If you register, you can do a lot more. And become an active part of our growing community. You'll have access to hidden forums, and enjoy the ability of replying and starting conversations.

Brighton Atlantic: 32424 Beachy Head

Discussion in 'Steam Traction' started by Maunsell man, Oct 20, 2009.

  1. S.A.C. Martin

    S.A.C. Martin Part of the furniture

    Joined:
    Aug 31, 2010
    Messages:
    5,591
    Likes Received:
    9,325
    Gender:
    Male
    Occupation:
    Asset Engineer (Signalling), MNLPS Treasurer
    Location:
    London
    Heritage Railway Volunteer:
    Yes I am an active volunteer
    That is very interesting! So in theory - if true - Beachy Head could be this boilers first loco?

    That puts a rather different, rather beautiful slant to it.
     
  2. andrewshimmin

    andrewshimmin Well-Known Member

    Joined:
    Mar 18, 2011
    Messages:
    1,761
    Likes Received:
    2,160
    Heritage Railway Volunteer:
    No I do not currently volunteer
    It is entirely authentic steam-era railway accounting. In a way, it is preserving an important part of railway operation....
     
  3. Miff

    Miff Part of the furniture Friend

    Joined:
    Jun 17, 2008
    Messages:
    2,857
    Likes Received:
    2,793
    I doubt it - unless the Bluebell are accounting for it from the ‘wrong’ budget :)

    It’s a brand new locomotive - isn’t that brilliant?
     
    S.A.C. Martin likes this.
  4. andrewshimmin

    andrewshimmin Well-Known Member

    Joined:
    Mar 18, 2011
    Messages:
    1,761
    Likes Received:
    2,160
    Heritage Railway Volunteer:
    No I do not currently volunteer
    It is indeed. I can't wait. I love Atlantics, too
    But "real" railways often accounted brand new locos as rebuilds. The LNWR was always at it, for example. There are several well known examples of the "rebuild" entering service before the "scrapped" loco had been touched. One LNER pacific "rebuild" passed its alleged former self outside the works...
    It's all to do with revenue, capital and tax...
    At Crewe, a "rebuild" or "renewal" sometimes consisted of engine into works, new engine built, shift a few bits of expensive non-ferrous across (even number plates would be new), old engine dismantled, new engine out of the door.
    People who don't get this often get very excited about the "rebuilt" Scots and Patriots, but by Crewe standards that was just a heavy overhaul.
     
    Last edited: Aug 6, 2018
    Bluenosejohn, jnc and Miff like this.
  5. Miff

    Miff Part of the furniture Friend

    Joined:
    Jun 17, 2008
    Messages:
    2,857
    Likes Received:
    2,793
    There’s also the myth that it was done to ‘fool’ the accountants whereas I reckon they always knew.
     
    andrewshimmin and jnc like this.
  6. S.A.C. Martin

    S.A.C. Martin Part of the furniture

    Joined:
    Aug 31, 2010
    Messages:
    5,591
    Likes Received:
    9,325
    Gender:
    Male
    Occupation:
    Asset Engineer (Signalling), MNLPS Treasurer
    Location:
    London
    Heritage Railway Volunteer:
    Yes I am an active volunteer
    This is apparently true for Merry Hampton...and Great Northern, given her original frames were passed on shortly after she was dismantled for rebuilding into the A1/1 (in reality only the tender, driving wheels, some bits off the cab and the cartazzi arrangement survived).

    Does make you realise that these railways were not an enthusiasts' paradise, they were working railways.
     
    ragl and Bluenosejohn like this.
  7. Enterprise

    Enterprise Part of the furniture

    Joined:
    Sep 9, 2005
    Messages:
    5,275
    Likes Received:
    3,077
    They were both!
     
