LE Movements, ECS and Test Runs 2020

Discussion in 'What's Going On' started by mike1522, Dec 24, 2019.

  1. martin1656

    martin1656 Nat Pres stalwart Friend

    Joined:
    Dec 8, 2014
    Messages:
    17,609
    Likes Received:
    11,223
    Gender:
    Male
    Location:
    St Leonards
    Heritage Railway Volunteer:
    No I do not currently volunteer
    if the onboard stewardess were clones of 7 of 9, then, I would not put up any resistance at all, :)
     
    gwalkeriow, Haighie and green five like this.
  2. Ploughman

    Ploughman Part of the furniture

    Joined:
    Apr 1, 2008
    Messages:
    5,806
    Likes Received:
    2,649
    Occupation:
    Ex a lot of things.
    Location:
    Near where the 3 Ridings meet
    Heritage Railway Volunteer:
    Yes I am an active volunteer
    From a PW point of view, if the BORG controlled the tracks and got rid of the trains then we could get on and renew everything.
    Even less faults and delays.:):)
     
  3. mrKnowwun

    mrKnowwun Part of the furniture

    Joined:
    Oct 22, 2011
    Messages:
    4,333
    Likes Received:
    2,758
    Occupation:
    Retired
    Location:
    West Byfleet
    Heritage Railway Volunteer:
    No I do not currently volunteer
    Seen the vids, thought they had done a good job TBH, it looks stunning and a little like the pullman and I'm delighted that 43's can live on doing stuff like this. It needs buffers tho.
     
    green five likes this.
  4. DismalChips

    DismalChips Member

    Joined:
    Apr 11, 2016
    Messages:
    636
    Likes Received:
    657
    Location:
    9A
    Heritage Railway Volunteer:
    No I do not currently volunteer
    Just said precisely this on the other thread. The buffers are the missing element.
     
  5. free2grice

    free2grice Part of the furniture Friend

    Joined:
    Sep 19, 2005
    Messages:
    5,283
    Likes Received:
    2,650
    Gender:
    Male
    Occupation:
    Retired Rolls-Royce engineer
    Location:
    Bath Green Park / Mangotsfield
    Heritage Railway Volunteer:
    No I do not currently volunteer
    As is shown here.
    https://upload.wikimedia.org/wikipedia/commons/3/32/43468_at_London_Kings_Cross.jpg

    ''In 1987, as electrification of the East Coast Main Line was under way, British Rail realised that the new Mark 4 carriages for the Class 89 and Class 91 locomotives were not going to be finished in time for the introduction of electric services on the East Coast Main Line so, in late 1987, a total of eight Eastern Region power cars (Numbers 43013/014/065/067/068/080/084/123) conversions (on 43014/123) were carried out at the Derby Engineering Development Unit, whilst the other six (43013/065/067/068/080/084) were converted by the diesel repair shop at Stratford to have the lower valancing removed and buffers fitted.
    After being fitted with buffers, these power cars began work as surrogate DVTs to work with the Class 91s and 89. The locomotives, working with conventional Mk3 stock, worked on the line between 1987 and 1991, when the last Class 91 locomotives entered service. As well as buffers being fitted to these powercars, special remote control equipment was also added to the locomotives so they could be controlled by the locomotive at the front''. <BJ>
     
  6. MellishR

    MellishR Resident of Nat Pres Friend

    Joined:
    Apr 16, 2009
    Messages:
    8,068
    Likes Received:
    5,165
    Why did an HST power car running as a DVT need buffers while one running as part of an HST set did not? Isn't the need to couple to another loco in abnormal circumstances equally likely or unlikely in both cases?

    Anyway I agree that the ersatz Blue Pullman looks good. I look forward to a ride when it's legal and I can feel safe.
     
  7. John2

    John2 Member

    Joined:
    Sep 3, 2007
    Messages:
    202
    Likes Received:
    59
    At the time, locomotives fitted with drop-head buckeye couplings could not be attached to ordinary HST power cars using the standard bar coupling carried on power cars so if the TDM wasn't working the loco couldn't be coupled to the London end of the train. Subsequently, a new bar coupling was developed that would fit buckeye fitted locos.
     
  8. MellishR

    MellishR Resident of Nat Pres Friend

    Joined:
    Apr 16, 2009
    Messages:
    8,068
    Likes Received:
    5,165
    Thank you. That makes sense. Presumably TDM failure, requiring a loco to be attached at the DVT end, was more likely than failure of the front power unit of an HST in combination with failure of the control link to the rear power car.
     
