    4709 has a new/updated website. https://www.4709.org.uk/
     
  2. jnc

    jnc Well-Known Member

    Joined:
    Apr 3, 2012
    Messages:
    1,511
    Likes Received:
    2,706
    Gender:
    Male
    Location:
    Western Atlantic
    Heritage Railway Volunteer:
    No I do not currently volunteer
    That's been around for a while, but it does seem to have been re-organized; my bookmarked Latest News page there seems to have disappeared. The new blog page is a welcome addition/replacement, though. Good news about the cylinder patterns!

    Noel
     
    240P15, Kinghambranch and Nick C like this.
  3. GWR4707

    GWR4707 Nat Pres stalwart

    Joined:
    May 12, 2006
    Messages:
    18,044
    Likes Received:
    15,733
    Gender:
    Male
    Location:
    Cumbria
    Heritage Railway Volunteer:
    No I do not currently volunteer
    Hence I added 'updated', although unhelpfully it doesn't give any details that I can see of explaining how visitors can support the project unlike its predecessor.
     
    jnc likes this.
  4. MellishR

    MellishR Resident of Nat Pres Friend

    Joined:
    Apr 16, 2009
    Messages:
    8,068
    Likes Received:
    5,164
    Each item is dated, but only by month and day, with no indication of year. For example "Sat at Didcot for decades, 4709’s tender will soon return, coupled to our 2-8-0 monster" is dated MAR 5. Obviously not this year, but was it 2019 or earlier?
     
  5. aron33

    aron33 Member

    Joined:
    May 22, 2016
    Messages:
    437
    Likes Received:
    563
    Gender:
    Male
    Location:
    United States
    Heritage Railway Volunteer:
    No I do not currently volunteer
    Hi everyone. I’m back, and am safe at the moment.
    I’m sure everyone knows of the current situation regarding Covid-19 and the impact it is having on the Heritage Railway scene.
     
    240P15 likes this.
  6. Richard Roper

    Richard Roper Well-Known Member

    Joined:
    May 22, 2006
    Messages:
    1,310
    Likes Received:
    1,355
    Gender:
    Male
    Occupation:
    Librarian
    Location:
    Just up the road from 56E Sowerby Bridge
    Heritage Railway Volunteer:
    No I do not currently volunteer
    Excellent! A couple of questions:

    1. What are the cylinders off which are shown in the photo on the blog?
    2. Where will 4709 be moving to?

    Good Luck with the project once all this Covid 19 stuff is over!

    Richard.
     
  7. aron33

    aron33 Member

    Joined:
    May 22, 2016
    Messages:
    437
    Likes Received:
    563
    Gender:
    Male
    Location:
    United States
    Heritage Railway Volunteer:
    No I do not currently volunteer
    1. Those are the patterns for the cylinders, and
    2: I do not know.
     
  8. Richard Roper

    Richard Roper Well-Known Member

    Joined:
    May 22, 2006
    Messages:
    1,310
    Likes Received:
    1,355
    Gender:
    Male
    Occupation:
    Librarian
    Location:
    Just up the road from 56E Sowerby Bridge
    Heritage Railway Volunteer:
    No I do not currently volunteer
    No, I was meaning the cylinders in this photo:

    Richard.
    _PSF7092.jpg
     
    240P15 likes this.
  9. ghost

    ghost Part of the furniture

    Joined:
    May 29, 2006
    Messages:
    3,967
    Likes Received:
    5,064
    Gender:
    Male
    Location:
    N.Ireland
    Heritage Railway Volunteer:
    Yes I am an active volunteer
    2861

    Keith
     
    jnc and Richard Roper like this.
  10. Richard Roper

    Richard Roper Well-Known Member

    Joined:
    May 22, 2006
    Messages:
    1,310
    Likes Received:
    1,355
    Gender:
    Male
    Occupation:
    Librarian
    Location:
    Just up the road from 56E Sowerby Bridge
    Heritage Railway Volunteer:
    No I do not currently volunteer
    Aha! Cheers Keith, it makes sense now - The new smokebox won't fit the saddle on 2861's cylinder block, it's a larger diameter.

    Richard.
     
  11. ghost

    ghost Part of the furniture

    Joined:
    May 29, 2006
    Messages:
    3,967
    Likes Received:
    5,064
    Gender:
    Male
    Location:
    N.Ireland
    Heritage Railway Volunteer:
    Yes I am an active volunteer
    They have changed the plan now and are having new cylinders cast to the original design.

    Keith
     
    Richard Roper likes this.
  12. MellishR

    MellishR Resident of Nat Pres Friend

    Joined:
    Apr 16, 2009
    Messages:
    8,068
    Likes Received:
    5,164
    Two questions:
    If the cylinders from 2861 are now not going to be used, why are they still attached to the frames in that picture?
    And is the plan still to fit a No. 7 boiler in the fullness of time (with the saddle on the new castings dimensioned accordingly) and to make a temporary arrangement to take a No. 1 boiler?
     
