    Looks like the RVR has now been reconnected to the national network reestablishing the link that was removed in (I'm guessing) 1972-3?

    http://rvrailway.blogspot.co.uk/

    http://3.bp.blogspot.com/-bNwGCN02MfA/VQxjfLxj94I/AAAAAAAAhGo/G9ZVFTRJJJ4/s1600/P1070362.JPG
     
    已获得Bramblewick的支持.
  2. sycamore

    sycamore Member

    注册日期:
    2009-08-17
    帖子:
    601
    支持:
    239
    性别:
    所在地:
    .
    Heritage Railway Volunteer:
    No I do not currently volunteer
    Congratulations all round! Does this make them the shortest (for now) Heritage Railway with a mainline connection??? Either way, well done to all concerned
     
  3. domeyhead

    domeyhead Member

    注册日期:
    2007-05-16
    帖子:
    408
    支持:
    191
    Well done to all - it's a fantastic achievement. How are things developing with regard to securing the missing couple of miles between Robertsbridge and the Head of steel west of Bodiam?
     
  4. steve45110

    steve45110 Member

    注册日期:
    2005-09-10
    帖子:
    309
    支持:
    45
    性别:
    Nice to see a line that does things the logical way. A main line connection first then, extend outwards from it. Instead of starting in the middle, then extending even further away from the main line, not towards it.
     
  5. martin1656

    martin1656 Guest

    Very usefull for bringing in ballast once they start to relay the track, i think the line has its own tamper and lining machine so i would imagine that would work its way towards Robertsbridge once the actual track is reconnected, but of course that’s going to be quite a few years away yet at a guess about 3-4 , 3 to get the land and purchase orders, and aa year to lay in the level crossings and to lay the track.
     
  6. Martin Perry

    Martin Perry Nat Pres stalwart Staff Member Moderator Friend

    注册日期:
    2006-04-15
    帖子:
    16,554
    支持:
    7,906
    所在地:
    1012 / 60158
    Heritage Railway Volunteer:
    Yes I am an active volunteer
    How does the cost of bringing ballast in by rail stack up against road transport I wonder?
     
  7. martin1656

    martin1656 Guest

    i assume the bluebell worked out bringing in ballast by rail was cheaper? bring it in by rail , make a stockpile at Robertsbridge or lay ballast as the track progresses , if they transfer the tamper by road so that the PW train is all at the robertsbridge end
     
  8. Steve

    Steve Nat Pres stalwart Friend

    注册日期:
    2006-10-07
    帖子:
    13,185
    支持:
    13,014
    职业:
    Gentleman of leisure, nowadays
    所在地:
    Near Leeds
    Heritage Railway Volunteer:
    Yes I am an active volunteer
    I don't have any idea of the relative costs but the NYMR have started bringing in trainloads of ballast and they have a non-rail connected quarry on their doorstep. It may be simply down to the quality of the stone, though.
     
  9. Wenlock

    Wenlock Well-Known Member Friend

    注册日期:
    2008-10-26
    帖子:
    2,160
    支持:
    1,414
    性别:
    职业:
    Bus Driver
    所在地:
    Loughton Essex
    Heritage Railway Volunteer:
    No I do not currently volunteer
    Tamping can wait until there is a set of rails to run on. KESR members have 2 tampers (1 plain line, 1 S&C), a regulator and a TRAMM. I believe there is a smaller regulator at the RVR end of the line as well.
     