If you register, you can do a lot more. And become an active part of our growing community. You'll have access to hidden forums, and enjoy the ability of replying and starting conversations.

Mid Hants Railway Operational Matters

Тема в разделе 'Heritage Railways & Centres in the UK', создана пользователем NightRail, 11 янв 2017.

  1. Jamessquared

    Jamessquared Nat Pres stalwart

    Дата регистрации:
    8 мар 2008
    Сообщения:
    28.038
    Симпатии:
    65.661
    Адрес:
    LBSC 215
    Heritage Railway Volunteer:
    Yes I am an active volunteer
    Is it too early for the livery debate? ;)

    Tom
     
  2. Copper-capped

    Copper-capped Part of the furniture

    Дата регистрации:
    19 апр 2017
    Сообщения:
    3.536
    Симпатии:
    4.185
    Пол:
    Мужской
    Адрес:
    Stanthorpe, QLD, Australia
    Heritage Railway Volunteer:
    No I do not currently volunteer
    Deleted
     
  3. Copper-capped

    Copper-capped Part of the furniture

    Дата регистрации:
    19 апр 2017
    Сообщения:
    3.536
    Симпатии:
    4.185
    Пол:
    Мужской
    Адрес:
    Stanthorpe, QLD, Australia
    Heritage Railway Volunteer:
    No I do not currently volunteer
    Stick a Massey TE-20 on it…they usually come in unlined grey…
     
    Dunfanaghy Road и CH 19 нравится это.
  4. 73129

    73129 Part of the furniture

    Дата регистрации:
    24 сен 2007
    Сообщения:
    4.549
    Симпатии:
    1.189
    Адрес:
    Winchester
    The latest YouTube video is now available to watch. Great to see what’s happening on Urie S15 499.

     
    Johnme101 и green five нравится это.
  5. RASDV

    RASDV Member

    Дата регистрации:
    8 май 2010
    Сообщения:
    497
    Симпатии:
    199
    Адрес:
    Midlands
    Does anyone know how long 5239 ‘Goliath’ is staying on the railway? I'd like to try and ride behind it if I can over the summer.

    Thanks!
     
  6. green five

    green five Resident of Nat Pres

    Дата регистрации:
    30 апр 2006
    Сообщения:
    6.817
    Симпатии:
    2.720
    Пол:
    Мужской
    Род занятий:
    Design Draughtsman
    Адрес:
    Hampshire
    Heritage Railway Volunteer:
    No I do not currently volunteer
    It was mentioned earlier in this thread that she is staying for the summer season.

    Sent from my XQ-BT52 using Tapatalk
     
    RASDV нравится это.
  7. WesternRegionHampshireman

    WesternRegionHampshireman Well-Known Member

    Дата регистрации:
    25 сен 2021
    Сообщения:
    1.188
    Симпатии:
    222
    Пол:
    Мужской
    Адрес:
    Hampshire
    Heritage Railway Volunteer:
    No I do not currently volunteer
    Would that also include the autumn gala perhaps?
    They are short of engines after all.
     
  8. Stinch

    Stinch New Member

    Дата регистрации:
    1 июл 2019
    Сообщения:
    140
    Симпатии:
    420
    Пол:
    Мужской
    Адрес:
    Essex
    Heritage Railway Volunteer:
    Yes I am an active volunteer
    Yes she is staying for the season. Very enjoyable day on her today.
    Nice to see the Druid and the Urie Group with the S15 in steam too
     

    Вложения:

    • IMG_6266.jpeg
      IMG_6266.jpeg
      Размер файла:
      3 МБ
      Просмотров:
      67
    Nick C и green five нравится это.
  9. Hampshire Unit

    Hampshire Unit Well-Known Member Friend

    Дата регистрации:
    16 янв 2012
    Сообщения:
    1.605
    Симпатии:
    3.475
    Пол:
    Мужской
    Род занятий:
    Carer, Gardener
    Адрес:
    Alresford
    Heritage Railway Volunteer:
    Yes I am an active volunteer
    Sitting in the garden with a wee dram listening to Goliath departing with the RAT- lots of black smoke drifting. Here's one from earlier this evening[​IMG]Goliath hauls the RAT by Stephen Morley, on Flickr
     
