If you register, you can do a lot more. And become an active part of our growing community. You'll have access to hidden forums, and enjoy the ability of replying and starting conversations.

West Somerset Railway - Removal of the PLC Chairman and related matters

Discussion in 'Heritage Railways & Centres in the UK' started by rodders154, Aug 14, 2018.

Thread Status:
Not open for further replies.
  1. Triumph 2500S

    Triumph 2500S Well-Known Member

    Joined:
    Jul 26, 2014
    Messages:
    1,066
    Likes Received:
    933
    Gender:
    Male
    Occupation:
    Retired
    Location:
    Swindon
    Heritage Railway Volunteer:
    No I do not currently volunteer
    Interesting that the Gloucester Warwicks have now increased their number of paid staff to 6 still very different from the 50 employed by the WSR I suggest!

    I am also sure that whilst you make very valid points about the ease of relaying a single line on a double track formation and getting it right in their own time without having to deal with existing services I do believe they would have much preferred to be in the situation of the WSR who have a very compliant landlord so have never had the capital expense and an existing although worn track in place. Add the fact that with its current abysmal record of raising money the WSR could never have had the money to fund it had it been in the same position as the GWR.

    The only parallel I can find between the WSR and the GWR is the skew bridge at Gotherington which was stripped and completely rebuilt on both sides (twin track) including welding pad stone repair shot blasting & painting in deep winter in 10 weeks!! It is the biggest bridge on their line. This is a brilliant illustration of project management at minimum cost within a very limited timescale at the worst time of year.

    http://bridgestobroadway.blogspot.com/2018/03/completion-of-bridge-34.html
     
    Last edited: Aug 30, 2018
    Kinghambranch likes this.
  2. Forestpines

    Forestpines Well-Known Member

    Joined:
    Jun 5, 2009
    Messages:
    1,681
    Likes Received:
    2,438
    Gender:
    Female
    Location:
    Somewhere in the UK
    Heritage Railway Volunteer:
    Yes I am an active volunteer
    The SVR has also managed to relay three substantial stretches of line with flat-bottom CWR in recent years - despite having only a twisty single-line trackbed in which to do it!

    (I do think the GWSR were maybe a bit too literal-minded when they said "we'll have bullhead within Broadway station" - the bullhead track stops literally at the ends of the platforms! So if you look up or down the line to watch a loco running round, all you can see is modern track and modern pointwork stretching off into the distance)
     
    michaelh likes this.
  3. michaelh

    michaelh Part of the furniture

    Joined:
    Apr 29, 2006
    Messages:
    3,080
    Likes Received:
    1,291
    Gender:
    Male
    Occupation:
    Very comfortably early retired
    Location:
    1029
    Heritage Railway Volunteer:
    Yes I am an active volunteer

    And a relay through a long tunnel
     
    Forestpines likes this.
  4. Forestpines

    Forestpines Well-Known Member

    Joined:
    Jun 5, 2009
    Messages:
    1,681
    Likes Received:
    2,438
    Gender:
    Female
    Location:
    Somewhere in the UK
    Heritage Railway Volunteer:
    Yes I am an active volunteer
    Yes, wasn't that the first CWR stretch?
     
  5. Jamessquared

    Jamessquared Nat Pres stalwart

    Joined:
    Mar 8, 2008
    Messages:
    26,101
    Likes Received:
    57,418
    Location:
    LBSC 215
    Heritage Railway Volunteer:
    Yes I am an active volunteer
    I'd suggest it is the short notice that leads to additional expense, not the fact it was overnight. The Bluebell replaced a section of about 200 yards of track last summer doing it in two overnight possessions during the daily running season between trains with almost all volunteer labour. It was planned well in advance though!



    I'm not very close to the infrastructure side on our railway, but the combination of expense, the need to order and get delivered to site considerable quantities of bulky materials, and the need to fit work around availability of volunteers, machinery and within the timetable (either overnight or during winter shutdown periods for more extensive jobs), suggests that it is the kind of thing that probably requires planning as a rolling programme stretching several years in advance, at least in outline. As ever, availability of finance at the right time is key.

    Tom
     
    ghost, nine elms fan and Bluenosejohn like this.
  6. ikcdab

    ikcdab Member Friend

    Joined:
    Dec 12, 2006
    Messages:
    610
    Likes Received:
    1,849
    Gender:
    Male
    Occupation:
    WSRHT Trustee, Journal editor
    Location:
    Taunton
    Heritage Railway Volunteer:
    Yes I am an active volunteer
    Please, these posts are utter nonsense. This thread has a very clear title and those involved deserve that it is treated seriously.
    No more of this rubbish. Let's discuss what's really important.

