If you register, you can do a lot more. And become an active part of our growing community. You'll have access to hidden forums, and enjoy the ability of replying and starting conversations.

Replica builds for heritage lines.

Discussion in 'Steam Traction' started by 50044 Exeter, Apr 25, 2016.

  1. Cartman

    Cartman Well-Known Member Account Suspended

    Joined:
    Dec 14, 2015
    Messages:
    2,290
    Likes Received:
    1,672
    Gender:
    Male
    Occupation:
    Van driver
    Location:
    Cheshire
    Heritage Railway Volunteer:
    No I do not currently volunteer
    Wasn't the O1 0-6-0 originally SER?
     
  2. Jamessquared

    Jamessquared Nat Pres stalwart

    Joined:
    Mar 8, 2008
    Messages:
    26,103
    Likes Received:
    57,432
    Location:
    LBSC 215
    Heritage Railway Volunteer:
    Yes I am an active volunteer
    At the Bluebell, needless to say! The O1 No. 65 was built in 1896 (but to a design dating back to the 1870s) by the SER as a Stirling O class; reboilered and received a new cab by Wainwright in 1906 and reclassified O1. So the underframe and tender are SER; but boiler and cab are SECR era.

    In its original form, it had the typical Stirling hallmarks of domeless boiler and round-top cab; as preserved it looks more like a typical Wainwright product.

    [​IMG]

    http://spellerweb.net/rhindex/UKRH/SECR/SERlocos.html

    Tom
     
    Last edited: Apr 26, 2016
    S.A.C. Martin likes this.
  3. 1472

    1472 Well-Known Member

    Joined:
    Aug 26, 2008
    Messages:
    1,898
    Likes Received:
    2,517
    Heritage Railway Volunteer:
    Yes I am an active volunteer
    I'm surprised nobody has done that with redundant 08 diesel wheelsets/axleboxes/horns/coupling rods etc.

    I have to say though that all this dreaming is just more "train spotting". We simply don't need any more locos new or old just more support for the ones which need funding & practical help to make them reliable runners again.
     
  4. 1472

    1472 Well-Known Member

    Joined:
    Aug 26, 2008
    Messages:
    1,898
    Likes Received:
    2,517
    Heritage Railway Volunteer:
    Yes I am an active volunteer
    But you are confusing two things. Heritage lines need reliable steam power of authentic but simple to maintain types preferably not one offs but using standardised components. There core business is in shifting a paying non enthusiast public economically for survival.

    Enthusiasts dream about all these obscure types - but most remain just that - an impractical dream.
     
  5. Johnb

    Johnb Nat Pres stalwart

    Joined:
    Dec 3, 2014
    Messages:
    14,318
    Likes Received:
    16,394
    Gender:
    Male
    Occupation:
    Retired, best job I've ever had
    Location:
    Buckinghamshire
    Heritage Railway Volunteer:
    Yes I am an active volunteer
    Thanks I've learnt something, I always thought the little 2-2-2 was there to help get them moving if the receiver was choked and the slip eccentric didn't reverse the low pressure engine.
     
    Last edited: Apr 26, 2016
  6. Johnb

    Johnb Nat Pres stalwart

    Joined:
    Dec 3, 2014
    Messages:
    14,318
    Likes Received:
    16,394
    Gender:
    Male
    Occupation:
    Retired, best job I've ever had
    Location:
    Buckinghamshire
    Heritage Railway Volunteer:
    Yes I am an active volunteer
    The O1 I think
     
  7. John Petley

    John Petley Part of the furniture

    Joined:
    Oct 8, 2007
    Messages:
    2,849
    Likes Received:
    2,362
    Gender:
    Male
    Occupation:
    Researcher/writer and composer of classical music
    Location:
    Between LBSCR 221 and LBSCR 227
    Heritage Railway Volunteer:
    Yes I am an active volunteer
    Mind you, if ever anyone suggested building a replica of one of the LSWR Drummond 4-6-0s it would be crazy not to attempt to rectfy the design faults. They were handsome machines and one would look great on the Mid Hants, but looking good would be just about their only use if the severe steaming issues weren't addressed (Tom alias Jamessquared may be able to back me up here, but I think I read somewhere that the footplate crews said that the letters "LSWR" on their eight-wheeled tenders stood for "Lazy Swines Won't Run"!) If 71000 has been modified to correct known faults, why not a new build?

