If you register, you can do a lot more. And become an active part of our growing community. You'll have access to hidden forums, and enjoy the ability of replying and starting conversations.

Accounting for Steam Locomotives (ex Flying Scotsman thread)

Тема в разделе 'Steam Traction', создана пользователем green five, 21 дек 2025 в 15:51.

  1. Jimc

    Jimc Part of the furniture

    Дата регистрации:
    8 сен 2005
    Сообщения:
    4.153
    Симпатии:
    4.899
    Род занятий:
    Once computers, now part time writer I suppose.
    Адрес:
    SE England
    Heritage Railway Volunteer:
    No I do not currently volunteer
    Way before. The GWR and Armstrong goods are an example. Some were built as renewals, and given the numbers of withdrawn locomotives, and some on capital, and given previously unused numbers in a new series. I think a good number of lines did the same.
     
  2. S.A.C. Martin

    S.A.C. Martin Part of the furniture

    Дата регистрации:
    31 авг 2010
    Сообщения:
    5.621
    Симпатии:
    9.462
    Пол:
    Мужской
    Род занятий:
    Asset Engineer (Signalling), MNLPS Treasurer
    Адрес:
    London
    Heritage Railway Volunteer:
    Yes I am an active volunteer
    Edward Thompson’s standardisation programme was predicated on that precisely that basis. Hence why his standardisation programme included a 4-6-0, 2-6-4T, a large 2-6-0, a large 2-8-0 and two Pacific types to do the mainstay of the work going forward and remove less powerful Victorian classes.

    Bulleid wanted to build 110 Pacifics on the basis of removing a significant amount of small, pre grouping stock (like Thompson he wanted to reduce the Southern Railway fleet to a small pool of standard locomotives that could do a variety of work).

    Gresley had similar aims to both with different economic and political circumstances.

    If a railway isn’t looking at maintenance as a major component of their work, then they’re not doing their job properly.

    I would humbly suggest you haven't done enough reading.

    Now back to my crypt…
     
    Romsey, Miff, Johnme101 и 7 другим нравится это.
  3. RAB3L

    RAB3L Member

    Дата регистрации:
    4 янв 2013
    Сообщения:
    565
    Симпатии:
    318
    After Gresley, Thompson had plenty of scope for standardisation! Perhaps you missed/ignored the word "just" in the sentence? Same old, same old....
     
    Last edited: 26 дек 2025 в 09:33
  4. Miff

    Miff Part of the furniture Friend

    Дата регистрации:
    17 июн 2008
    Сообщения:
    3.154
    Симпатии:
    3.298
    I don’t understand- which sentence?
     
  5. RAB3L

    RAB3L Member

    Дата регистрации:
    4 янв 2013
    Сообщения:
    565
    Симпатии:
    318
    The one quoted in post #42.
     
    Miff нравится это.
  6. RAB3L

    RAB3L Member

    Дата регистрации:
    4 янв 2013
    Сообщения:
    565
    Симпатии:
    318
    Of course, there much better ways of saving on boiler maintenance than building slightly larger boilers and then attempting to restrain their locomotive's potential! Boiler water treatment would be the most obvious. Compounding could have been another.
     
    Last edited: 26 дек 2025 в 13:32
  7. brennan

    brennan Member

    Дата регистрации:
    11 сен 2016
    Сообщения:
    510
    Симпатии:
    577
    Адрес:
    Gloucester
    Heritage Railway Volunteer:
    No I do not currently volunteer
    If Swindon had sorted out their oil reservoirs they would have saved a fortune in cork not to mention the amount of time drivers spent faffing around extracting broken ends.....
     
  8. RAB3L

    RAB3L Member

    Дата регистрации:
    4 янв 2013
    Сообщения:
    565
    Симпатии:
    318
    The Castle Abbeys were not rebuilds but new locomotives. From Wikipedia:

    https://en.wikipedia.org/wiki/GWR_4000_Class

    "As already noted, between 1925 and 1940 Churchward's successor Charles Collett ordered fifteen examples to be dismantled and their parts used in the construction of new Castle class locomotives. Throughout their careers the remainder of the class was subject to detailed modifications and improvements to their boilers, smokeboxes, and steam pipes so that "the only period when the appearance of the class was approximately uniform was from 1925 to 1927".[18] 4,000 imp gal (18,000 L; 4,800 US gal) tenders were also fitted from 1938 onwards."