    Ian Coleby
     
    Last edited: Aug 29, 2018
  7. Greenway

    Greenway Part of the furniture

    Joined:
    Mar 16, 2008
    Messages:
    3,906
    Likes Received:
    3,704
    Gender:
    Male
    Location:
    South Hams
    Heritage Railway Volunteer:
    No I do not currently volunteer
    True, Ian and am I guilty as well. :( However post 451. posted by a WSRA Trustee, started the ball rolling I believe, with a 'Russian' infantryman, jeep and copy of Pravda. The rest is 'history' as they say. :Caffeinefix:
     
  8. Roger Thompson

    Roger Thompson Member

    Joined:
    Aug 18, 2014
    Messages:
    635
    Likes Received:
    1,894
    Gender:
    Male
    Occupation:
    Retired
    Location:
    Warwickshire, formerly Somerset
    Heritage Railway Volunteer:
    Yes I am an active volunteer
    The Severn Valley benefits from a much more populous catchment area, and doesn't have a large expanse of water like the Severn Estuary close by. As a consequence, passenger numbers and revenue are both higher than the WSR, almost 241000 passengers in 2017. The big difference is that the closest equivalent on the SVR to the WSRA, namely the Severn Valley Railway Charitable Trust, donated £345000 to SVR PLC projects in 2017, and £280000 the previous year. Contrast that with the few hundred pounds raised for WSR projects by the WSRA!

    You may ask how I know all this! Well, in spite of my previously being a volunteer on the WSR, and now on the GWSR, my daughter, on joining me one weekend last autumn on a visit to the SVR, picked up a leaflet regarding SVR shareholdiing, and persuaded the rest of the family to join her in purchasing some SVR shares for me as a Christmas present. Hence I have their annual report.
    Sent from my Lenovo TAB 2 A10-70F using Tapatalk
     
  9. gwilialan

    gwilialan Well-Known Member

    Joined:
    Dec 8, 2012
    Messages:
    1,658
    Likes Received:
    3,891
    Gender:
    Male
    Location:
    Out there somewhere
    Heritage Railway Volunteer:
    Yes I am an active volunteer
    Where is this place called 'Ferior'? Can't find it on the map... :rolleyes:
     
    Forestpines likes this.
  10. gwilialan

    gwilialan Well-Known Member

    Joined:
    Dec 8, 2012
    Messages:
    1,658
    Likes Received:
    3,891
    Gender:
    Male
    Location:
    Out there somewhere
    Heritage Railway Volunteer:
    Yes I am an active volunteer
    I'd suggest that was project management at maximum with all trades, access, and programming coordinated to a high degree. Not an easy task with such a short timescale.
     
    jnc and Triumph 2500S like this.
  11. michaelh

    michaelh Part of the furniture

    Joined:
    Apr 29, 2006
    Messages:
    3,080
    Likes Received:
    1,291
    Gender:
    Male
    Occupation:
    Very comfortably early retired
    Location:
    1029
    Heritage Railway Volunteer:
    Yes I am an active volunteer
    Can we see an end to these foolish posts.
     
    Mike S, Geoff May, Keith Sims and 4 others like this.
  12. lochness8

    lochness8 New Member

    Joined:
    Sep 25, 2016
    Messages:
    76
    Likes Received:
    289
    Gender:
    Male
    Occupation:
    Businessman
    Location:
    Weston super Mare
    Heritage Railway Volunteer:
    Yes I am an active volunteer
    Yawn

    Please pack it in - not funny and not clever


    Sent from my iPhone using Tapatalk
     
  13. Triumph 2500S

    Triumph 2500S Well-Known Member

    Joined:
    Jul 26, 2014
    Messages:
    1,066
    Likes Received:
    933
    Gender:
    Male
    Occupation:
    Retired
    Location:
    Swindon
    Heritage Railway Volunteer:
    No I do not currently volunteer
    I think the significant issue regarding the Scotsman relay was that it was done at very short notice and as I understand it was carried out by contractors exclusively so for those reasons alone would be unnecessarily expensive
     
    jnc likes this.
  14. jma1009

    jma1009 Well-Known Member

    Joined:
    Mar 16, 2013
    Messages:
    1,381
    Likes Received:
    1,637
    Gender:
    Male
    Location:
    ynysddu south wales
    And presumably was something the PLC board had to approve at the time, and something that cannot be a reason for a newly constituted board voting off Ian Coleby as Chairman, as track maintenance is a long term matter, and also something he had no expertise of.

    Seems an irrelevant matter to bring up. Cancel Flying Scotsman's visit, or do some expensive track repairs? Nothing the fault of Ian Coleby - but his previous Chairmen and Boards would be culpable.