    However, I would agree that this really only makes sense for a new build of a design where the original had such problems. The G5, 82045 or Beachy Head will do all that is asked of them without the need for radical changes to the original specification. I have to admit, I would love to see a Drummond 4-6-0 constructed featuring the Koopmans treatment (see 6023 thread ) but considering that I probably represent a small, rather eccentric minority and don't have pots of money, it will probably remain a dream.
     
    Cartman likes this.
  8. class8mikado

    class8mikado Part of the furniture

    Joined:
    Jun 1, 2009
    Messages:
    3,610
    Likes Received:
    1,438
    Occupation:
    Print Estimator/ Repository of Useless Informatio.
    Location:
    Bingley W.Yorks.
    Heritage Railway Volunteer:
    No I do not currently volunteer
    Although the industrial fraternity wont be keen on me saying this but there are a Mass of Austerities in overhaul queue's that might be had for less than the cost of the new build set up ( though the wheels are somewhat distinctive....
     
  9. Miff

    Miff Part of the furniture Friend

    Joined:
    Jun 17, 2008
    Messages:
    2,857
    Likes Received:
    2,793
    And some of them have already suffered this terrible fate - look closely at certain locos called Thomas, Douglas, Iron Duke and maybe more.
     
    cjbarnes5294 and Cartman like this.
  10. Miff

    Miff Part of the furniture Friend

    Joined:
    Jun 17, 2008
    Messages:
    2,857
    Likes Received:
    2,793
    Yet few of these lines will survive purely on this commercial income. They also need the free labour and the free money provided principally by railway enthusiasts who will only do this if the railway is interesting enough to retain their loyalty. A balance must always be struck.

    If a purely commercial case can be made for a new 'standard' non-prototypical batch of locos then no doubt it will happen but so far the 5AT project has been abandoned due to lack of interest and I don't see any other modern standard-gauge designs getting off the ground just yet.

    I agree, apart from the several new-builds already completed; many of those currently under construction; and no doubt more to come. Enthusiasts seem to be willing to pay for them as well as dream.
     
  11. Hicks19862

    Hicks19862 Member

    Joined:
    Oct 6, 2015
    Messages:
    738
    Likes Received:
    612
    Gender:
    Male
    Location:
    Manchester
    Would a Gresley K3 have been a good engine for a preserved line?
     
  12. Cartman

    Cartman Well-Known Member Account Suspended

    Joined:
    Dec 14, 2015
    Messages:
    2,290
    Likes Received:
    1,672
    Gender:
    Male
    Occupation:
    Van driver
    Location:
    Cheshire
    Heritage Railway Volunteer:
    No I do not currently volunteer
    Don't see why not. Powerful loco
     
  13. Adam-Box

    Adam-Box Member

    Joined:
    Nov 1, 2015
    Messages:
    405
    Likes Received:
    84
    Gender:
    Male
    Location:
    South West
    Heritage Railway Volunteer:
    No I do not currently volunteer
    I wonder if the money is really best spent on new builds? Surely rescuing some if the engines rotting in sidings and headshunts across the country is a better way of spending it than building brand new engines.
     
    1472 and Wenlock like this.
  14. Martin Perry

    Martin Perry Nat Pres stalwart Staff Member Moderator Friend

    Joined:
    Apr 15, 2006
    Messages:
    16,510
    Likes Received:
    7,753
    Location:
    1012 / 60158
    Heritage Railway Volunteer:
    Yes I am an active volunteer
    You say 'the money' as if it is waiting there ready to be spent. That's the thing about new builds; they seem to attract funding that isn't available for existing projects.
     
