If you register, you can do a lot more. And become an active part of our growing community. You'll have access to hidden forums, and enjoy the ability of replying and starting conversations.

Slam door Mk3s wanted.

Dieses Thema im Forum 'Heritage Railways & Centres in the UK' wurde von tilling gestartet, 8 September 2017.

  1. tilling

    tilling New Member

    Registriert seit:
    11 September 2009
    Beiträge:
    108
    Zustimmungen:
    65
    Beruf:
    retired
    Ort:
    sheffield
    Someone asked me to help find some slam door Mk3s for sale, or even an InterCity set. No idea where to start...


    Sent from my iPhone using Tapatalk
     
  2. banburysaint

    banburysaint Member

    Registriert seit:
    12 Januar 2008
    Beiträge:
    324
    Zustimmungen:
    431
    DB regio UK own many mk3s that are stored. Might be worth approaching them?

    Sent from my PRA-LX1 using Tapatalk
     
    tilling gefällt dies.
  3. Reading General

    Reading General Part of the furniture

    Registriert seit:
    18 Mai 2011
    Beiträge:
    6.081
    Zustimmungen:
    2.217
    weren't they all slam door? Only the Irish version had power doors afaik
     
  4. Platform 3

    Platform 3 Member

    Registriert seit:
    20 April 2015
    Beiträge:
    881
    Zustimmungen:
    1.197
    Geschlecht:
    männlich
    Heritage Railway Volunteer:
    No I do not currently volunteer
    Originally yes, but that has changed in recent years thanks to Chiltern.

    Sent from my SM-J330FN using Tapatalk
     
  5. Matt37401

    Matt37401 Nat Pres stalwart

    Registriert seit:
    8 Juni 2014
    Beiträge:
    15.554
    Zustimmungen:
    11.961
    Ort:
    Wnxx
    Heritage Railway Volunteer:
    No I do not currently volunteer
    The Chiltern ones have sliding doors as do the unit derived ones.
     
  6. 35B

    35B Nat Pres stalwart

    Registriert seit:
    18 Juni 2011
    Beiträge:
    29.245
    Zustimmungen:
    29.712
    Geschlecht:
    männlich
    Ort:
    Grantham
    Heritage Railway Volunteer:
    No I do not currently volunteer
    They do, and the HSTs being refurbished for Scotrail and GWR will do. But only the Irish ones were built with power doors - those over here with them were all retrofitted.
     
    banburysaint gefällt dies.
  7. Reading General

    Reading General Part of the furniture

    Registriert seit:
    18 Mai 2011
    Beiträge:
    6.081
    Zustimmungen:
    2.217
    interesting but none of them are likely to be for sale.
     
  8. Platform 3

    Platform 3 Member

    Registriert seit:
    20 April 2015
    Beiträge:
    881
    Zustimmungen:
    1.197
    Geschlecht:
    männlich
    Heritage Railway Volunteer:
    No I do not currently volunteer
    I suspect that some slam door ones might become available over the next 2 to 3 years as GWR divests itself, and as Greater Anglia loses its loco-hauled varients.

    Sent from my SM-J330FN using Tapatalk
     
    tilling gefällt dies.
  9. AndyY

    AndyY Member

    Registriert seit:
    23 Februar 2013
    Beiträge:
    433
    Zustimmungen:
    480
    The Trust building the new P2 'Prince of Wales' have said they plan to own a rake of Mk3s - it might be worth talking to them for advice on how to go about it.

    Andy
     
    tilling gefällt dies.
  10. toplight

    toplight Well-Known Member

    Registriert seit:
    18 Mai 2009
    Beiträge:
    1.351
    Zustimmungen:
    1.288
    Ort:
    Swindon, England
    Heritage Railway Volunteer:
    Yes I am an active volunteer
    There is one Mark 3 for sale here

    http://www.carriage-exchange.org.uk/stock.htm

    You can try looking at the carriage database here http://www.cs.vintagecarriagestrust.org/se/search.asp and then approach the owner of any vehicle you are interested in. However this Database only covers preserved vehicles and as I am sure you know there are plenty of Mark 3s in daily use on the national network so they wont appear here as they arn't preserved.

    Might help if you say why you want it ? is to run or as static etc ?
     
    tilling gefällt dies.
  11. Reading General

    Reading General Part of the furniture

    Registriert seit:
    18 Mai 2011
    Beiträge:
    6.081
    Zustimmungen:
    2.217
    i meant the sliding door conversions.
     
  12. Romsey

    Romsey Part of the furniture

    Registriert seit:
    14 Juli 2007
    Beiträge:
    3.899
    Zustimmungen:
    1.886
    Geschlecht:
    männlich
    Beruf:
    Retired SPM
    Ort:
    Close to Bridge 200
    Heritage Railway Volunteer:
    Yes I am an active volunteer
    Contact rolling stock leasing companies who will have surplus slam door mark 3's as HST's and Norwich loco hauled sets are replaced. ( Allowing for reuse by Scotrail.)

