more days this week.

    IMG_20260916_160730803~3.jpg 16 сен 2026 в 19:36
  12. Breva ответил(а) в теме Rother Valley Railway.

    They did, down to today's starting point, and now there are three of them! A chair makes a good reference point, if you look back from the next rail head.

    16 сен 2026 в 19:32
  13. Breva добавил(а) вложение в тему Rother Valley Railway.

    The starting point (still a chair, but today with an orange jacket on it) is in the distance by the field boundary. [ATTACH] As you can see we were just 5 people today, plus the digger driver.

    IMG_20260916_160759725_HDR~2.jpg 16 сен 2026 в 17:53
  14. Breva ответил(а) в теме Rother Valley Railway.

    Three and a half panels laid today. That makes a total of 12 1/2 in 3 days, out of the week's target of 20.

    16 сен 2026 в 17:48
  15. Breva нравится сообщение Wenlock в теме Rother Valley Railway.

    More puzzled as to why anyone would carry 4 (or 6) chairs to such an isolated place.

    15 сен 2026 в 22:13