    Bluenosejohn and S.A.C. Martin like this.
  8. S.A.C. Martin

    S.A.C. Martin Part of the furniture

    Joined:
    Aug 31, 2010
    Messages:
    5,591
    Likes Received:
    9,325
    Gender:
    Male
    Occupation:
    Asset Engineer (Signalling), MNLPS Treasurer
    Location:
    London
    Heritage Railway Volunteer:
    Yes I am an active volunteer
    I stand corrected. :)
     
  9. huochemi

    huochemi Part of the furniture

    Joined:
    May 6, 2008
    Messages:
    2,751
    Likes Received:
    1,393
    Gender:
    Male
    Location:
    UK
    Heritage Railway Volunteer:
    No I do not currently volunteer
    I think the accounting/reporting for the pre-nationalised railways was done to a detailed statutory schedule. I am not sure I fully understand the "renewals" concept but it seems as though the capital expenditure line may have been reserved for expansion capex. Thus the GWR Kings for instance appear to have been entirely classified as renewals rather than capex, and some at least of their external contractor-built locos were also considered renewals. I assume the renewals fund was effectively a different name for what would otherwise be part of the depreciation balance, but I have not got to the bottom of that. I don't think tax was a big driver (at least not latterly) as the Big Four were generally not in a tax-paying position.
     
    andrewshimmin likes this.
  10. class8mikado

    class8mikado Part of the furniture

    Joined:
    Jun 1, 2009
    Messages:
    3,609
    Likes Received:
    1,438
    Occupation:
    Print Estimator/ Repository of Useless Informatio.
    Location:
    Bingley W.Yorks.
    Heritage Railway Volunteer:
    No I do not currently volunteer
    Easier to convince a board to sanction a renewal work budget as this would seem to be an on going necessity / overhead rather than new items which might be seen as less so without a worked up case of cost benefit.
     
    andrewshimmin likes this.
  11. Jimc

    Jimc Part of the furniture

    Joined:
    Sep 8, 2005
    Messages:
    4,052
    Likes Received:
    4,665
    Occupation:
    Once computers, now part time writer I suppose.
    Location:
    SE England
    Heritage Railway Volunteer:
    No I do not currently volunteer
    That's pretty much my understanding. I looked up renewal in 18th/19thC dictionaries on line, and in those days its meaning was much more like "replace with new" rather than "repair like new". In the 19thC a life expired 2-2-2 would be replaced with a new 2-2-2, and if there were parts of the old one that could be reused, well that was a bit of a saving. Once they were replacing 4-2-2s with 4-6-0s it got rather more complicated of course.

    Where budgets came into it was that repairs had to be paid for out of revenue. So if there was very little revenue it was a considerable advantage if a major rebuild could be classified as a renewal. This is often - and I've been guilty of it myself - presented as an attempt to fool the accountants, but on reflection I think it much more likely that the accountants knew exactly what was going on.
     
    Last edited: Aug 7, 2018
  12. 35B

    35B Nat Pres stalwart

    Joined:
    Jun 18, 2011
    Messages:
    25,483
    Likes Received:
    23,713
    Gender:
    Male
    Location:
    Grantham
    Heritage Railway Volunteer:
    No I do not currently volunteer
    I seem to remember reading somewhere - I think about the Festiniog Railway - that the accounting definition of the value of a company was very different in that era, and much more tightly aligned to the face value of the shares than is now the case. I imagine that this would have required considerable care over definitions of work, and how they affected the value of the company.
     
    andrewshimmin likes this.
  13. LMS2968

    LMS2968 Part of the furniture

    Joined:
    Sep 1, 2006
    Messages:
    2,987
    Likes Received:
    5,084
    Gender:
    Male
    Occupation:
    Lecturer retired: Archivist of Stanier Mogul Fund
    Location:
    Wigan
    Heritage Railway Volunteer:
    Yes I am an active volunteer
    The LNWR - and others - ordered new locos through either the Capital or Revenue Accounts. Basically, Capital engines were new in all senses of the word, while Revenue engines would each replace and existing engine, and so not add to the number of engines in stock. 'Capital' engines would receive new numbers in sequence as each engine entered traffic; 'Revenue' engines would take on the number of the displaced engine. Since the new engine might have absolutely nothing in common with its predecessor, Revenue engines' numbers followed no pattern and explains the LNWR's apparently random numbering system.
     
