Narrow Gauge Track Specification - AVR

Rasprava u 'Narrow Gauge Railways' pokrenuta od W.Williams, 13. Studeni 2019..

  1. W.Williams

    W.Williams Well-Known Member

    Pridružen(a):
    20. Prosinac 2015.
    Poruka:
    1,658
    Lajkova:
    1,572
    Interesi:
    Mechanical Engineer
    Grad:
    Aberdeenshire
    Heritage Railway Volunteer:
    Yes I am an active volunteer
    The Alford Valley Railway (AVR) in Aberdeenshire are looking to get the track back to a reasonable condition as I understand it. Iv pitched in my support through advice but I need some help.

    Is there a generally accepted standard for narrow gauge track specification?

    My initial thought was 16”-24” ballast depth with sleepers spaced at 18”.

    Is that right? What do the other narrow gauge lines use?
     
  2. Steve

    Steve Resident of Nat Pres Friend

    Pridružen(a):
    7. Listopad 2006.
    Poruka:
    12,830
    Lajkova:
    12,038
    Interesi:
    Gentleman of leisure, nowadays
    Grad:
    Near Leeds
    Heritage Railway Volunteer:
    Yes I am an active volunteer
    Have you got shares in a ballast supplier? ;) Have a look at RSP5 (https://webarchive.nationalarchives...ssets/pdf_file/0015/2634/rsp005-minorrail.pdf) and, in particular clause 46. Sleeper spacing is dependent on axles loads and rail sizes but the usual spacing is 2'-6". As a narrow gauge railway they really need to develop their own standards for track and wheel profiles and, if interchangeability of stock is envisaged, it is sensible to adopt a common standard rather than be unique.
     
    W.Williams and ross like this.
  3. Martin Perry

    Martin Perry Nat Pres stalwart Staff Member Moderator Friend

    Pridružen(a):
    15. Travanj 2006.
    Poruka:
    16,552
    Lajkova:
    7,905
    Grad:
    1012 / 60158
    Heritage Railway Volunteer:
    Yes I am an active volunteer
    I suppose that much depends on what they are planning to run on it.
     
  4. johnofwessex

    johnofwessex Resident of Nat Pres

    Pridružen(a):
    6. Travanj 2015.
    Poruka:
    9,797
    Lajkova:
    7,950
    Spol:
    Muškarac
    Interesi:
    Thorn in my managers side
    Grad:
    72
    Heritage Railway Volunteer:
    No I do not currently volunteer
    What about aproaching some other 2ft guage lines? The Leadhills & Wanlockhead looks like a similar operation to yours?
     
  5. Ploughman

    Ploughman Part of the furniture

    Pridružen(a):
    1. Travanj 2008.
    Poruka:
    5,987
    Lajkova:
    2,767
    Interesi:
    Ex a lot of things.
    Grad:
    Near where the 3 Ridings meet
    Heritage Railway Volunteer:
    Yes I am an active volunteer
    Does that ballast depth include the formation or not?
    On the NYMR we usually opt for approx 150mm / 6 inch of ballast below the sleeper.
    More in some places depending on local conditions, but 16 inch is a bit much.
     
  6. W.Williams

    W.Williams Well-Known Member

    Pridružen(a):
    20. Prosinac 2015.
    Poruka:
    1,658
    Lajkova:
    1,572
    Interesi:
    Mechanical Engineer
    Grad:
    Aberdeenshire
    Heritage Railway Volunteer:
    Yes I am an active volunteer
    Thanks everyone for the feedback, just what I needed.

    As we can see I just picked some numbers out of thin air as I really wasn’t sure where to start.
     