If you register, you can do a lot more. And become an active part of our growing community. You'll have access to hidden forums, and enjoy the ability of replying and starting conversations.

Rother Valley Railway

الموضوع في 'Heritage Railways & Centres in the UK' بواسطة nine elms fan, بتاريخ ‏4 نوفمبر 2012.

  1. martin1656

    martin1656 Nat Pres stalwart Friend

    إنضم إلينا في:
    ‏8 ديسمبر 2014
    المشاركات:
    19,435
    عدد المعجبين:
    12,633
    الجنس:
    ذكر
    مكان الإقامة:
    St Leonards
    Heritage Railway Volunteer:
    No I do not currently volunteer
    I can't think of anywhere that may have enough space to install it, without buying up some more somewhere, best place would be Tenterden, if some land can be acquired just beyond the C&W Workshop be ideal then for evening out wear on flanges etc, and turning the odd visiting engine from the Main line . either that, or at Robertsbridge, but I would imagine there is no spare space .
     
  2. Mark Thompson

    Mark Thompson Well-Known Member

    إنضم إلينا في:
    ‏10 سبتمبر 2017
    المشاركات:
    1,666
    عدد المعجبين:
    4,129
    الجنس:
    ذكر
    مكان الإقامة:
    E sussex
    Heritage Railway Volunteer:
    No I do not currently volunteer
    Reading the blog, the RVR seem to have a plan, which is hardly surprising, but they're going to reveal it in bite-sized installments!
     
  3. Miff

    Miff Part of the furniture Friend

    إنضم إلينا في:
    ‏17 جوان 2008
    المشاركات:
    3,043
    عدد المعجبين:
    3,122
    Intriguing :) Would there be enough room in the proposed expansion of Rolvenden (K&ESR already own an adjacent field)? Or will it fit on the small ‘engine shed’ site in the Robertsbridge plans?
     
  4. class8mikado

    class8mikado Part of the furniture

    إنضم إلينا في:
    ‏1 جوان 2009
    المشاركات:
    3,858
    عدد المعجبين:
    1,656
    الوظيفة:
    Print Estimator/ Repository of Useless Informatio.
    مكان الإقامة:
    Bingley W.Yorks.
    Heritage Railway Volunteer:
    No I do not currently volunteer
    60footer ?
     
  5. H Cloutt

    H Cloutt Well-Known Member

    إنضم إلينا في:
    ‏22 ديسمبر 2018
    المشاركات:
    1,036
    عدد المعجبين:
    1,505
    الجنس:
    ذكر
    مكان الإقامة:
    Battle
    Heritage Railway Volunteer:
    No I do not currently volunteer
    A picture of part of the turntable on a heavy transport vehicle appears on the RVR blog. So it must be on its way somewhere. We will just have to wait and see.
     
    أعجب بهذه المشاركة jnc
  6. nine elms fan

    nine elms fan Part of the furniture

    إنضم إلينا في:
    ‏18 سبتمبر 2012
    المشاركات:
    2,439
    عدد المعجبين:
    855
    الجنس:
    ذكر
    الوظيفة:
    Retired
    مكان الإقامة:
    Wessex
    Heritage Railway Volunteer:
    No I do not currently volunteer
    See post 1240.
     
    أعجب بهذه المشاركة H Cloutt
  7. H Cloutt

    H Cloutt Well-Known Member

    إنضم إلينا في:
    ‏22 ديسمبر 2018
    المشاركات:
    1,036
    عدد المعجبين:
    1,505
    الجنس:
    ذكر
    مكان الإقامة:
    Battle
    Heritage Railway Volunteer:
    No I do not currently volunteer
    According to a post on the RVR blog it's 70feet.
     