  9. Robin

    Robin Well-Known Member Friend

    Joined:
    May 7, 2012
    Messages:
    1,393
    Likes Received:
    1,747
    Location:
    Stourbridge
    3ABescot likes this.
  10. Deepgreen

    Deepgreen Well-Known Member Friend

    Joined:
    Jul 30, 2010
    Messages:
    1,792
    Likes Received:
    1,144
    Gender:
    Male
    Occupation:
    Early retirement! (Ex-Business Improvement, LU).
    Location:
    Betchworth, Surrey
    Heritage Railway Volunteer:
    No I do not currently volunteer
  11. green five

    green five Resident of Nat Pres

    Joined:
    Apr 30, 2006
    Messages:
    6,596
    Likes Received:
    2,242
    Gender:
    Male
    Location:
    Hampshire
    Heritage Railway Volunteer:
    No I do not currently volunteer
    Does anyone know if 45596 passed her fitness to run exam for tomorrow's move back to the KWVR? Hoping to see her tomorrow morning.

    Sent from my I3312 using Tapatalk
     
  12. Bodorganboy

    Bodorganboy Member

    Joined:
    Mar 17, 2017
    Messages:
    523
    Likes Received:
    1,223
    Gender:
    Male
    Location:
    Lancaster
    Heritage Railway Volunteer:
    No I do not currently volunteer
    If it runs will it get past Carnforth. The line has been closed all day due to flooding. At various places including Melling tunnel and Wennington
     
  13. green five

    green five Resident of Nat Pres

    Joined:
    Apr 30, 2006
    Messages:
    6,596
    Likes Received:
    2,242
    Gender:
    Male
    Location:
    Hampshire
    Heritage Railway Volunteer:
    No I do not currently volunteer
    Is there an alternative route they can use or could they stable 45596 at Carnforth for a while until she can make it back to the KWVR?

    The Alton line also had a number of cancellations today as shown on RTT. Caused by the weather conditions I guess.

    Sent from my I3312 using Tapatalk
     
  14. jonathonag

    jonathonag Well-Known Member

    Joined:
    May 11, 2006
    Messages:
    1,589
    Likes Received:
    3,009
    Occupation:
    Railway Engineer
    Location:
    Cowdenbeath
    Take a right turn before Preston, wee skirmish round Blackburn and a reversal at Hellifield?
     
  15. 46223

    46223 Resident of Nat Pres Friend

    Joined:
    Apr 10, 2011
    Messages:
    6,376
    Likes Received:
    5,750
    Gender:
    Male
    Location:
    Lancs
    Heritage Railway Volunteer:
    No I do not currently volunteer
    Or Copy Pit, Calder Valley, Normanton, and Leeds?
     
  16. green five

    green five Resident of Nat Pres

    Joined:
    Apr 30, 2006
    Messages:
    6,596
    Likes Received:
    2,242
    Gender:
    Male
    Location:
    Hampshire
    Heritage Railway Volunteer:
    No I do not currently volunteer
    It looks like the positioning move back to the KWVR is going ahead with 45596 as it has been activated on RTT:

    TRUST ID 875Z961A03

    Activated 02/11/2020 23:51







    Sent from my I3312 using Tapatalk
     
  17. osprey

    osprey Resident of Nat Pres

    Joined:
    Oct 3, 2007
    Messages:
    9,357
    Likes Received:
    2,313
    Occupation:
    semi-retired, currently doing R&D for my patents
    Location:
    Halifax
    Yes please...
     
  18. Bodorganboy

    Bodorganboy Member

    Joined:
    Mar 17, 2017
    Messages:
    523
    Likes Received:
    1,223
    Gender:
    Male
    Location:
    Lancaster
    Heritage Railway Volunteer:
    No I do not currently volunteer
    The only problem with that option is that the engine would arrive tender first at Keighley, the same if it ran via Leeds
     
  19. Will RL

    Will RL Member

    Joined:
    Jun 12, 2017
    Messages:
    714
    Likes Received:
    1,060
    Location:
    Midlands
    Heritage Railway Volunteer:
    Yes I am an active volunteer
    If only there was some way of turning Bahamas on arrival...
     
  20. Dan Hamblin

    Dan Hamblin Part of the furniture

    Joined:
    Mar 27, 2006
    Messages:
    2,544
    Likes Received:
    181
    Occupation:
    Rolling Stock Engineer
    Location:
    Kent
    By good fortune I'm at Acton Works today looking at S Stock gearboxes, so hopefully can nip out and see it later.

    Don't forget the route might be constrained by in date gauging assessments. Hence going via Carnforth.

    Regards,

    Dan
     