    Last edited: 1 июл 2023
    ragl, Dave Williams, ykin01 и 8 другим нравится это.
  10. Duty Druid

    Duty Druid Resident of Nat Pres

    Дата регистрации:
    19 июл 2010
    Сообщения:
    11.122
    Симпатии:
    4.762
    Heritage Railway Volunteer:
    Yes I am an active volunteer
    It were just Muggin's 'ere and his mucker atop the hill yesterday, and for once muggin's didn't have go and see a man about a dog later in the day, but he did need to visit Ropley at some point to pay this years subs to the ULS, which neant handing money over to my Ropley spy...... :eek:

    We knew what we needed to do with the ply end sheets on LMS van M 517317, but before we could make a start it was a case of being 'Pickfords' and moving stuff about so that we had a clean area to work in! :)

    That done, it was a case of concentrating on the country end north side sheet....... the main aims of the day were, to get the opening for the vent grille cut out amd also trial fit the damn thing!........

    First job though was to dot bits of marine grade foam on the corrugation, the aim being that once the sheet is bolted on and pulled in, there will be a gap between board and corrugation to aid circulation of air........

    That done, it was time to measure up the vent grille and then offer up the ply, resting on noggins to find where we needed to mark out where to cut.......... :Nailbiting:

    Before we got any futher, it was time to catch the company transport down to Ropley, pay up my subs and get back to base....... even at early doors for the ULS open day, it was busy with plenty of folks showing an interest in the progress on 499 and the society! :Saywhat:

    At least my Ropley Spy should be happy that for a change, it wasn't just one man and his dog that turned up........ :rolleyes: ;) :)

    Back at base at after lunch, muggin's and his mucker bit the bullet and got the ply out of the van and on to saw horses....... marked out the cutting lines...... checked cutting lines..... readjusted cutting lines..... set up a guide...... took a deep breath and took a saw to the ply........

    Remember, we only have one chance at this, hence the slow progress, with lots of measuring and conflabs..........

    So once the reveal for the vent grille was cut, the ply was carefully manhandled back into the van, and with some trepidation offered up......... and to our utter amazement, it was a perfect fit!!!! :Jawdrop: :Jawdrop: :Jawdrop:

    After a celebratory brew, the final job of the day was to first fix the damn thing - the easiest job we've had in the whole process so far! :)

    Now that the first sheet of ply is in place, it means we've fianlly turned a corner into putting this van back together, as now the country end north side cladding can be trial fitted........ :eek: :)

    Nice to see the trains busy yesterday, and @Stinch was certainly having fun on 5239!

    https://www.flickr.com/photos/duty_druid/53017575608/in/dateposted-public/

    https://www.flickr.com/photos/duty_druid/53017255789/in/dateposted-public/

    https://www.flickr.com/photos/duty_druid/53017576223/in/dateposted-public/

    Ply sheet in situ - only three more to go!!!

    20230701_162154.jpg
     
    green five, Johnme101, Nick C и 2 другим нравится это.
  11. Nick C

    Nick C Well-Known Member

    Дата регистрации:
    5 июл 2018
    Сообщения:
    1.562
    Симпатии:
    1.826
    Пол:
    Мужской
    Адрес:
    Hampshire
    Heritage Railway Volunteer:
    Yes I am an active volunteer
    It was good to catch up with you on Saturday for a proper natter @Duty Druid - and to see what the Urie society have achieved - 499 is coming on well!
     
  12. WesternRegionHampshireman

    WesternRegionHampshireman Well-Known Member

    Дата регистрации:
    25 сен 2021
    Сообщения:
    1.188
    Симпатии:
    222
    Пол:
    Мужской
    Адрес:
    Hampshire
    Heritage Railway Volunteer:
    No I do not currently volunteer
    What's happening with 35005 and 75079?
    Thought they would be out by now.
     
