If you register, you can do a lot more. And become an active part of our growing community. You'll have access to hidden forums, and enjoy the ability of replying and starting conversations.

What did they do before 'Bustituton'

Discussion in 'Steam Traction' started by johnofwessex, Sep 15, 2015.

  1. johnofwessex

    johnofwessex Resident of Nat Pres

    Joined:
    Apr 6, 2015
    Messages:
    9,798
    Likes Received:
    7,955
    Gender:
    Male
    Occupation:
    Thorn in my managers side
    Location:
    72
    Heritage Railway Volunteer:
    No I do not currently volunteer
    I think we are all familiar with replacement bus services at weekends due to engineering works.

    In Colin Maggs book on the Bristol - Radstock line he refers to a replacement bus service in the 1950's due to engineering work, but clearly in those days the buses and roads available made a poor substitute for rail in most cases.

    So, how did the railways deal with major works? Clearly there was single line working and they worked on lines in a way we would not tolerate today, but can anyone give more details as to how major line closures were dealt with?
     
  2. Martin Perry

    Martin Perry Nat Pres stalwart Staff Member Moderator Friend

    Joined:
    Apr 15, 2006
    Messages:
    16,552
    Likes Received:
    7,905
    Location:
    1012 / 60158
    Heritage Railway Volunteer:
    Yes I am an active volunteer
    There were more alternative routes for through trains. I also think that far more resources were supplied to ensure that any line closures were as short as possible.
     
  3. Ploughman

    Ploughman Part of the furniture

    Joined:
    Apr 1, 2008
    Messages:
    5,987
    Likes Received:
    2,767
    Occupation:
    Ex a lot of things.
    Location:
    Near where the 3 Ridings meet
    Heritage Railway Volunteer:
    Yes I am an active volunteer
    Another option was single line working.
     
  4. Jamessquared

    Jamessquared Nat Pres stalwart

    Joined:
    Mar 8, 2008
    Messages:
    28,067
    Likes Received:
    65,746
    Location:
    LBSC 215
    Heritage Railway Volunteer:
    Yes I am an active volunteer
    Were there fewer closures? I'm just wondering - if you need to relay a line with CWR, you don;t have much option but to close for an extended period. Whereas with jointed rails, you can replace individual rails and sleepers between trains but basically keep the line open, albeit working at a lower speed.

    Just a theory ...

    Tom
     
  5. Ploughman

    Ploughman Part of the furniture

    Joined:
    Apr 1, 2008
    Messages:
    5,987
    Likes Received:
    2,767
    Occupation:
    Ex a lot of things.
    Location:
    Near where the 3 Ridings meet
    Heritage Railway Volunteer:
    Yes I am an active volunteer


    More crossovers and more sidings to let a train pass.
    I think operators in the US do this today.
     
  6. Matt37401

    Matt37401 Nat Pres stalwart

    Joined:
    Jun 8, 2014
    Messages:
    15,554
    Likes Received:
    11,961
    Location:
    Wnxx
    Heritage Railway Volunteer:
    No I do not currently volunteer
    Just got on with running a railway.
     
  7. ragl

    ragl Well-Known Member

    Joined:
    Feb 3, 2010
    Messages:
    1,797
    Likes Received:
    1,935
    Gender:
    Male
    Occupation:
    Consultant Engineer
    Location:
    Shropshire
    Small typo niggle, I think that the spelling should be - "Bustitution".

    Cheers,

    Alan
     
  8. LesterBrown

    LesterBrown Member

    Joined:
    Jan 20, 2009
    Messages:
    995
    Likes Received:
    761
    Location:
    Devon
    I do recall reading of accidents involving removed rails. IIRC Charles Dickens was a passenger on a boat train where the ganger mis-read the timetable of this train which varied with the high tide time and ran through repair works.

    No doubt such procedures became safer with absolute block working but as suggested I suspect prolonged closures only came in with welded joints. The closure for the re-gauging of the west of England lines seemed to have been regarded as something exceptional.

    Sent from my SM-G900F using Tapatalk
     
  9. 22A

    22A Well-Known Member

    Joined:
    Sep 8, 2005
    Messages:
    1,106
    Likes Received:
    99
    Occupation:
    Administrator
    Location:
    Between 31F & 34E
    There were also far more ticket route options. I read in an article by a retired BR Ticket Inspector that a Kings Cross - Leeds return would require you to travel North on the ECML, but if necessary, (and only if necessary),you were allowed to divert.
    Leeds - Manchester - Wrexham - Paddington was permitted!
     