  15. L&YR 2-4-2T 1008

    L&YR 2-4-2T 1008 New Member

    Joined:
    Jan 1, 2016
    Messages:
    49
    Likes Received:
    27
    Gender:
    Male
    Occupation:
    Signaller
    Location:
    Leeds
    Heritage Railway Volunteer:
    No I do not currently volunteer
    I would hazard a guess that this is because many existing locos in a current state of disrepair have steamed before in preservation, so many older enthusiasts won't be that interested as the saw it in say the 80s or 90s, where as new builds often resurrect a class which hasn't been seen for around 50 years, so they get backing from both the newer generation of enthusiasts and the old hands who may also have never seen that particular class in steam, making new builds more lucrative for a wider audience, at least, that theory seems to make sense
     
    Adam-Box likes this.
  16. Rosedale

    Rosedale Member

    Joined:
    Oct 23, 2015
    Messages:
    456
    Likes Received:
    435
    Gender:
    Male
    Location:
    Shipbourne
    Heritage Railway Volunteer:
    No I do not currently volunteer
    Exactly. Financially at least, preservation is not a zero sum game. Whether there is sufficient manpower for new builds plus the restoration of long term stored engines is a whole nother can of worms.
     
    1472 and Adam-Box like this.
  17. Jamessquared

    Jamessquared Nat Pres stalwart

    Joined:
    Mar 8, 2008
    Messages:
    26,103
    Likes Received:
    57,432
    Location:
    LBSC 215
    Heritage Railway Volunteer:
    Yes I am an active volunteer
    You also have to consider, in some cases, whether a new build would be cheaper and, arguably, better for preservation. I can think of at least a few preserved and complete locos where a restoration would require so much new material that a new build of the same loco would be very competitive on price, while allowing preservation of the original. But once you cross that line, it opens up the thought "if we are going to new build anyway, why new build loco X (which exists in preservation but is fundamentally worn out) when we could new build loco Y (which was sadly never preserved, but could be recreated)".

    Tom
     
    MellishR, Adam-Box and Rosedale like this.
  18. Jimc

    Jimc Part of the furniture

    Joined:
    Sep 8, 2005
    Messages:
    4,052
    Likes Received:
    4,665
    Occupation:
    Once computers, now part time writer I suppose.
    Location:
    SE England
    Heritage Railway Volunteer:
    No I do not currently volunteer
    The obvious answer is 'cos every time we can't find the drawing for a part or are trying to work out some arcane detail we get out the spanners and look at the old one... Plus of course if loco X is ideal for your requirements itwould be more sensible to build an X than a Y. But the wow factor is a problem.
     
  19. cjbarnes5294

    cjbarnes5294 New Member

    Joined:
    Apr 17, 2015
    Messages:
    30
    Likes Received:
    28
    Gender:
    Male
    Austerities, whilst brilliant little machines, are cannon fodder to the rebuild projects when compared to those unique (I think?) industrial locos that have been or are in the process of being transformed into Thomas, such as a 15 inch Hunslet and 48150 Hunslet. But then Thomas is an important source of much needed revenue for many lines and heritage centres... so I suggest the next Thomas rebuild should be a GWR pannier tank.:p

    I would suggest that a K3 would be a much bigger than necessary loco for most heritage lines, but for a few like the NYMR, such a beast coupled with a relatively short wheelbase would be a dreamboat loco, I think.

    Kind regards,
    Chris
     
  20. Rosedale

    Rosedale Member

    Joined:
    Oct 23, 2015
    Messages:
    456
    Likes Received:
    435
    Gender:
    Male
    Location:
    Shipbourne
    Heritage Railway Volunteer:
    No I do not currently volunteer
    Which I suppose brings us to 'Stepney'. ;)
     

Share This Page