  14. Jamessquared

    Jamessquared Nat Pres stalwart

    Joined:
    Mar 8, 2008
    Messages:
    26,099
    Likes Received:
    57,414
    Location:
    LBSC 215
    Heritage Railway Volunteer:
    Yes I am an active volunteer
    You could replace "LNWR" with "LSWR" in the above and not substantially change anything else - least of all the erratic numbering sequence. In the days before having formal duplicate lists, if an engine was renewed but the old engine had a continuing existence, you'd have engines referred to as e.g. "Bison" (current capital stock loco) and "the old engine Bison" (duplicate stock loco).

    It's struck me that in the 100 year period between the Stockton and Darlington Railway and the Grouping, not only did modern railways develop into something of a recognisably modern form, but so did modern companies. I've always wondered to what extent the railways - as amongst the largest enterprises then in existence - drove development of modern methods / understanding of accounting and company structure.

    Tom
     
    domeyhead, jnc, Richard Roper and 3 others like this.
  15. andrewshimmin

    andrewshimmin Well-Known Member

    Joined:
    Mar 18, 2011
    Messages:
    1,761
    Likes Received:
    2,160
    Heritage Railway Volunteer:
    No I do not currently volunteer
    @Jamessquared The railway companies were utterly formative in terms of the modern understanding of what a company is.
    In G. Stevenson's day, when people thought of a company, they thought of the East India Company or the Hudson's Bay Company.
    The railway companies were the largest joint stock companies in Britain and many other countries, and had the sort of structures and systems we would now recognise - lots of shareholders, a board led by a chairman, general managers separate from the chairman, departments with internal responsibility and organisation, annual budgets, operation and maintenance processes, defined prices for their services, fixed and moveable assets.... The list could go on.
     
  16. Jamessquared

    Jamessquared Nat Pres stalwart

    Joined:
    Mar 8, 2008
    Messages:
    26,099
    Likes Received:
    57,414
    Location:
    LBSC 215
    Heritage Railway Volunteer:
    Yes I am an active volunteer
    Latest update:

    http://www.bluebell-railway.co.uk/bluebell/locos/atlantic/latest.html

    Boiler and tender out of the works, and discussion of construction of the tender tank amongst other things. The crane lift shown was the same day that 84030 was rewheeled - one of the unseen facets of these kind of project is is the interdependencies on other projects.

    Tom
     
  17. Dan Hamblin

    Dan Hamblin Part of the furniture

    Joined:
    Mar 27, 2006
    Messages:
    2,544
    Likes Received:
    181
    Occupation:
    Rolling Stock Engineer
    Location:
    Kent
    Good to see more progress, hopefully will get the chance to view it tomorrow as part of the Shareholders Weekend as Atlantic House will be open.

    Regards,

    Dan
     
    S.A.C. Martin and Jamessquared like this.
  18. WishIHadAName

    WishIHadAName New Member

    Joined:
    Aug 7, 2013
    Messages:
    194
    Likes Received:
    163
    Gender:
    Male
    Heritage Railway Volunteer:
    Yes I am an active volunteer
    How come its getting air brakes?
     
  19. Jamessquared

    Jamessquared Nat Pres stalwart

    Joined:
    Mar 8, 2008
    Messages:
    26,099
    Likes Received:
    57,414
    Location:
    LBSC 215
    Heritage Railway Volunteer:
    Yes I am an active volunteer
    Because the original had air brakes - the LBSCR was an air-braked line.

    The reverser is also power-assisted using compressed air.

    Tom
     
  20. misspentyouth62

    misspentyouth62 Well-Known Member

    Joined:
    Nov 8, 2017
    Messages:
    1,381
    Likes Received:
    1,737
    Gender:
    Male
    Location:
    34D, now flexible
    Heritage Railway Volunteer:
    No I do not currently volunteer

Share This Page