  8. martin1656

    martin1656 Nat Pres stalwart Friend

    إنضم إلينا في:
    ‏8 ديسمبر 2014
    المشاركات:
    19,435
    عدد المعجبين:
    12,633
    الجنس:
    ذكر
    مكان الإقامة:
    St Leonards
    Heritage Railway Volunteer:
    No I do not currently volunteer
    that's going to need one very big hole digging
     
    أعجب بهذه المشاركة H Cloutt
  9. weltrol

    weltrol Part of the furniture Friend

    إنضم إلينا في:
    ‏29 ديسمبر 2008
    المشاركات:
    2,844
    عدد المعجبين:
    688
    That'll give plenty of materials for rebuilding a missing embankment somewhere....;)
     
    أعجب بهذه المشاركة H Cloutt
  10. martin1656

    martin1656 Nat Pres stalwart Friend

    إنضم إلينا في:
    ‏8 ديسمبر 2014
    المشاركات:
    19,435
    عدد المعجبين:
    12,633
    الجنس:
    ذكر
    مكان الإقامة:
    St Leonards
    Heritage Railway Volunteer:
    No I do not currently volunteer
    I heard the new plan is to build a ribblehead style viaduct across the A21, across to Austins bridge, and to build a great spiral to raise the track height ;)
     
    H Cloutt, Wenlock و burnham-t معجبون بهذا.
  11. Miff

    Miff Part of the furniture Friend

    إنضم إلينا في:
    ‏17 جوان 2008
    المشاركات:
    3,043
    عدد المعجبين:
    3,122
    How about a combined level crossing and turntable on the A21? :) Utterly pointless but wouldn’t it be nice?
     
    أعجب بهذه المشاركة Wenlock
  12. Steve

    Steve Resident of Nat Pres Friend

    إنضم إلينا في:
    ‏7 اكتوبر 2006
    المشاركات:
    12,823
    عدد المعجبين:
    12,020
    الوظيفة:
    Gentleman of leisure, nowadays
    مكان الإقامة:
    Near Leeds
    Heritage Railway Volunteer:
    Yes I am an active volunteer
    You could always install it in the roundabout on the A21. That would save on land use. ;)
     
    Hampshire Unit, H Cloutt, pmh_74 و 7 آخرون معجبون بهذا.
  13. martin1656

    martin1656 Nat Pres stalwart Friend

    إنضم إلينا في:
    ‏8 ديسمبر 2014
    المشاركات:
    19,435
    عدد المعجبين:
    12,633
    الجنس:
    ذكر
    مكان الإقامة:
    St Leonards
    Heritage Railway Volunteer:
    No I do not currently volunteer
    Actually, whilst the installation of the level crossing , if it goes ahead, ( not counting chickens etc) there will need to be a diversion in place won't there, I would assume then that traffic will have to use the old A21 through Roberts bridge re joining at Northbridge St.
     
    أعجب بهذه المشاركة H Cloutt
  14. H Cloutt

    H Cloutt Well-Known Member

    إنضم إلينا في:
    ‏22 ديسمبر 2018
    المشاركات:
    1,036
    عدد المعجبين:
    1,505
    الجنس:
    ذكر
    مكان الإقامة:
    Battle
    Heritage Railway Volunteer:
    No I do not currently volunteer
    When KESR replaced the level crossing at Rolvenden - this was done overnight - they used some sort of prefabricated unit with the rails already installed. I suspect that RVR will use something similar to get the trackbed in place - so there may not be too much disruption. The barriers would be installed seperately. I suspect that the level crossing at Junction Road will be installed first.
     
    أعجب بهذه المشاركة jnc
  15. martin1656

    martin1656 Nat Pres stalwart Friend

    إنضم إلينا في:
    ‏8 ديسمبر 2014
    المشاركات:
    19,435
    عدد المعجبين:
    12,633
    الجنس:
    ذكر
    مكان الإقامة:
    St Leonards
    Heritage Railway Volunteer:
    No I do not currently volunteer
    I would imagine the work will be much harder and possibly take longer than just one night, for starters the road has to be dug out, and any cables etc re routed, at rolvendon, the old crossing only had to be removed and any reworking done, at Junction Rd, its all got to be done fresh, from scratch, even using modern methods, can the road be dug up levelled and the track laid all in one night, ? On the A21, I would imagine, that the road will have to be closed overnight with diversions In place, anyway, possibly for more than just the one overnight period, as later installing and testing Barriers will have to be done also and that will need another localised road closure .
     