  13. 1729

    1729 New Member

    Дата регистрации:
    14 авг 2019
    Сообщения:
    54
    Симпатии:
    42
    Адрес:
    Hampshire
    Heritage Railway Volunteer:
    Yes I am an active volunteer
    All in good time with loco restoration's, they are going very quickly with 75079 and 35005 is quite a job. plus no 1, the peckett and general works. There's always a lot going on

    They will be outshopped when they are ready and properly
     
  14. Alan Kebby

    Alan Kebby Well-Known Member

    Дата регистрации:
    18 сен 2019
    Сообщения:
    1.198
    Симпатии:
    1.253
    Пол:
    Мужской
    Адрес:
    Brighton
    Heritage Railway Volunteer:
    No I do not currently volunteer
    A very valid point, but the motive power requirements of the railway also need to be taken into account.

    Most railways will have a motive power plan, i.e a target to complete locomotive X by a certain date to replace locomotive Y when it comes out of service. It can sometimes be a moving target, but there is usually a bit morc planning than ‘it will be ready when it’s ready’.
     
  15. Nick C

    Nick C Well-Known Member

    Дата регистрации:
    5 июл 2018
    Сообщения:
    1.562
    Симпатии:
    1.826
    Пол:
    Мужской
    Адрес:
    Hampshire
    Heritage Railway Volunteer:
    Yes I am an active volunteer
    And most railways have found such plans thrown in the air by certain events over the last three years...
     
    Big Al и Hampshire Unit нравится это.
  16. Alan Kebby

    Alan Kebby Well-Known Member

    Дата регистрации:
    18 сен 2019
    Сообщения:
    1.198
    Симпатии:
    1.253
    Пол:
    Мужской
    Адрес:
    Brighton
    Heritage Railway Volunteer:
    No I do not currently volunteer
    True, so they have to re plan, perhaps bringing in locos on hire instead. But there always a plan of some sort.
     
  17. martin1656

    martin1656 Nat Pres stalwart Friend

    Дата регистрации:
    8 дек 2014
    Сообщения:
    19.433
    Симпатии:
    12.629
    Пол:
    Мужской
    Адрес:
    St Leonards
    Heritage Railway Volunteer:
    No I do not currently volunteer
    things are taking longer because of covid, and the knock on problems, such as shortage of people with the skills, required not every person who might want to offer their services has the skills needed to be able to move engines on, theres the costs also, everything is more expensive year on year, 75079 is a Barry restoration, so many things have to be made new, and the time when you could overhaul an engine in 2 years, has long since gone, as more is done each time, to overhaul each time. 35005, the engine mechanically is nearly finished, its the boiler thats holding things up, its needed far more work than first thought,
     
  18. Dunfanaghy Road

    Dunfanaghy Road Well-Known Member

    Дата регистрации:
    9 окт 2019
    Сообщения:
    1.421
    Симпатии:
    1.818
    Пол:
    Мужской
    Род занятий:
    Retired
    Адрес:
    Alton, Hants
    Heritage Railway Volunteer:
    Yes I am an active volunteer
    Overhauls take time, a degree of crystal-ball gazing is sometimes necessary to foresee when they are completed. Anything in progress in January 2020 will be 6 to 12 months behind where it was planned to be.
    76017 had (I think) 4 years of boiler life and the railway had a reasonable expectation of making use of it. Oh dear!
    (Harold Macmillan's quote, about the fate of the best-laid plans: 'Events, dear boy, events' says it all.)
    It won't help matters that the boiler ship lost a time-served apprentice to specialist firm a few weeks ago, and the shop foreman has also left.
    Pat
     
  19. Shaggy

    Shaggy Part of the furniture

    Дата регистрации:
    5 мар 2009
    Сообщения:
    2.530
    Симпатии:
    2.428
    Пол:
    Мужской
    Адрес:
    72B
    Heritage Railway Volunteer:
    No I do not currently volunteer
  20. Hampshire Unit

    Hampshire Unit Well-Known Member Friend

    Дата регистрации:
    16 янв 2012
    Сообщения:
    1.605
    Симпатии:
    3.475
    Пол:
    Мужской
    Род занятий:
    Carer, Gardener
    Адрес:
    Alresford
    Heritage Railway Volunteer:
    Yes I am an active volunteer
    Shaggy, Bluenosejohn, ax1709cjm и 7 другим нравится это.

Поделиться этой страницей