  13. 60044

    60044 Member

    Joined:
    Feb 24, 2016
    Messages:
    406
    Likes Received:
    785
    Gender:
    Male
    Location:
    Salisbury
    Heritage Railway Volunteer:
    Yes I am an active volunteer
    I think it hasbeen announced that they have now decided to go for a new No. 7 boiler.
     
  14. ghost

    ghost Part of the furniture

    Joined:
    May 29, 2006
    Messages:
    3,967
    Likes Received:
    5,064
    Gender:
    Male
    Location:
    N.Ireland
    Heritage Railway Volunteer:
    Yes I am an active volunteer
    As far as I am aware the plan is to build a new No7 boiler which would then fit the new build original design cylinders/saddle. I don't think they are going to use the No1 boiler now. I assume the cylinders are still in the frames for rigidity purposes and maybe some measurements, until such time that the new cylinders are cast, machined and can be swapped in.

    Keith
     
  15. Thompson1706

    Thompson1706 Part of the furniture

    Joined:
    Nov 19, 2007
    Messages:
    2,438
    Likes Received:
    1,844
    Gender:
    Male
    Occupation:
    Retired
    Location:
    Rhiwabon
    Heritage Railway Volunteer:
    Yes I am an active volunteer
    The cylinders shown in the photograph aren't physically attached, just held in place by gravity.

    Bob.
     
    ghost likes this.
  16. Gav106

    Gav106 Well-Known Member

    Joined:
    Mar 29, 2010
    Messages:
    1,741
    Likes Received:
    2,017
    Location:
    Nantwich, Cheshire
    Out of interest, how much a year are the 4709 group currently raising?
     
  17. Hunslet589

    Hunslet589 New Member

    Joined:
    Mar 19, 2017
    Messages:
    122
    Likes Received:
    204
    Gender:
    Male
    Location:
    Oxfordshire
    Heritage Railway Volunteer:
    Yes I am an active volunteer
    To reiterate what was posted back in May of last year :

    Cylinders:
    While the original intent was to use the spare castings from 2861 plans have changed. First off the pair need to be split to allow confirmation of the integrity of each. The possibility exists of finding something nasty in which case all the effort is wasted ..

    Assuming all is OK the block still has problems as it stands:
    • As said, the curvature of the saddle is wrong for the no7 boiler (see below),
    • The boiler pitch is too high for the NR loading gauge - about 2 inches needs to be removed
    • Once you have done that the block is still too wide for the NR loading gauge severely restricting main line usage - if any.
    So a lot of work to make the existing block usable and the decision was taken to go for new with a few detail changes to take care of these problems. The latest newsletter shows the poly patterns for these complete and the casting of the new blocks was apparently only a few days away when the foundry shut down due to the virus situation.

    The 28xx blocks are probably still on the frames as having been in position to help with the setting up of the extension frames etc, there has, to date, been no need to remove them - and wont be until the replacements are ready in due course/eventually.

    Boiler:
    The available no1 boiler is in ex Barry condition with all that this entails. It could require a lot spending on it to make it serviceable and probably more at the first 10 year overhaul and more after that. New boilers are currently under construction for other projects so the capacity has been proven to exist. Hence the decision has been made to go for a new no 7 boiler and ensure (hopefully) a trouble free period of operation. So the plan to use the no1 boiler even as a temporary measure has been dropped.

    M
     
  18. Richard Roper

    Richard Roper Well-Known Member

    Joined:
    May 22, 2006
    Messages:
    1,310
    Likes Received:
    1,355
    Gender:
    Male
    Occupation:
    Librarian
    Location:
    Just up the road from 56E Sowerby Bridge
    Heritage Railway Volunteer:
    No I do not currently volunteer
    Thank you for this!

    So, is the boiler centreline actually going to be lowered by 2" from original then, or is it sat at the correct height when using the new cylinders / saddle?

    Sorry for all the questions!

    Richard.
     
  19. class8mikado

    class8mikado Part of the furniture

    Joined:
    Jun 1, 2009
    Messages:
    3,610
    Likes Received:
    1,438
    Occupation:
    Print Estimator/ Repository of Useless Informatio.
    Location:
    Bingley W.Yorks.
    Heritage Railway Volunteer:
    No I do not currently volunteer
    Is the no 7 boiler similar in size to the castle boiler ?
     
  20. Jimc

    Jimc Part of the furniture

    Joined:
    Sep 8, 2005
    Messages:
    4,052
    Likes Received:
    4,665
    Occupation:
    Once computers, now part time writer I suppose.
    Location:
    SE England
    Heritage Railway Volunteer:
    No I do not currently volunteer
    Bigger. The Castle boiler is basically a Standard 7 with a reduced diameter barrel to get the weight down.
     

Share This Page