    For what it is worth, Mr Nock didn't consider them rebuilds. If they were rebuilds, why were they re-numbered? Doesn't that imply that they had new frames?

    If that's the case, there were only five Star to Castle rebuilds:

    4000 North Star rebuilt 11/29
    4009 Shooting Star rebuilt 4/25
    4016 Knight of the Golden Fleece rebuilt 10/25
    4032 Queen Alexandra rebuilt 4/26
    4037 Queen Philippa rebuilt 6/26

    The fact that most of these rebuilds occurred early on does imply that it was done to make savings, in order to maximise those savings. However, the fact that only one further rebuild followed suggests that the theory was not borne out by practice.

    Incidentally, Queen Philippa, built in 12/10, lasted until 9/62!
     
  9. RAB3L

    RAB3L Member

    Дата регистрации:
    4 янв 2013
    Сообщения:
    565
    Симпатии:
    318
    I think cork was favoured because its low weight meant that they were less likely to be lost through centrifugal forces. They were/are reinforced with cane (or should be). I didn't find them a problem - for what it's worth!
     
  10. Jamessquared

    Jamessquared Nat Pres stalwart

    Дата регистрации:
    8 мар 2008
    Сообщения:
    28.585
    Симпатии:
    68.016
    Адрес:
    LBSC 215
    Heritage Railway Volunteer:
    Yes I am an active volunteer
    I think you are dancing on a pinhead here.

    Cook (who was there, unlike both you and Nock!) says:

    Then Collett decided that it would be better to do any further conversions on relatively newer engines in which naturally the framing would be in better condition, hence ten Abbeys, 4063 to 4072 were done on a case made out for Capital Renewal, It involved extending the frames by one foot at the trailing end, new cylinders and saddle casting and new boiler.
    Basically that sounds like the frames, wheels, tenders and sundry components were re-used, with new cylinders (which were due to be renewed anyway) and boilers. The frames were extended, but fundamentally reused, not replaced. They were renewals, because they were done on the renewal account - as simple as that - but much of the fabric of the original Stars ended up in the Castles.

    Changes of numbers is an irrelevant - the older companies in particular often preserved numbers to maintain continuity in the capital list, but the practice wasn't universal. There are other cases of the GWR renumbering locos without it affecting their identity - not least the Dukedogs, which went from 32xx to 90xx later in their life.

    Tom
     
  11. brennan

    brennan Member

    Дата регистрации:
    11 сен 2016
    Сообщения:
    510
    Симпатии:
    577
    Адрес:
    Gloucester
    Heritage Railway Volunteer:
    No I do not currently volunteer
    Another major advantage quoted by some enginemen for the use of so many corks was that if the loco fell into a river it would float.
     
    5944 нравится это.
  12. Michael Rowe

    Michael Rowe New Member

    Дата регистрации:
    3 авг 2025
    Сообщения:
    2
    Симпатии:
    9
    Пол:
    Мужской
    Адрес:
    Somerset
    Heritage Railway Volunteer:
    Yes I am an active volunteer

    A belated Happy Christmas to everyone..

    I have just read through this discussion. Not sure whether the key feature is the Star rebuilds
    or larger boilers leading to overall savings in ‘maintenance’ costs .

    I think it is necessary to state the obvious that any ‘modern’ locomotive was a compromise,
    especially so in the UK with restricted loading gauge, less so on the GWR.

