P2 Locomotive Company and related matters

Тема в разделе 'Steam Traction', создана пользователем class8mikado, 13 сен 2013.

  1. class8mikado

    class8mikado Part of the furniture

    Дата регистрации:
    1 июн 2009
    Сообщения:
    3.937
    Симпатии:
    1.701
    Род занятий:
    Print Estimator/ Repository of Useless Informatio.
    Адрес:
    Bingley W.Yorks.
    Heritage Railway Volunteer:
    No I do not currently volunteer
    Yes, but the fact that they have been successful at doing just that is actually something to celebrate ?
    Without that we would'nt have an A1 and most of a P2 for us to bitch about the (mis?) handling of now would we.
     
    MellishR нравится это.
  2. Sheff

    Sheff Resident of Nat Pres

    Дата регистрации:
    21 апр 2006
    Сообщения:
    8.305
    Симпатии:
    3.466
    Пол:
    Мужской
    Род занятий:
    Retired Engineer & Heritage Volunteer
    Адрес:
    N Warks
    Heritage Railway Volunteer:
    Yes I am an active volunteer
    Just read this, where does it say it’s the ‘2nd boiler’? My source stated that the 2nd boiler is irreparably distorted, and that the 3rd boiler had faults that had to be addressed before it could be shipped to the UK for finishing …… these included the foundation ring corners - which corresponds with the MM article.

    Out of interest, they make a point of stating that the corners going in were ‘forged’. This was a change made to Tornado’s firebox many years ago to address the cracking problem with the machined originals. So was the new ‘box somehow constructed with the old style corners? If so, why wasn’t this picked up by the Trust’s QA process?
     
    John Merry, Sir Ralph Wedgwood и Johnb нравится это.
  3. class8mikado

    class8mikado Part of the furniture

    Дата регистрации:
    1 июн 2009
    Сообщения:
    3.937
    Симпатии:
    1.701
    Род занятий:
    Print Estimator/ Repository of Useless Informatio.
    Адрес:
    Bingley W.Yorks.
    Heritage Railway Volunteer:
    No I do not currently volunteer
    Wondering if the water spaces have actually been increased as per the originally proposed Meiningen version of the
    design and they have been working to that design ( with its continental foibles) rather than a Tornado boiler redesign ( with its UK Peculiarities)?
     
  4. osprey

    osprey Resident of Nat Pres

    Дата регистрации:
    3 окт 2007
    Сообщения:
    11.327
    Симпатии:
    3.230
    Род занятий:
    semi-retired, currently doing R&D for my patents
    Адрес:
    Halifax
    But I thought that reading posts on this forum that the third boiler was a kit of parts ? Apologies if I've misread things.
     
    Sir Ralph Wedgwood нравится это.
  5. Sheff

    Sheff Resident of Nat Pres

    Дата регистрации:
    21 апр 2006
    Сообщения:
    8.305
    Симпатии:
    3.466
    Пол:
    Мужской
    Род занятий:
    Retired Engineer & Heritage Volunteer
    Адрес:
    N Warks
    Heritage Railway Volunteer:
    Yes I am an active volunteer
    It seems it has progressed from that state now, but as someone said above, the proof of the pudding will be two complete and compliant boilers sat in Darlington. I'm afraid as far as I'm concerned the Trust have lost all credibility until proven otherwise.
     
    Last edited by a moderator: 2 авг 2025
    MellishR, John Merry, Johnb и ещё 1-му нравится это.
  6. osprey

    osprey Resident of Nat Pres

    Дата регистрации:
    3 окт 2007
    Сообщения:
    11.327
    Симпатии:
    3.230
    Род занятий:
    semi-retired, currently doing R&D for my patents
    Адрес:
    Halifax
    Thanks...as you rightly point out.. until "sat at Darlington" is the word. I'm still open minded.... I just want to see a P2 in the flesh before I go to landfill...a dream come true...
     
    Sheff, John Merry и Sir Ralph Wedgwood нравится это.
  7. osprey

    osprey Resident of Nat Pres

    Дата регистрации:
    3 окт 2007
    Сообщения:
    11.327
    Симпатии:
    3.230
    Род занятий:
    semi-retired, currently doing R&D for my patents
    Адрес:
    Halifax
    I hasten to add ...not a dream going to landfill....just to see a P2...
     
    MellishR, Sheff, John Merry и ещё 1-му нравится это.
  8. martin1656

    martin1656 Guest

    If the concern is the foundation ring, surely why not have a conventional cast foundation ring Rivetted to the firebox sides, or will the side sheets of the firebox need to be changed to do this, ?
     
  9. RalphW

    RalphW Nat Pres stalwart Staff Member Administrator Friend

    Дата регистрации:
    11 сен 2005
    Сообщения:
    37.059
    Симпатии:
    10.374
    Пол:
    Мужской
    Род занятий:
    Retired-ish, Part time rail tour steward.
    Адрес:
    Northwich
    Heritage Railway Volunteer:
    No I do not currently volunteer
    Just to see a P2 going to landfill, was that what you were trying to say? ponder.gif :rolleyes: :)
     
  10. 60044

    60044 Well-Known Member

    Дата регистрации:
    24 фев 2016
    Сообщения:
    1.180
    Симпатии:
    1.654
    Пол:
    Мужской
    Адрес:
    Salisbury
    Heritage Railway Volunteer:
    Yes I am an active volunteer
    I always thought foundation rings were forged, rather than cast.
     