    أعجب بهذه المشاركة Wenlock
  16. Jamessquared

    Jamessquared Nat Pres stalwart

    إنضم إلينا في:
    ‏8 مارس 2008
    المشاركات:
    28,043
    عدد المعجبين:
    65,681
    مكان الإقامة:
    LBSC 215
    Heritage Railway Volunteer:
    Yes I am an active volunteer
    With most things in infrastructure, you can work incredibly quickly provided you throw sufficient resource at it, and have planned adequately. So a single night to install the rails across the road wouldn't seem beyond reasonable to me - after all, you are really only talking about digging out a road and resurfacing for a length of twenty feet or so to cover the width of the railway. I don't know exactly how you commission a new level crossing (presumably there is systems testing on the interface between road and railway signals, and the signals / hardware interface of the actual infrastructure) but I suspect some of that could be done without a closure, and any final proving could happen over one or more nights.

    All of which is funding-dependent of course (who pays for that sort of work - the railway or the Highways Authority?), and of course also dependent on a huge amount of advance planning so that the actual disruption is minimised.

    Tom
     
    35B و Steve معجبون بهذا.
  17. Steve

    Steve Resident of Nat Pres Friend

    إنضم إلينا في:
    ‏7 اكتوبر 2006
    المشاركات:
    12,823
    عدد المعجبين:
    12,020
    الوظيفة:
    Gentleman of leisure, nowadays
    مكان الإقامة:
    Near Leeds
    Heritage Railway Volunteer:
    Yes I am an active volunteer
    As you say, planning is the key. Putting the actual crossing in wouldn’t be a big job You can commission the crossing system without the actual barrier arms in place, only fitting these when all else is done.
     
    أعجب بهذه المشاركة Jamessquared
  18. Dunfanaghy Road

    Dunfanaghy Road Well-Known Member

    إنضم إلينا في:
    ‏9 اكتوبر 2019
    المشاركات:
    1,422
    عدد المعجبين:
    1,818
    الجنس:
    ذكر
    الوظيفة:
    Retired
    مكان الإقامة:
    Alton, Hants
    Heritage Railway Volunteer:
    Yes I am an active volunteer
    "An Historical Survey of Southern Sheds" by Hawkins & Reeve gives 65ft. It would have been new for opening in 1933. When I saw it in the late 90s it was out of use.
    Pat
     

    الملفات المرفقة:

    • CNV00190.JPG
      CNV00190.JPG
      حجم الملف:
      105.7 ك. ب
      المشاهدات:
      78
    • CNV00189.JPG
      CNV00189.JPG
      حجم الملف:
      94 ك. ب
      المشاهدات:
      81
    garth manor و nine elms fan معجبون بهذا.
  19. Ploughman

    Ploughman Part of the furniture

    إنضم إلينا في:
    ‏1 إبريل 2008
    المشاركات:
    5,986
    عدد المعجبين:
    2,767
    الوظيفة:
    Ex a lot of things.
    مكان الإقامة:
    Near where the 3 Ridings meet
    Heritage Railway Volunteer:
    Yes I am an active volunteer
    It is the service provision that wil take the time.
    As has been said the actual Dig, Relay and ballasting and installing of a form of crossing system.
    Bomac panels or Rubber preformed sections more likely.
    That can be done in a reasonable length of possession.
    We used to reballast with 300mm ballast below the sleepers and renew rails and Rubber panels between 22.00 and 09.00 but that would have been about 4 - 5 lengths to get an overlap into the existing either side of the crosing.
    With the RVR crossing it may be possible to cut that length down to about 30ft either side of the crossing.
     
    Steve و jnc معجبون بهذا.
  20. paul1609

    paul1609 New Member

    إنضم إلينا في:
    ‏9 جوان 2006
    المشاركات:
    80
    عدد المعجبين:
    127
    الجنس:
    ذكر
    مكان الإقامة:
    Wittersham, Isle of Oxney
    Heritage Railway Volunteer:
    Yes I am an active volunteer

مشاركة هذه الصفحة