    The rebuilding of the Stars, i.e. the extension of the frames at the rear to accommodate the
    larger boiler and cab plus larger cylinders appears to have been fairly random but does seem
    to have coincided with selecting locos requiring a general overhaul. I think they were rebuilds
    ( irrespectiveof whether ‘ capex ‘ or ‘ opex ‘‘ ) , except 4037, She was rebuilt with extended frame
    etc in 1926 but in 1937 she was rebuilt with a new ‘Castle’ frame ( actually one with the frame set
    inwards as per Nos 4073-92, not the later straight frame). I consider that No.4037 was
    not only renamed in 1937 but was effectively a new Castle, which perhaps explains its long
    life and brings the 2.4million miles into question. I have no idea what subterfuge was at
    work wrt the 1937 changes ?

    The possible savings in running costs due to overall boiler maintenance, whether by long
    life or miles twixt overhauls may well have been a consideration but I also think heavier
    trains was important


    The BR WTTs for the early 1950s contain the following engine loads Paddington Reading
    King. 60xx 500tons, Castle 455 tons, Star 420 tons. Over the South Devon banks,
    Newton Abbot to Rattery 360, 315 and 288 tons.

    I note that in the boiler discussion reference was made to Messrs Gresley, Thompson
    and Bulled. I would not presume to question Mr Martin concerning the first two.

    Mr. Bulleid in his paper to the I. Mech Eng in 1945 stated he had increased boiler pressure
    in the Pacifics to 280 psi, previous 220psi SR norm, not just for the higher final superheat
    temperature but to enable the use of smaller cylinders. whilst meeting his performance
    criteria eg 600 ton trains, 70 mph start to stop averages, fast freights. ( Contrary to
    oft quoted he did not say 600 ton trains at 70 mph average ) with 6’ 2” wheels.
    U
    He emphasised the need for good water treatment, aligned with his steel fireboxes.
    Softening, plus continuous water treatment ( effectively TIA, pre war he had extensive
    French experience, particularly as he accompanied ‘Cock of the North’ when tested
    at Vitry.)

    Bulleid I think was endeavouring to limit future SR motive power to a minimum number
    of classes. The 1943/5 electrification plan proposed all routes east of Salisbury Bournemouth
    to be electrified by 19555 ; Merchant Navy, West Country/ Battle of Britain, Q1 and Leader.

    So yes a WC might haul two carriages Padstow Okehampton in Winterm but ten in Summer.

    I could go on, design was always a compromise, one final thought even with a compromise,
    reliability and miles per day was I suggest preeminent post WWII aligned with indifferent
    fuel, labour shortage and costs thereof.

    Michael Rowe



    I
     
    Last edited: 26 дек 2025 в 12:07
  13. RAB3L

    RAB3L Member

    Дата регистрации:
    4 янв 2013
    Сообщения:
    565
    Симпатии:
    318
    So the Castles were built because the GWR needed more powerful locomotives to haul heavier traffic after WW1, just as Churchward's Atlantics had earlier been converted to 4-6-0s before WW1. But Stars were rebuilt as Castles primarily to save money on boiler maintenance when used at less than maximum power? No contradiction there then! If that were the case, wouldn't all the Stars have been rebuilt as Castles, or at least those whose condition warranted it? According to the theory, this would have produced a more flexible fleet - unlike the Stars, the Castles could be used for their increased power or used at similar power levels to the Stars along with boiler maintenance economies. This would have ensured that Castles were used on the less demanding duties that would have been allotted to the Stars, guaranteeing the theoretical boiler maintenance economies. But only about 20% of Stars were rebuilt as Castles.
     
    Last edited: 26 дек 2025 в 14:00
  14. 21B

    21B Part of the furniture

    Дата регистрации:
    2 сен 2009
    Сообщения:
    4.750
    Симпатии:
    10.927
    Why does it have to be black and white? Reputable sources make it clear that a consideration was reduced maintenance. Equally we know train weights would have been a consideration for the operating department.

    But, few trains (relative to the total operated) would have been run at maximum tonnage. And, the railway did not have unlimited resources.

    What you seem to me not to take into account is the fundamental business nature of the whole thing. These decisions were being taken in order to run the railway for lowest cost / making best use of resources / using budgets that were available.

    Some Stars were rebuilt as Castles because they had a budget and a requirement. Others were not. This doesn’t invalidate the reasoning given by Cook for the rebuild.
     

Поделиться этой страницей