    Hirn, std tank и osprey нравится это.
  11. osprey

    osprey Resident of Nat Pres

    Дата регистрации:
    3 окт 2007
    Сообщения:
    11.327
    Симпатии:
    3.230
    Род занятий:
    semi-retired, currently doing R&D for my patents
    Адрес:
    Halifax
  12. martin1656

    martin1656 Guest

    sorry yes, your right, must engage brain first next time, but the question remains, if using a forged ring eliminates the cracking issue, is it a viable alternative?
     
  13. Sheff

    Sheff Resident of Nat Pres

    Дата регистрации:
    21 апр 2006
    Сообщения:
    8.305
    Симпатии:
    3.466
    Пол:
    Мужской
    Род занятий:
    Retired Engineer & Heritage Volunteer
    Адрес:
    N Warks
    Heritage Railway Volunteer:
    Yes I am an active volunteer
    IIRC the design was to be based on the current Tornado stay configuration and foundation ring forged corners, but with increased water space width. Now that the old boiler has been refurb'ed, instead of being set aside for later modification to the new spec, this will result in having two boilers with incompatible grate dimensions, so no commonality of spare grate sections. In fact the brick arch will also differ to some extent too.
     
    Last edited: 2 авг 2025
  14. Dunfanaghy Road

    Dunfanaghy Road Well-Known Member

    Дата регистрации:
    9 окт 2019
    Сообщения:
    1.498
    Симпатии:
    1.961
    Пол:
    Мужской
    Род занятий:
    Retired
    Адрес:
    Alton, Hants
    Heritage Railway Volunteer:
    Yes I am an active volunteer
    The Southern had a procedure for welding them.
    Pat
     
    osprey нравится это.
  15. std tank

    std tank Part of the furniture

    Дата регистрации:
    20 сен 2005
    Сообщения:
    3.987
    Симпатии:
    1.124
    Пол:
    Мужской
    Род занятий:
    Retired
    Адрес:
    Liverpool
    Heritage Railway Volunteer:
    Yes I am an active volunteer
    Yes, some forged complete and machined, others forged as four pieces, then welded and machined.
     
  16. guycarr360

    guycarr360 Part of the furniture

    Дата регистрации:
    4 окт 2005
    Сообщения:
    5.097
    Симпатии:
    3.356
    Пол:
    Мужской
    Адрес:
    Chester le Street County Durham
    In January at the infamous visit, that was what was told, as @Sheff says, it may have gone into construction in the meantime???
     
    Sheff нравится это.
  17. osprey

    osprey Resident of Nat Pres

    Дата регистрации:
    3 окт 2007
    Сообщения:
    11.327
    Симпатии:
    3.230
    Род занятий:
    semi-retired, currently doing R&D for my patents
    Адрес:
    Halifax
    Out of curiosity are the basic components of a boiler/firebox stress relieved before welding ? For instance rolled steel is already stressed even before being machined/welded...just curious.... My years in engineering saw that machining (milling) one side of a rolled bar of flat steel released stresses...round bar and turning was not such a problem as you were dealing with a slightly different grain structure....
     
    Hirn, northernsteam и Sheff нравится это.
  18. Jamessquared

    Jamessquared Nat Pres stalwart

    Дата регистрации:
    8 мар 2008
    Сообщения:
    28.582
    Симпатии:
    68.014
    Адрес:
    LBSC 215
    Heritage Railway Volunteer:
    Yes I am an active volunteer
    Different grate area doesn’t automatically mean no commonality in grate sections. I don’t know what a Peppercorn grate looks like in detail, but the key thing is what is disposable, ie the firebars (in a conventional grate) or the cast elements in a rocking grate. They may well be interchsngeable, just perhaps having one element fewer in width, for example.

    As for brick arches - they are disposable and cast in situ just using a simple wooden former. So not much odds if two fireboxes differ in width by a couple of inches or so; you cast to fit the space.

    Ultimately, steam locos are in some facets precision machines built to close tolerances, and in others very definitely not!

    Tom
     
    MellishR нравится это.
  19. osprey

    osprey Resident of Nat Pres

    Дата регистрации:
    3 окт 2007
    Сообщения:
    11.327
    Симпатии:
    3.230
    Род занятий:
    semi-retired, currently doing R&D for my patents
    Адрес:
    Halifax
    I've often wondered about your last paragraph. Having been in the machine tool industry all my life chasing half "thous" ( .0005 inches) and then microns made me smile...
     
    northernsteam, RalphW, Steve и ещё 1-му нравится это.
  20. Sheff

    Sheff Resident of Nat Pres

    Дата регистрации:
    21 апр 2006
    Сообщения:
    8.305
    Симпатии:
    3.466
    Пол:
    Мужской
    Род занятий:
    Retired Engineer & Heritage Volunteer
    Адрес:
    N Warks
    Heritage Railway Volunteer:
    Yes I am an active volunteer
    I take your point Tom. I’ve only built arches in narrow box locos using precast firebricks. I can imagine in a wide box this may not be practical and so a former and fire cement is preferable, in which case my point is redundant.

    What happens with Bulleids with their syphons and S160s with arch tubes I wonder?

    As for the grate, it would be fairly straightforward to enlarge the area slightly by widening the side bearers, but not so easy to go smaller as in this case ?
     