    Cheers,

    Julian
     
  15. martin1656

    martin1656 Nat Pres stalwart Friend

    Joined:
    Dec 8, 2014
    Messages:
    17,609
    Likes Received:
    11,222
    Gender:
    Male
    Location:
    St Leonards
    Heritage Railway Volunteer:
    No I do not currently volunteer
    And that I would say sums it up, the SVR have an supporters organisation that Supports the company that runs the SVR, financially as well as by providing the workforce , clearly the WSR needs to change to somehow reduce its outgoings, either by more reliance on volunteer projects, or by how it delivers the product, that much is clear, on the ground clearly groups do work together , so that's not the problem, I do wonder how much of the present problems are in effect as result of past mistakes, and lessons being slow to be learnt, airing your dirty linen in public being one of them, disagree by all means, but not open for all to see, if the members consider that a director, or trustee is going beyond their remit then due process must be observed, and its for the members to decide, or shareholders, if any action is found to not meet their their support and to call the necessary meetings to remedy it.
    As regards cutting overheads, there is only a limited number of ways, cut the number of steam turns, to reduce the coal bill and either run more diesel turns, or more DMU turns, until you get costs under control, where costs are duplicated between organisations, have central ordering, to maximise bulk purchases for the railway on things like food items
     
  16. gwilialan

    gwilialan Well-Known Member

    Joined:
    Dec 8, 2012
    Messages:
    1,658
    Likes Received:
    3,891
    Gender:
    Male
    Location:
    Out there somewhere
    Heritage Railway Volunteer:
    Yes I am an active volunteer
    Very true and my apologies to any individuals upset by my attempt at lighthearted comments.

    It is undoubtedly a serious matter that does need careful and thoughtful consideration by all parties. The problem is how can we have a serious discussion when we are being treated to a wall of silence from those parties whom we would expect to have at least made some sort of formal statement by now? It is no wonder speculation is rife and conjecture running wild on here. Then there are the inter-personal rivalries that always seem to rear their ugly heads in public as soon as anything contentious happens at the WSR. I do not think I am alone in becoming more than a little tired of that.

    If details were known they could be discussed seriously. If, for example, an Extraordinary General Meeting was being called serious suggestions for motions could be made etc. etc.

    If the discussion on here was based solely on the known details then we'd only be on page 3 or 4 and not 26. With all the wild speculation and unsubstantiated rumours flying around is it any wonder that some find it difficult not to treat some of the more outrageous posts or posters to a little gentle humour?
     
  17. jnc

    jnc Well-Known Member

    Joined:
    Apr 3, 2012
    Messages:
    1,511
    Likes Received:
    2,706
    Gender:
    Male
    Location:
    Western Atlantic
    Heritage Railway Volunteer:
    No I do not currently volunteer
    I'd be very interested in the answer to this one.

    Noel
     
  18. jma1009

    jma1009 Well-Known Member

    Joined:
    Mar 16, 2013
    Messages:
    1,381
    Likes Received:
    1,637
    Gender:
    Male
    Location:
    ynysddu south wales
    I suggest the obvious inference was that Frank made a mistake and regretted his decision to resign.

    Perfectly understandable, and I do not see why Messrs Whitehouse and White et al should have got so upset by this.

    Given the machinations Frank dealt with as WSRA Chairman to get the Ex-6 trustees evicted, which Messrs Whitehouse and White turned a blind eye to at the time, it seems a bit rich for them to insist on strict adherence to protocal a week or so ago, and remove him as a WSRA trustee. Double standards?

    Seems a total mess to me with lots of unanswered questions still, with principle players (usually very vocal on here) staying silent on the salient matters.

    Cheers,

    Julian
     
    Last edited: Aug 30, 2018
    tracker and Greenway like this.
  19. jnc

    jnc Well-Known Member

    Joined:
    Apr 3, 2012
    Messages:
    1,511
    Likes Received:
    2,706
    Gender:
    Male
    Location:
    Western Atlantic
    Heritage Railway Volunteer:
    No I do not currently volunteer
    I could easily come up with a number of hypothetical explanations, but since the person in question is posting here, rather than speculate, I'd find an answer from him to be much superior.

    Noel
     
    baldbof, Bean-counter, 35B and 3 others like this.
  20. johnofwessex

    johnofwessex Resident of Nat Pres

    Joined:
    Apr 6, 2015
    Messages:
    9,185
    Likes Received:
    7,226
    Gender:
    Male
    Occupation:
    Thorn in my managers side
    Location:
    72
    Heritage Railway Volunteer:
    No I do not currently volunteer
    I remember some years ago having a discussion with a psychiatrist about Northern Irish politics.

    What it boiled down to was that anyone with anything to offer left the province as soon as they could hence the quality of the politicians.

    I wonder if the WSR might suffer in the same way?
     
Thread Status:
Not open for further replies.

Share This Page