    Cheers, Neil
     
    tilling gefällt dies.
  13. W.Williams

    W.Williams Well-Known Member

    Registriert seit:
    20 Dezember 2015
    Beiträge:
    1.658
    Zustimmungen:
    1.572
    Beruf:
    Mechanical Engineer
    Ort:
    Aberdeenshire
    Heritage Railway Volunteer:
    Yes I am an active volunteer
    The HST sets that are coming up to Scotland as I understand it, will be getting reduced to trainsets comprising 4 and 5 coaches. I know, I know, 4 coaches between two power cars, Its beyond daft, dont get me started, the 8 coaches currently used would be more than utilised between Edinburgh and Glasgow to Aberdeen and Inverness. What confuses the **** out of me is that the current 6 car 170 sets from Aberdeen are nearly always full as it is...I really must write to someone to get some answers on this...sorry for the rant...

    " This aligns with the completion of Network Rail’s Highland main line journey time improvements project. 54 power cars and 121 coaches will be leased from Angel Trains. These will make up 17 five-coach trains and 9 four- coach trains with two power cars spare. The 2019 timetable will require 23 trains in service each day with five coach sets operating Central Belt to Aberdeen services and the four coach trains generally running to Inverness. The number of through services from Inverness to the Central Belt via Aberdeen will also be increased." https://www.railengineer.uk/2017/03/23/scotrails-new-hsts/

    So seeing as these are all ex GWR 8 coach sets, AIUI, that leaves by my calcs in excess of 80 coaches going spare...they must be going somewhere...why not start by asking angel trains?


    arrrghgh it jsut gets worse they are limiting them to 100MPH whyyyyyyyyyyyyyyyyyyyyyyyyyyyyyyyyyyy!!!!!!
     
    Last edited: 9 September 2017
    tilling gefällt dies.
  14. M59137

    M59137 Well-Known Member

    Registriert seit:
    23 September 2009
    Beiträge:
    1.397
    Zustimmungen:
    2.404
    Geschlecht:
    männlich
    Beruf:
    Carriage & Wagon
    Ort:
    Sheringham
    Heritage Railway Volunteer:
    Yes I am an active volunteer
    These coaches are already coming out of service/store, with several going to the Mid Norfolk and Great Central Nottingham recently.

    Sent from my HTC Desire 620 using Tapatalk
     
    tilling gefällt dies.
  15. I completely agree, I would have thought TF-Buffet-TSO-TSO-TSO-TGS would have made a lot more sense, even if half the TF was downgraded to Standard and the buffet area was just used as a place for the trolley staff to hang out.

    That said, the acceleration of 5000-odd hp on four Mk3s is going to be interesting. Despite the gradient, southbound drivers at Usan opening up after the single line section will probably hit the ton by the next overbridge.

    Sorry, OT and NP... :oops:
     
    W.Williams und tilling gefällt dies.
  16. W.Williams

    W.Williams Well-Known Member

    Registriert seit:
    20 Dezember 2015
    Beiträge:
    1.658
    Zustimmungen:
    1.572
    Beruf:
    Mechanical Engineer
    Ort:
    Aberdeenshire
    Heritage Railway Volunteer:
    Yes I am an active volunteer
    Bear in mind, one whole coach is going to be 1st class AIUI. So that means its effectively 3 coaches! The mind reels...
     
  17. MellishR

    MellishR Resident of Nat Pres Friend

    Registriert seit:
    16 April 2009
    Beiträge:
    9.006
    Zustimmungen:
    5.927
    Has any explanation been offered or asked for? Are they perhaps thinking that short trains are the easiest way (though not the best way) of dealing with short platforms at some stations?
     
  18. threelinkdave

    threelinkdave Well-Known Member

    Registriert seit:
    1 August 2013
    Beiträge:
    2.065
    Zustimmungen:
    1.240
    Geschlecht:
    männlich
    Beruf:
    Retired
    Ort:
    Stratford-upon-Avon or in a brake KD to BH
    Heritage Railway Volunteer:
    Yes I am an active volunteer
    Just one little issue to consider. The ETH is different on hauled coaches to that in HSTs. Cant remember the detail but something to consider
     
    tilling gefällt dies.
  19. 35B

    35B Nat Pres stalwart

    Registriert seit:
    18 Juni 2011
    Beiträge:
    29.245
    Zustimmungen:
    29.712
    Geschlecht:
    männlich
    Ort:
    Grantham
    Heritage Railway Volunteer:
    No I do not currently volunteer
    HSTs use 3 phase supply, whereas loco hauled use locomotive provided ETH supply. I believe that's why the MkIIIs used with 41001 are ex LHCS, not HST.
     
    tilling gefällt dies.
  20. W.Williams

    W.Williams Well-Known Member

    Registriert seit:
    20 Dezember 2015
    Beiträge:
    1.658
    Zustimmungen:
    1.572
    Beruf:
    Mechanical Engineer
    Ort:
    Aberdeenshire
    Heritage Railway Volunteer:
    Yes I am an active volunteer
    I dont think anyone has asked as yet, I really think I might.

    Size is an issue with a lot of the platforms on the routes they are going to run on, but the key reason they are being introduced is 1. capacity and 2. they found out people would wait to get on a KGX from Aberdeen to Edinburgh using what was the East Coast because there was more space and it was more comfortable. This is whats driven this.

    Apologies to the mods, iv clearly dragged this way off topic.
     

Die Seite empfehlen