    Martin Perry likes this.
  10. Jimc

    Jimc Part of the furniture

    Joined:
    Sep 8, 2005
    Messages:
    4,117
    Likes Received:
    4,821
    Occupation:
    Once computers, now part time writer I suppose.
    Location:
    SE England
    Heritage Railway Volunteer:
    No I do not currently volunteer
    The footplate reminiscences books seem to talk about a lot of single line working.
     
  11. 46118

    46118 Part of the furniture

    Joined:
    Sep 16, 2005
    Messages:
    4,043
    Likes Received:
    212
    Apart from more alternative routes on which to divert services, bear in mind that back in the 1950's at least, many trunk routes had minimal services on Sunday, People by and large did not travel on Sunday, unlike today's "seven day" railway. So closing a line on Sunday for essential engineering work was not going to inconvenience all that many travellers.
     
  12. Forestpines

    Forestpines Well-Known Member

    Joined:
    Jun 5, 2009
    Messages:
    1,681
    Likes Received:
    2,438
    Gender:
    Female
    Location:
    Somewhere in the UK
    Heritage Railway Volunteer:
    Yes I am an active volunteer
    But that's similar to today, surely - if there are major issues tickets will be accepted by unusual routes.

    Even on a normal day, a London-Leeds open ticket is valid back to Kings Cross via the ECML, or via Lincoln and/or Cambridge, or to St Pancras.
     
  13. Spamcan81

    Spamcan81 Nat Pres stalwart

    Joined:
    Aug 25, 2007
    Messages:
    35,940
    Likes Received:
    22,469
    Occupation:
    Training moles
    Location:
    The back of beyond
    Heritage Railway Volunteer:
    Yes I am an active volunteer
    I travelled regularly on Sundays in the 70s and diversions were common as was single line working. In fact half the fun of some journeys was the weird and wonderful diversions. Checked off many a freight only route while travelling on service trains.
     
    athelney likes this.
  14. 99Z

    99Z Guest

    deleted
     
    Last edited by a moderator: Nov 8, 2015
    TonyMay, Bramblewick and johnnew like this.
  15. Fred Kerr

    Fred Kerr Resident of Nat Pres Friend

    Joined:
    Mar 24, 2006
    Messages:
    8,389
    Likes Received:
    5,374
    Gender:
    Male
    Occupation:
    Freelance photo - journalist
    Location:
    Southport
    Just to show how much flexibility existed ; in 1964 I wanted to travel from Leicester to Edinburgh and I calculated at least 64 different routes which were valid with my return ticket. Not only does that indicate the routeing flexibility but also the ticketing flexibility which no longer exists on the modern network !
     
  16. ilvaporista

    ilvaporista Part of the furniture

    Joined:
    Jan 16, 2006
    Messages:
    4,356
    Likes Received:
    5,456
    Gender:
    Male
    Occupation:
    C.Eng
    Location:
    On the 45th!
    Not to mention risk assessments, environmental impacts and all of the other 'helpful' hangers on that are associated with any project thesedays.
     
  17. threelinkdave

    threelinkdave Well-Known Member

    Joined:
    Aug 1, 2013
    Messages:
    2,065
    Likes Received:
    1,240
    Gender:
    Male
    Occupation:
    Retired
    Location:
    Stratford-upon-Avon or in a brake KD to BH
    Heritage Railway Volunteer:
    Yes I am an active volunteer
    buses were used but usually limited to a couple or three stations. Virtually every station had a crossover road so trains could be turned back either side of works, which made sence. Even in the 80s at Staplehurst in Kent the stopper ran Charring Cross - Staplehurst. Bus to Headcorn. Shuttle train Headcorn - Ashford. Now they close the whole route Tonbridge - Ashford.

    There were some modern outfits which got it right, the much missed Wrexham and Shropshire. The direct route via Teford was blocked and buses used. However W&S had other ideas and advertised direct servis to Shrewsbury. How did they do it? We went Wolverhampton - Stafford (pass) Crew (pass) - Wrexham and all stations to Shrewsbury in reverse order.
     
  18. peckett

    peckett Member

    Joined:
    Sep 26, 2006
    Messages:
    952
    Likes Received:
    634
    Are you sure this wasn't a all lines rail rover.I think 30 miles down the line at Kettering there was about 4.
     
  19. johnnew

    johnnew Member

    Joined:
    Nov 2, 2007
    Messages:
    656
    Likes Received:
    124
    Occupation:
    PRO The Stephenson Locomotive Soc.
    Location:
    Dorset, UK
    Heritage Railway Volunteer:
    Yes I am an active volunteer
    They even used horse drawn coaches. Did a talk on the former London & Southampton route recently and horse drawn bustitution was used during construction of IIRC the Winchester - Basingstoke section as the bits either side were already running trains,


    Sent from my iPad using Tapatalk
     

Share This Page